Bill total
2,175,914,452.65
-73.13 vs qty×rate
Needs review
534
93%
8 errors · 526 to acknowledge
Reconciliation
Does not reconcile
LINEPAGESECTIONZONEBILLSUMMARY
Source verification
10/13
independent proofs against the raw file
Size
7,621
550 collection blocks · 9 sheets
7 lines carry no item reference, though every other line on their page does
errorEither the reference was missed in the source, or the row is not an item.
SECTION J - FINISHES 4SECTION F - WOOD WORK 2SECTION B - SITE WORKS 1
- Type 12; size (2650+2400) x 625 x 3165mm high; L-shaped
- Type 12; size 1750 x 625 x 3165mm high
- Powerfloating
1 line does not multiply out — quantity × rate is not the amount shown
errorThe page total uses the printed amount, so the quantity is usually what is wrong.
SECTION R - ELECTRICAL INSTALLATIONS 1
- Allow for inspection, testing and commissioning including all off-site and factory testing; inspections to demonstrate compliance with relevant specifications and standards; operating the completed installations; submitting all relevant test record sheets at the completion of the installations
1 block does not add up to the collection total its own page prints
errorBoth figures are shown — neither is corrected to the other.
363 lines carry no rate, so nothing reaches the totals
to answerSay why the bidder left them unpriced, or ask them to price them.
— 122SECTION M - FURNISHING 101SECTION R - ELECTRICAL INSTALLATIONS 47SECTION L - EQUIPMENT 37+22 more sections
- Where any item, clause or sub-clause of the General Requirements has not been priced, it will be deemed that the value of such item, clause or sub-clause is included in the rates for measured items elsewhere in the Bills of Quantities.
- The rates and prices in these Bills of Quantities are fixed for the duration of the Contract and shall not be subject to any adjustment in respect of rise or fall in the cost of labour, materials, plant, equipment, transport or any other matters affecting the cost of execution of the Contract.
- References hereunder to the Schedule of Project Requirements (SOPR) are intended solely to direct the Contractor to the specific requirements of the Schedule of Project Requirements in respect of a particular item and do not in any way limit the scope of such item to the requirements of the Schedule of Project Requirements.
160 lines print words where a figure belongs
to answerAccept the wording as a class, or put it to the bidder.
SECTION R - ELECTRICAL INSTALLATIONS 75SECTION Q - MECHANICAL ENGINEERING INSTALLATIONS 34SECTION R - ELECTRICAL INSTALLATIONS 14SECTION Q - MECHANICAL ENGINEERING INSTALLATIONS 11+6 more sections
- 4 Contractor's All Risk Policy
- 7 Third Party liability insurance
- Removed off-site to approved location (RATE ONLY)
1 line restarts its lettering without a new heading
to answerUsually a heading the page prints that was not picked up.
SECTION C - CONCRETE WORKS 1
- Coupling beams
1 line repeats an item letter already used under the same heading
to answerKept exactly as printed — confirm which line the bidder meant.
SECTION R - ELECTRICAL INSTALLATIONS 1
- DB-T4-(04-05)-1BA1, TCL = 7.73kW
1 line has no heading above it while its neighbours do
to answerA governing heading may have been missed when the page was read.
SECTION B - SITE WORKS 1
- Allow for planting edging
| Item | Description | Qty | Unit | Rate | Amount | State |
|---|---|---|---|---|---|---|
— · GR1/1 0/3 clear0.00 Σ lines✗ 313,190,338.58 printed | ||||||
Generally Where any item, clause or sub-clause of the General Requirements has not been priced, it will be deemed that the value of such item, clause or sub-clause is included in the rates for measured items elsewhere in the Bills of Quantities.REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
Generally The rates and prices in these Bills of Quantities are fixed for the duration of the Contract and shall not be subject to any adjustment in respect of rise or fall in the cost of labour, materials, plant, equipment, transport or any other matters affecting the cost of execution of the Contract.REVIEWThe source prints neither a quantity nor a rate and the Amount cell is empty — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | — | Needs review | |
Generally References hereunder to the Schedule of Project Requirements (SOPR) are intended solely to direct the Contractor to the specific requirements of the Schedule of Project Requirements in respect of a particular item and do not in any way limit the scope of such item to the requirements of the Schedule of Project Requirements.REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
— · GR1/2 0/9 clear0.00 Σ lines✓ 0.00 printed | ||||||
A1.1- Schedule of Clauses 1 As per Emaar standard CoCREVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
A1.1- Schedule of Clauses 2 Advance Payment GuaranteeREVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
A1.1- Schedule of Clauses 3 Performance BondREVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
A1.1- Schedule of Clauses 4 Contractor's All Risk PolicyREVIEWAmount column prints "By Employer" — counted as 0.00 in the totals, exactly as the source's own page total does. Confirm this is intended (e.g. a RATE ONLY schedule). | — | Item | — | —By Employer | Needs review | |
A1.1- Schedule of Clauses 5 Workmen's Compensation InsuranceREVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
A1.1- Schedule of Clauses 6 Professional Indemnity insuranceREVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
A1.1- Schedule of Clauses 7 Third Party liability insuranceREVIEWAmount column prints "By Employer" — counted as 0.00 in the totals, exactly as the source's own page total does. Confirm this is intended (e.g. a RATE ONLY schedule). | — | Item | — | —By Employer | Needs review | |
A1.1- Schedule of Clauses 8 Plant and Contractor's Equipment InsuranceREVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
A1.1- Schedule of Clauses 9 Motor Vehicle Third Party and Passenger Liability InsuranceREVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
— · GR1/3 0/1 clear0.00 Σ lines✓ 0.00 printed | ||||||
A1.1- Schedule of Clauses The Contractor shall price hereunder any special requirements related to the specification clausesREVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
— · GR1/4 0/5 clear0.00 Σ lines✓ 0.00 printed | ||||||
A3 - Restrictions 1 Access for and Possession or use of the SiteREVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
A3 - Restrictions 2 Limitations of working spaceREVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
A3 - Restrictions 3 Limitations of working hoursREVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
A3 - Restrictions 4 The Maintenance of existing services on, under or over the SiteREVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
A3 - Restrictions 5 The Execution of the Works in the required specific order, sections or phasesREVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
— · GR1/5 0/7 clear0.00 Σ lines✓ 0.00 printed | ||||||
1 Office for the Contract administrators i. EstablishmentREVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
1 Office for the Contract administrators ii. MaintenanceREVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
1 Office for the Contract administrators iii. RemovalREVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
1 Office for the Contract administrators 2 SupervisionREVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
1 Office for the Contract administrators 3 SecurityREVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
1 Office for the Contract administrators 4 Safety, health and welfare of workpeopleREVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
1 Office for the Contract administrators 5 Transport of workpeopleREVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
— · GR1/6 0/16 clear0.00 Σ lines✓ 0.00 printed | ||||||
1 Small plant and tools i. Establishment (Fixed Charges)REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
1 Small plant and tools ii. Maintenance (Time Related Charges)REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
1 Small plant and tools iii. Removal (Fixed Charges)REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
2 Scaffoldings i. Establishment (Fixed Charges)REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
2 Scaffoldings ii. Maintenance (Time Related Charges)REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
2 Scaffoldings iii. Removal (Fixed Charges)REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
3 Cranes and lifting plant i. Establishment (Fixed Charges)REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
3 Cranes and lifting plant ii. Maintenance (Time Related Charges)REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
3 Cranes and lifting plant iii. Removal (Fixed Charges)REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
4 Plant required for specific trades i. Establishment (Fixed Charges)REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
4 Plant required for specific trades ii. Maintenance (Time Related Charges)REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
4 Plant required for specific trades iii. Removal (Fixed Charges)REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
5 Site Transport i. Establishment (Fixed Charges)REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
5 Site Transport ii. Maintenance (Time Related Charges)REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
5 Site Transport iii. Removal (Fixed Charges)REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
5 Site Transport 6 Other plant not listed above but necessary for the completion of the WorksREVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
— · GR1/7 0/11 clear0.00 Σ lines✓ 0.00 printed | ||||||
1 - Temporary fully functional site facilities i. Establishment (Fixed Charges)REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
1 - Temporary fully functional site facilities ii. Maintenance (Time Related Charges)REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
1 - Temporary fully functional site facilities iii. Removal (Fixed Charges)REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
2 - Telephones, including costs of calls i. Establishment (Fixed Charges)REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
2 - Telephones, including costs of calls ii. Maintenance (Time Related Charges)REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
2 - Telephones, including costs of calls iii. Removal (Fixed Charges)REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
2 - Telephones, including costs of calls 3 - Attendance of staff (for example, drivers, laboratory assistants)REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
4 - Equipment (for example surveying equipment, laboratory equipment) i. Establishment (Fixed Charges)REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
4 - Equipment (for example surveying equipment, laboratory equipment) ii. Maintenance (Time Related Charges)REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
4 - Equipment (for example surveying equipment, laboratory equipment) iii. Removal (Fixed Charges)REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
4 - Equipment (for example surveying equipment, laboratory equipment) 5 - Special requirements for programmes or progress chartsREVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
— · GR1/8 0/4 clear0.00 Σ lines✓ 0.00 printed | ||||||
6 Any other facilities (for example, progress photographs). i. Establishment (Fixed Charges)REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
6 Any other facilities (for example, progress photographs). ii. Maintenance (Time Related Charges)REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
6 Any other facilities (for example, progress photographs). iii. Removal (Fixed Charges)REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
Signboard Existing signboard to be taken over from Enabling Works contractor and Main Works contractor to update the names, maintain as required, remove after completion of the WorksREVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
— · GR1/9 0/12 clear0.00 Σ lines✓ 0.00 printed | ||||||
1 - Contractor's Facilities, including offices, toilets, laboratories, compounds, stores, mess rooms i. Establishment (Fixed Charges)REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
1 - Contractor's Facilities, including offices, toilets, laboratories, compounds, stores, mess rooms ii. Maintenance (Time Related Charges)REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
1 - Contractor's Facilities, including offices, toilets, laboratories, compounds, stores, mess rooms iii. Removal (Fixed Charges)REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
2 - Temporary fencing, hoardings i. Existing temporary site perimeter hoarding to be taken over from Enabling Works contractor and Main Works contractor to move / remove / adjust, maintain as requiredREVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
2 - Temporary fencing, hoardings ii. Maintenance (Time Related Charges)REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
2 - Temporary fencing, hoardings ii. Final Removal (Fixed Charges)REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
3 Screens and guardrails i. Establishment (Fixed Charges)REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
3 Screens and guardrails ii. Maintenance (Time Related Charges)REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
3 Screens and guardrails iii. Removal (Fixed Charges)REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
4 Temporary roads, hard standings and crossings i. Establishment (Fixed Charges)REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
4 Temporary roads, hard standings and crossings ii. Maintenance (Time Related Charges)REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
4 Temporary roads, hard standings and crossings iii. Removal (Fixed Charges)REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
— · GR1/10 0/9 clear0.00 Σ lines✓ 0.00 printed | ||||||
5 Water for the Works i. Establishment (Fixed Charges)REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
5 Water for the Works ii. Maintenance (Time Related Charges)REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
5 Water for the Works iii. Removal (Fixed Charges)REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
6 Lighting and power for the Works i. Establishment (Fixed Charges)REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
6 Lighting and power for the Works ii. Maintenance (Time Related Charges)REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
6 Lighting and power for the Works iii. Removal (Fixed Charges)REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
7 Temporary telephones, electronic mail and facsimile i. Establishment (Fixed Charges)REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
7 Temporary telephones, electronic mail and facsimile ii. Maintenance (Time Related Charges)REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
7 Temporary telephones, electronic mail and facsimile iii. Removal (Fixed Charges)REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
— · GR1/11 0/3 clear0.00 Σ lines✓ 0.00 printed | ||||||
A8.1 An item shall be given for temporary works including design, which shall include: 1 Traffic diversionREVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
A8.1 An item shall be given for temporary works including design, which shall include: 2 Access roadsREVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
A8.1 An item shall be given for temporary works including design, which shall include: 3 PumpingREVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
— · GR1/12 0/14 clear0.00 Σ lines✓ 0.00 printed | ||||||
A9.1 An item shall be given for temporary works, which shall include: 1 - Testing of materialsREVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
A9.1 An item shall be given for temporary works, which shall include: 2 - Testing of the WorksREVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
A9.1 An item shall be given for temporary works, which shall include: 3 - Protecting the Works from inclement weatherREVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
A9.1 An item shall be given for temporary works, which shall include: 4 - Removing rubbish, protective casings and coverings and cleaning the Works at completionREVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
A9.1 An item shall be given for temporary works, which shall include: 5 - Traffic regulationsREVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
A9.1 An item shall be given for temporary works, which shall include: 6 - Maintenance of public and private roadsREVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
A9.1 An item shall be given for temporary works, which shall include: 7 - Drying the WorksREVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
A9.1 An item shall be given for temporary works, which shall include: 8 - Control of noise and pollutionREVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
A9.1 An item shall be given for temporary works, which shall include: 9 - All Statutory obligationsREVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
A9.2 Particulars shall be given where the nature or extent of the sundry items is not at the discretion of the Contractor. 1 - Coordination with the Works by OthersREVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
A9.2 Particulars shall be given where the nature or extent of the sundry items is not at the discretion of the Contractor. 2 - Surveys, Setting-out and LevelsREVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
A9.2 Particulars shall be given where the nature or extent of the sundry items is not at the discretion of the Contractor. 3 - Dust Control, Pest Control and Lightning ProtectionREVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
A9.2 Particulars shall be given where the nature or extent of the sundry items is not at the discretion of the Contractor. 4 - Off site storageREVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
A9.2 Particulars shall be given where the nature or extent of the sundry items is not at the discretion of the Contractor. 5 - Packing, marking, storage, handling and unpackingREVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
— · GR1/13 0/18 clear0.00 Σ lines✓ 0.00 printed | ||||||
A9.2 Particulars shall be given where the nature or extent of the sundry items is not at the discretion of the Contractor. 6 - Specialist Third Party Testing, Commissioning and CertificationREVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
A9.2 Particulars shall be given where the nature or extent of the sundry items is not at the discretion of the Contractor. 7 - Shop DrawingsREVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
A9.2 Particulars shall be given where the nature or extent of the sundry items is not at the discretion of the Contractor. 8 - Submittal program, drawings and revisionsREVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
A9.2 Particulars shall be given where the nature or extent of the sundry items is not at the discretion of the Contractor. 9 - Method StatementsREVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
A9.2 Particulars shall be given where the nature or extent of the sundry items is not at the discretion of the Contractor. 10 - Operation and Maintenance ManualsREVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
A9.2 Particulars shall be given where the nature or extent of the sundry items is not at the discretion of the Contractor. 11 - Building Information Modelling (BIM) SystemREVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
A9.2 Particulars shall be given where the nature or extent of the sundry items is not at the discretion of the Contractor. 12 - Project Management System - UnifierREVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
A9.2 Particulars shall be given where the nature or extent of the sundry items is not at the discretion of the Contractor. 12 - Internet connection requirements on siteREVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
A9.2 Particulars shall be given where the nature or extent of the sundry items is not at the discretion of the Contractor. 13 - Precautions against FireREVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
A9.2 Particulars shall be given where the nature or extent of the sundry items is not at the discretion of the Contractor. 15 - Project Health, Safety, Environment and Security GuidelinesREVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
A9.2 Particulars shall be given where the nature or extent of the sundry items is not at the discretion of the Contractor. 16 - General cleaning and waste disposal during constructionREVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
A9.2 Particulars shall be given where the nature or extent of the sundry items is not at the discretion of the Contractor. 17 - Final Cleaning for Project HandoverREVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
A9.2 Particulars shall be given where the nature or extent of the sundry items is not at the discretion of the Contractor. 18 - Provision of Handover DocumentationREVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
A9.2 Particulars shall be given where the nature or extent of the sundry items is not at the discretion of the Contractor. 19 - Contract Spares/Attic stockREVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
A9.2 Particulars shall be given where the nature or extent of the sundry items is not at the discretion of the Contractor. 20 - As-built drawingsREVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
A9.2 Particulars shall be given where the nature or extent of the sundry items is not at the discretion of the Contractor. 21 - Design of the Works to the extent provided for in the ContractREVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
A9.2 Particulars shall be given where the nature or extent of the sundry items is not at the discretion of the Contractor. 22 - WarrantiesREVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
A9.2 Particulars shall be given where the nature or extent of the sundry items is not at the discretion of the Contractor. Waterproofing Warranties
*Extra over for Consequential damages to other
works due to waterproofing damages: - Warranty
for waterproofing shall be inclusive of other related works which are necessary due to the defective water proofing, such as but not limited to removal and making good of tiles, painting, plastering, joinery works etc. This shall be mentioned in the Warranty Certificate.
(Waterproofing warranty shall be covered within item S above)REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
— · GR1/14 0/2 clear0.00 Σ lines✓ 0.00 printed | ||||||
A9.2 Particulars shall be given where the nature or extent of the sundry items is not at the discretion of the Contractor. 23 - All mock-ups, prototypes and samples required by the Specification, the Drawings and the Schedule of Project RequirementsREVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
A9.2 Particulars shall be given where the nature or extent of the sundry items is not at the discretion of the Contractor. 24 - Provide for Employer's Requirements as per Appendix R of the SOPRREVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
— · GR1/15 0/1 clear0.00 Σ lines✓ 0.00 printed | ||||||
Additional Items Any items that may not be covered elsewhere in the Bills of Quantities which the Tenderer deemed to be necessary in order to carry out the works in full compliance with the SOPR must be itemised and price belowREVIEWThe source prints neither a quantity nor a rate and the Amount cell is empty — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | — | Needs review | |
2/B · 2/B/2 · BORED PILING · 2 - Main/2 0/2 clear0.00 Σ lines | ||||||
Disposal of unsuitable and surplus materials arising from excavation; including all ancillary works as necessary Removed off-site to approved location (RATE ONLY)REVIEWAmount column prints "Rate Only" — counted as 0.00 in the totals, exactly as the source's own page total does. Confirm this is intended (e.g. a RATE ONLY schedule). | — | m3 | — | —Rate Only | Needs review | |
Filling; engineered filling materials including 95% MDD compaction, shoring, chemical treatment, and all ancillary works necessary Compacted fill; various thickness; to slab on gradeREVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | m3 | — | 0.00 | Needs review | |
2/B · 2/B/3 · GENERALLY · 2 - Main/3 0/1 clear0.00 Σ lines✓ 0.00 printed | ||||||
| Allow for any other works which are not included above and which are required to complete the Site Work in accordance with the Specification and the Drawings (Tenderer to list below): REVIEW1 Item measured, but the source prints no rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | 1 | Item | — | 0.00 | Needs review | |
2/C · 2/C/1 · POURED CONCRETE · 2 - Main/4 0/1 clear0.00 Σ lines | ||||||
Reinforced concrete; concrete grade C50/60 Slab on grade; 250mm thickREVIEW0 m3 measured, but the source prints no rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | 0 | m3 | — | 0.00 | Needs review | |
2/C · 2/C/2 · POURED CONCRETE · 2 - Main/5 0/1 clear0.00 Σ lines | ||||||
Reinforced concrete; concrete grade C50/60 ColumnsREVIEW2,734 m3 measured, but the source prints no rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | 2,734 | m3 | — | 0.00 | Needs review | |
2/C · 2/C/3 · POURED CONCRETE · 2 - Main/6 0/3 clear496,200.00 Σ lines | ||||||
Reinforced concrete; concrete grade C56/70 Coupling beamsREVIEWReference sequence restarts at "A" on 2 - Main/6 without a heading change — a governing heading may have been missed above it. | 827 | m3 | 600.00 | 496,200.00 | Needs review | |
Reinforced concrete; concrete grade C56/70 Blade wall; 600mm thickREVIEW96 m3 measured, but the source prints no rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | 96 | m3 | — | 0.00 | Needs review | |
Reinforced concrete; concrete grade C70/85 Blade wall; 400mm thickREVIEW1,721 m3 measured, but the source prints no rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | 1,721 | m3 | — | 0.00 | Needs review | |
2/C · 2/C/6 · REINFORCEMENT · 2 - Main/9 0/1 clear0.00 Σ lines | ||||||
Reinforcing steel bars; high yield deformed; grade 60 Planter wallREVIEW8.88 t measured, but the source prints no rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | 8.88 | t | — | 0.00 | Needs review | |
2/C · 2/C/7 · SHUTTERING · 2 - Main/10 0/1 clear0.00 Σ lines | ||||||
Formwork system; including design, supports, formed finishes, temporary works, accessories and all ancillary works as necessary Sides of slab on gradeREVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | m2 | — | 0.00 | Needs review | |
2/C · 2/C/11 · GENERALLY · 2 - Main/14 0/1 clear0.00 Σ lines✓ 0.00 printed | ||||||
| Allow for any other works which are not included above and which are required to complete the Concrete Work in accordance with the Specification and the Drawings (Tenderer to list below): REVIEW1 Item measured, but the source prints no rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | 1 | Item | — | 0.00 | Needs review | |
2/D · 2/D/2 · SUNDRIES · 2 - Main/16 0/4 clear0.00 Σ lines✓ 0.00 printed | ||||||
| loading more… 150 of 534 lines rendered | ||||||
| Item | Description | Qty | Unit | Rate | Amount | State |
|---|---|---|---|---|---|---|
— no work-group heading — 0/115 clear0.00 Σ lines | ||||||
Generally Where any item, clause or sub-clause of the General Requirements has not been priced, it will be deemed that the value of such item, clause or sub-clause is included in the rates for measured items elsewhere in the Bills of Quantities.REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
Generally The rates and prices in these Bills of Quantities are fixed for the duration of the Contract and shall not be subject to any adjustment in respect of rise or fall in the cost of labour, materials, plant, equipment, transport or any other matters affecting the cost of execution of the Contract.REVIEWThe source prints neither a quantity nor a rate and the Amount cell is empty — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | — | Needs review | |
Generally References hereunder to the Schedule of Project Requirements (SOPR) are intended solely to direct the Contractor to the specific requirements of the Schedule of Project Requirements in respect of a particular item and do not in any way limit the scope of such item to the requirements of the Schedule of Project Requirements.REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
A1.1- Schedule of Clauses 1 As per Emaar standard CoCREVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
A1.1- Schedule of Clauses 2 Advance Payment GuaranteeREVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
A1.1- Schedule of Clauses 3 Performance BondREVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
A1.1- Schedule of Clauses 4 Contractor's All Risk PolicyREVIEWAmount column prints "By Employer" — counted as 0.00 in the totals, exactly as the source's own page total does. Confirm this is intended (e.g. a RATE ONLY schedule). | — | Item | — | —By Employer | Needs review | |
A1.1- Schedule of Clauses 5 Workmen's Compensation InsuranceREVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
A1.1- Schedule of Clauses 6 Professional Indemnity insuranceREVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
A1.1- Schedule of Clauses 7 Third Party liability insuranceREVIEWAmount column prints "By Employer" — counted as 0.00 in the totals, exactly as the source's own page total does. Confirm this is intended (e.g. a RATE ONLY schedule). | — | Item | — | —By Employer | Needs review | |
A1.1- Schedule of Clauses 8 Plant and Contractor's Equipment InsuranceREVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
A1.1- Schedule of Clauses 9 Motor Vehicle Third Party and Passenger Liability InsuranceREVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
A1.1- Schedule of Clauses The Contractor shall price hereunder any special requirements related to the specification clausesREVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
A3 - Restrictions 1 Access for and Possession or use of the SiteREVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
A3 - Restrictions 2 Limitations of working spaceREVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
A3 - Restrictions 3 Limitations of working hoursREVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
A3 - Restrictions 4 The Maintenance of existing services on, under or over the SiteREVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
A3 - Restrictions 5 The Execution of the Works in the required specific order, sections or phasesREVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
1 Office for the Contract administrators i. EstablishmentREVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
1 Office for the Contract administrators ii. MaintenanceREVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
1 Office for the Contract administrators iii. RemovalREVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
1 Office for the Contract administrators 2 SupervisionREVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
1 Office for the Contract administrators 3 SecurityREVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
1 Office for the Contract administrators 4 Safety, health and welfare of workpeopleREVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
1 Office for the Contract administrators 5 Transport of workpeopleREVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
1 Small plant and tools i. Establishment (Fixed Charges)REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
1 Small plant and tools ii. Maintenance (Time Related Charges)REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
1 Small plant and tools iii. Removal (Fixed Charges)REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
2 Scaffoldings i. Establishment (Fixed Charges)REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
2 Scaffoldings ii. Maintenance (Time Related Charges)REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
2 Scaffoldings iii. Removal (Fixed Charges)REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
3 Cranes and lifting plant i. Establishment (Fixed Charges)REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
3 Cranes and lifting plant ii. Maintenance (Time Related Charges)REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
3 Cranes and lifting plant iii. Removal (Fixed Charges)REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
4 Plant required for specific trades i. Establishment (Fixed Charges)REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
4 Plant required for specific trades ii. Maintenance (Time Related Charges)REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
4 Plant required for specific trades iii. Removal (Fixed Charges)REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
5 Site Transport i. Establishment (Fixed Charges)REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
5 Site Transport ii. Maintenance (Time Related Charges)REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
5 Site Transport iii. Removal (Fixed Charges)REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
5 Site Transport 6 Other plant not listed above but necessary for the completion of the WorksREVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
1 - Temporary fully functional site facilities i. Establishment (Fixed Charges)REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
1 - Temporary fully functional site facilities ii. Maintenance (Time Related Charges)REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
1 - Temporary fully functional site facilities iii. Removal (Fixed Charges)REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
2 - Telephones, including costs of calls i. Establishment (Fixed Charges)REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
2 - Telephones, including costs of calls ii. Maintenance (Time Related Charges)REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
2 - Telephones, including costs of calls iii. Removal (Fixed Charges)REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
2 - Telephones, including costs of calls 3 - Attendance of staff (for example, drivers, laboratory assistants)REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
4 - Equipment (for example surveying equipment, laboratory equipment) i. Establishment (Fixed Charges)REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
4 - Equipment (for example surveying equipment, laboratory equipment) ii. Maintenance (Time Related Charges)REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
4 - Equipment (for example surveying equipment, laboratory equipment) iii. Removal (Fixed Charges)REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
4 - Equipment (for example surveying equipment, laboratory equipment) 5 - Special requirements for programmes or progress chartsREVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
6 Any other facilities (for example, progress photographs). i. Establishment (Fixed Charges)REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
6 Any other facilities (for example, progress photographs). ii. Maintenance (Time Related Charges)REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
6 Any other facilities (for example, progress photographs). iii. Removal (Fixed Charges)REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
Signboard Existing signboard to be taken over from Enabling Works contractor and Main Works contractor to update the names, maintain as required, remove after completion of the WorksREVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
1 - Contractor's Facilities, including offices, toilets, laboratories, compounds, stores, mess rooms i. Establishment (Fixed Charges)REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
1 - Contractor's Facilities, including offices, toilets, laboratories, compounds, stores, mess rooms ii. Maintenance (Time Related Charges)REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
1 - Contractor's Facilities, including offices, toilets, laboratories, compounds, stores, mess rooms iii. Removal (Fixed Charges)REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
2 - Temporary fencing, hoardings i. Existing temporary site perimeter hoarding to be taken over from Enabling Works contractor and Main Works contractor to move / remove / adjust, maintain as requiredREVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
2 - Temporary fencing, hoardings ii. Maintenance (Time Related Charges)REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
2 - Temporary fencing, hoardings ii. Final Removal (Fixed Charges)REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
3 Screens and guardrails i. Establishment (Fixed Charges)REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
3 Screens and guardrails ii. Maintenance (Time Related Charges)REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
3 Screens and guardrails iii. Removal (Fixed Charges)REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
4 Temporary roads, hard standings and crossings i. Establishment (Fixed Charges)REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
4 Temporary roads, hard standings and crossings ii. Maintenance (Time Related Charges)REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
4 Temporary roads, hard standings and crossings iii. Removal (Fixed Charges)REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
5 Water for the Works i. Establishment (Fixed Charges)REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
5 Water for the Works ii. Maintenance (Time Related Charges)REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
5 Water for the Works iii. Removal (Fixed Charges)REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
6 Lighting and power for the Works i. Establishment (Fixed Charges)REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
6 Lighting and power for the Works ii. Maintenance (Time Related Charges)REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
6 Lighting and power for the Works iii. Removal (Fixed Charges)REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
7 Temporary telephones, electronic mail and facsimile i. Establishment (Fixed Charges)REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
7 Temporary telephones, electronic mail and facsimile ii. Maintenance (Time Related Charges)REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
7 Temporary telephones, electronic mail and facsimile iii. Removal (Fixed Charges)REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
A8.1 An item shall be given for temporary works including design, which shall include: 1 Traffic diversionREVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
A8.1 An item shall be given for temporary works including design, which shall include: 2 Access roadsREVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
A8.1 An item shall be given for temporary works including design, which shall include: 3 PumpingREVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
A9.1 An item shall be given for temporary works, which shall include: 1 - Testing of materialsREVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
A9.1 An item shall be given for temporary works, which shall include: 2 - Testing of the WorksREVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
A9.1 An item shall be given for temporary works, which shall include: 3 - Protecting the Works from inclement weatherREVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
A9.1 An item shall be given for temporary works, which shall include: 4 - Removing rubbish, protective casings and coverings and cleaning the Works at completionREVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
A9.1 An item shall be given for temporary works, which shall include: 5 - Traffic regulationsREVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
A9.1 An item shall be given for temporary works, which shall include: 6 - Maintenance of public and private roadsREVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
A9.1 An item shall be given for temporary works, which shall include: 7 - Drying the WorksREVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
A9.1 An item shall be given for temporary works, which shall include: 8 - Control of noise and pollutionREVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
A9.1 An item shall be given for temporary works, which shall include: 9 - All Statutory obligationsREVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
A9.2 Particulars shall be given where the nature or extent of the sundry items is not at the discretion of the Contractor. 1 - Coordination with the Works by OthersREVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
A9.2 Particulars shall be given where the nature or extent of the sundry items is not at the discretion of the Contractor. 2 - Surveys, Setting-out and LevelsREVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
A9.2 Particulars shall be given where the nature or extent of the sundry items is not at the discretion of the Contractor. 3 - Dust Control, Pest Control and Lightning ProtectionREVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
A9.2 Particulars shall be given where the nature or extent of the sundry items is not at the discretion of the Contractor. 4 - Off site storageREVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
A9.2 Particulars shall be given where the nature or extent of the sundry items is not at the discretion of the Contractor. 5 - Packing, marking, storage, handling and unpackingREVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
A9.2 Particulars shall be given where the nature or extent of the sundry items is not at the discretion of the Contractor. 6 - Specialist Third Party Testing, Commissioning and CertificationREVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
A9.2 Particulars shall be given where the nature or extent of the sundry items is not at the discretion of the Contractor. 7 - Shop DrawingsREVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
A9.2 Particulars shall be given where the nature or extent of the sundry items is not at the discretion of the Contractor. 8 - Submittal program, drawings and revisionsREVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
A9.2 Particulars shall be given where the nature or extent of the sundry items is not at the discretion of the Contractor. 9 - Method StatementsREVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
A9.2 Particulars shall be given where the nature or extent of the sundry items is not at the discretion of the Contractor. 10 - Operation and Maintenance ManualsREVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
A9.2 Particulars shall be given where the nature or extent of the sundry items is not at the discretion of the Contractor. 11 - Building Information Modelling (BIM) SystemREVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
A9.2 Particulars shall be given where the nature or extent of the sundry items is not at the discretion of the Contractor. 12 - Project Management System - UnifierREVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
A9.2 Particulars shall be given where the nature or extent of the sundry items is not at the discretion of the Contractor. 12 - Internet connection requirements on siteREVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
A9.2 Particulars shall be given where the nature or extent of the sundry items is not at the discretion of the Contractor. 13 - Precautions against FireREVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
A9.2 Particulars shall be given where the nature or extent of the sundry items is not at the discretion of the Contractor. 15 - Project Health, Safety, Environment and Security GuidelinesREVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
A9.2 Particulars shall be given where the nature or extent of the sundry items is not at the discretion of the Contractor. 16 - General cleaning and waste disposal during constructionREVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
A9.2 Particulars shall be given where the nature or extent of the sundry items is not at the discretion of the Contractor. 17 - Final Cleaning for Project HandoverREVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
A9.2 Particulars shall be given where the nature or extent of the sundry items is not at the discretion of the Contractor. 18 - Provision of Handover DocumentationREVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
A9.2 Particulars shall be given where the nature or extent of the sundry items is not at the discretion of the Contractor. 19 - Contract Spares/Attic stockREVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
A9.2 Particulars shall be given where the nature or extent of the sundry items is not at the discretion of the Contractor. 20 - As-built drawingsREVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
A9.2 Particulars shall be given where the nature or extent of the sundry items is not at the discretion of the Contractor. 21 - Design of the Works to the extent provided for in the ContractREVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
A9.2 Particulars shall be given where the nature or extent of the sundry items is not at the discretion of the Contractor. 22 - WarrantiesREVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
A9.2 Particulars shall be given where the nature or extent of the sundry items is not at the discretion of the Contractor. Waterproofing Warranties
*Extra over for Consequential damages to other
works due to waterproofing damages: - Warranty
for waterproofing shall be inclusive of other related works which are necessary due to the defective water proofing, such as but not limited to removal and making good of tiles, painting, plastering, joinery works etc. This shall be mentioned in the Warranty Certificate.
(Waterproofing warranty shall be covered within item S above)REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
A9.2 Particulars shall be given where the nature or extent of the sundry items is not at the discretion of the Contractor. 23 - All mock-ups, prototypes and samples required by the Specification, the Drawings and the Schedule of Project RequirementsREVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
A9.2 Particulars shall be given where the nature or extent of the sundry items is not at the discretion of the Contractor. 24 - Provide for Employer's Requirements as per Appendix R of the SOPRREVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
Additional Items Any items that may not be covered elsewhere in the Bills of Quantities which the Tenderer deemed to be necessary in order to carry out the works in full compliance with the SOPR must be itemised and price belowREVIEWThe source prints neither a quantity nor a rate and the Amount cell is empty — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | — | Needs review | |
EARTHWORKS 0/2 clear0.00 Σ lines | ||||||
Disposal of unsuitable and surplus materials arising from excavation; including all ancillary works as necessary Removed off-site to approved location (RATE ONLY)REVIEWAmount column prints "Rate Only" — counted as 0.00 in the totals, exactly as the source's own page total does. Confirm this is intended (e.g. a RATE ONLY schedule). | — | m3 | — | —Rate Only | Needs review | |
Filling; engineered filling materials including 95% MDD compaction, shoring, chemical treatment, and all ancillary works necessary Compacted fill; various thickness; to slab on gradeREVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | m3 | — | 0.00 | Needs review | |
GENERALLY 0/30 clear0.00 Σ lines | ||||||
| Allow for any other works which are not included above and which are required to complete the Site Work in accordance with the Specification and the Drawings (Tenderer to list below): REVIEW1 Item measured, but the source prints no rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | 1 | Item | — | 0.00 | Needs review | |
| Allow for any other works which are not included above and which are required to complete the Concrete Work in accordance with the Specification and the Drawings (Tenderer to list below): REVIEW1 Item measured, but the source prints no rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | 1 | Item | — | 0.00 | Needs review | |
| Allow for any other works which are not included above and which are required to complete the Masonry in accordance with the Specification and the Drawings (Tenderer to list below): REVIEW1 Item measured, but the source prints no rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | 1 | Item | — | 0.00 | Needs review | |
| Allow for any other works which are not included above and which are required to complete the Metalwork in accordance with the Specification and the Drawings (Tenderer to list below): REVIEW1 Item measured, but the source prints no rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | 1 | Item | — | 0.00 | Needs review | |
| Allow for any other works which are not included above and which are required to complete the Woodwork in accordance with the Specification and the Drawings (Tenderer to list below): REVIEW1 Item measured, but the source prints no rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | 1 | Item | — | 0.00 | Needs review | |
| Allow for any other works which are not included above and which are required to complete the Thermal and Moisture Protection in accordance with the Specification and the Drawings (Tenderer to list below): REVIEW1 Item measured, but the source prints no rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | 1 | Item | — | 0.00 | Needs review | |
| Allow for any other works which are not included above and which are required to complete the Doors and Windows in accordance with the Specification and the Drawings (Tenderer to list below): REVIEW1 Item measured, but the source prints no rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | 1 | Item | — | 0.00 | Needs review | |
| Allow for any other works which are not included above and which are required to complete the Finishes in accordance with the Specification and the Drawings (Tenderer to list below): REVIEW1 Item measured, but the source prints no rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | 1 | Item | — | 0.00 | Needs review | |
| Allow for any other works which are not included above and which are required to complete the Accessories in accordance with the Specification and the Drawings (Tenderer to list below): REVIEW1 Item measured, but the source prints no rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | 1 | Item | — | 0.00 | Needs review | |
| Allow for any other works which are not included above and which are required to complete the Equipment in accordance with the Specification and the Drawings (Tenderer to list below): REVIEW1 Item measured, but the source prints no rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | 1 | Item | — | 0.00 | Needs review | |
| Allow for any other works which are not included above and which are required to complete the Furnishings in accordance with the Specification and the Drawings (Tenderer to list below): REVIEW1 Item measured, but the source prints no rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | 1 | Item | — | 0.00 | Needs review | |
| Allow for any other works which are not included above and which are required to complete the Conveying Systems in accordance with the Specification and the Drawings (Tenderer to list below): REVIEW1 Item measured, but the source prints no rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | 1 | Item | — | 0.00 | Needs review | |
| Allow for any other works which are not included above and which are required to complete the Mechanical Engineering Installations in accordance with the Specification and the Drawings (Tenderer to list below): REVIEW1 Item measured, but the source prints no rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | 1 | Item | — | 0.00 | Needs review | |
| Allow for any other works which are not included above and which are required to complete the Electrical Engineering Installations in accordance with the Specification and the Drawings (Tenderer to list below): REVIEW1 Item measured, but the source prints no rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | 1 | Item | — | 0.00 | Needs review | |
| Allow for any other works which are not included above and which are required to complete the Site Works in accordance with the Specification and the Drawings (Tenderer to list below): REVIEW0 Item measured, but the source prints no rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | 0 | Item | — | 0.00 | Needs review | |
| Allow for any other works which are not included above and which are required to complete the Concrete Works in accordance with the Specification and the Drawings (Tenderer to list below): REVIEW0 Item measured, but the source prints no rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | 0 | Item | — | 0.00 | Needs review | |
| Allow for any other works which are not included above and which are required to complete the Metalwork in accordance with the Specification and the Drawings (Tenderer to list below): REVIEW0 Item measured, but the source prints no rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | 0 | Item | — | 0.00 | Needs review | |
| Allow for any other works which are not included above and which are required to complete the Thermal and Moisture Protection in accordance with the Specification and the Drawings (Tenderer to list below): REVIEW0 Item measured, but the source prints no rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | 0 | Item | — | 0.00 | Needs review | |
| Allow for any other works which are not included above and which are required to complete the Finishes in accordance with the Specification and the Drawings (Tenderer to list below): REVIEW0 Item measured, but the source prints no rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | 0 | Item | — | 0.00 | Needs review | |
| Allow for any other works which are not included above and which are required to complete the Accessories in accordance with the Specification and the Drawings (Tenderer to list below): REVIEW0 Item measured, but the source prints no rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | 0 | Item | — | 0.00 | Needs review | |
| Allow for any other works which are not included above and which are required to complete the Equipment in accordance with the Specification and the Drawings (Tenderer to list below): REVIEW0 Item measured, but the source prints no rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | 0 | Item | — | 0.00 | Needs review | |
| Allow for any other works which are not included above and which are required to complete the Furnishing in accordance with the Specification and the Drawings (Tenderer to list below): REVIEW0 Item measured, but the source prints no rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | 0 | Item | — | 0.00 | Needs review | |
| Allow for any other works which are not included above and which are required to complete the Special Construction in accordance with the Specification and the Drawings (Tenderer to list below): REVIEW0 Item measured, but the source prints no rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | 0 | Item | — | 0.00 | Needs review | |
| Allow for any other works which are not included above and which are required to complete the Mechanical Engineering Installations in accordance with the Specification and the Drawings (Tenderer to list below): REVIEW0 Item measured, but the source prints no rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | 0 | Item | — | 0.00 | Needs review | |
| Allow for any other works which are not included above and which are required to complete the Electrical Engineering Installations in accordance with the Specification and the Drawings (Tenderer to list below): REVIEW0 Item measured, but the source prints no rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | 0 | Item | — | 0.00 | Needs review | |
| Allow for any other works which are not included above and which are required to complete the furnishings in accordance with the Specification and the Drawings (Tenderer to list below) REVIEWThe source prints neither a quantity nor a rate and the Amount cell is empty — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | — | Needs review | |
| Allow for any other works which are not included above and which are required to complete the furnishings in accordance with the Specification and the Drawings (Tenderer to list below) REVIEWThe source prints neither a quantity nor a rate and the Amount cell is empty — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | — | Needs review | |
| Allow for any other works which are not included above and which are required to complete the furnishings in accordance with the Specification and the Drawings (Tenderer to list below) REVIEWThe source prints neither a quantity nor a rate and the Amount cell is empty — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | — | Needs review | |
| Allow for any other works which are not included above and which are required to complete the furnishings in accordance with the Specification and the Drawings (Tenderer to list below) REVIEWThe source prints neither a quantity nor a rate and the Amount cell is empty — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | — | Needs review | |
| Allow for any other works which are not included above and which are required to complete the furnishings in accordance with the Specification and the Drawings (Tenderer to list below) REVIEWThe source prints neither a quantity nor a rate and the Amount cell is empty — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | — | Needs review | |
| loading more… 150 of 534 lines rendered | ||||||
| Item | Description | Qty | Unit | Rate | Amount | State |
|---|---|---|---|---|---|---|
Section 2/B · SECTION B - SITE WORKS · Page 2/B/1 - 2/B/4 0/3 clear0.00 Σ lines | ||||||
Disposal of unsuitable and surplus materials arising from excavation; including all ancillary works as necessary Removed off-site to approved location (RATE ONLY)REVIEWAmount column prints "Rate Only" — counted as 0.00 in the totals, exactly as the source's own page total does. Confirm this is intended (e.g. a RATE ONLY schedule). | — | m3 | — | —Rate Only | Needs review | |
Filling; engineered filling materials including 95% MDD compaction, shoring, chemical treatment, and all ancillary works necessary Compacted fill; various thickness; to slab on gradeREVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | m3 | — | 0.00 | Needs review | |
| Allow for any other works which are not included above and which are required to complete the Site Work in accordance with the Specification and the Drawings (Tenderer to list below): REVIEW1 Item measured, but the source prints no rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | 1 | Item | — | 0.00 | Needs review | |
Section 2/C · SECTION C - CONCRETE WORKS · Page 2/C/1 - 2/C/12 0/8 clear496,200.00 Σ lines | ||||||
Reinforced concrete; concrete grade C50/60 Slab on grade; 250mm thickREVIEW0 m3 measured, but the source prints no rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | 0 | m3 | — | 0.00 | Needs review | |
Reinforced concrete; concrete grade C50/60 ColumnsREVIEW2,734 m3 measured, but the source prints no rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | 2,734 | m3 | — | 0.00 | Needs review | |
Reinforced concrete; concrete grade C56/70 Coupling beamsREVIEWReference sequence restarts at "A" on 2 - Main/6 without a heading change — a governing heading may have been missed above it. | 827 | m3 | 600.00 | 496,200.00 | Needs review | |
Reinforced concrete; concrete grade C56/70 Blade wall; 600mm thickREVIEW96 m3 measured, but the source prints no rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | 96 | m3 | — | 0.00 | Needs review | |
Reinforced concrete; concrete grade C70/85 Blade wall; 400mm thickREVIEW1,721 m3 measured, but the source prints no rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | 1,721 | m3 | — | 0.00 | Needs review | |
Reinforcing steel bars; high yield deformed; grade 60 Planter wallREVIEW8.88 t measured, but the source prints no rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | 8.88 | t | — | 0.00 | Needs review | |
Formwork system; including design, supports, formed finishes, temporary works, accessories and all ancillary works as necessary Sides of slab on gradeREVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | m2 | — | 0.00 | Needs review | |
| Allow for any other works which are not included above and which are required to complete the Concrete Work in accordance with the Specification and the Drawings (Tenderer to list below): REVIEW1 Item measured, but the source prints no rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | 1 | Item | — | 0.00 | Needs review | |
Section 2/D · SECTION D - MASONRY · Page 2/D/1 - 2/D/4 0/5 clear0.00 Σ lines | ||||||
Joints in masonry; including fire resistant compressible joint filler, sealant, angle head restraints, telescopic, sleeved and/or debonded ties and the like Dowelled control jointsREVIEWAmount column prints "Included" — counted as 0.00 in the totals, exactly as the source's own page total does. Confirm this is intended (e.g. a RATE ONLY schedule). | 1 | Item | — | —Included | Needs review | |
Joints in masonry; including fire resistant compressible joint filler, sealant, angle head restraints, telescopic, sleeved and/or debonded ties and the like Dowelled control joints (RATE ONLY)REVIEWAmount column prints "Rate Only" — counted as 0.00 in the totals, exactly as the source's own page total does. Confirm this is intended (e.g. a RATE ONLY schedule). | — | m | — | —Rate Only | Needs review | |
Joints in masonry; including fire resistant compressible joint filler, sealant, angle head restraints, telescopic, sleeved and/or debonded ties and the like Isolation jointsREVIEWAmount column prints "Included" — counted as 0.00 in the totals, exactly as the source's own page total does. Confirm this is intended (e.g. a RATE ONLY schedule). | 1 | Item | — | —Included | Needs review | |
Joints in masonry; including fire resistant compressible joint filler, sealant, angle head restraints, telescopic, sleeved and/or debonded ties and the like Isolation joints (RATE ONLY)REVIEWAmount column prints "Rate Only" — counted as 0.00 in the totals, exactly as the source's own page total does. Confirm this is intended (e.g. a RATE ONLY schedule). | — | m | — | —Rate Only | Needs review | |
| Allow for any other works which are not included above and which are required to complete the Masonry in accordance with the Specification and the Drawings (Tenderer to list below): REVIEW1 Item measured, but the source prints no rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | 1 | Item | — | 0.00 | Needs review | |
Section 2/E · SECTION E - METALWORK · Page 2/E/1 - 2/E/12 0/2 clear0.00 Σ lines | ||||||
Stainless steel ladders to water tanks; type AM-451; wall mounted stainless steel with safety cage; including finishes, frames, supports, fixings, accessories and all ancillary works as necessary Type 2; size 960 x 690 x 10300mm highREVIEW4 Nr. measured, but the source prints no rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | 4 | Nr. | — | 0.00 | Needs review | |
| Allow for any other works which are not included above and which are required to complete the Metalwork in accordance with the Specification and the Drawings (Tenderer to list below): REVIEW1 Item measured, but the source prints no rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | 1 | Item | — | 0.00 | Needs review | |
Section 2/F · SECTION F - WOOD WORK · Page 2/F/1 - 2/F/25 0/3 clear135,070.00 Σ lines2 errors | ||||||
Wardrobes; comprising 18mm thick MDF shelving and glass shutter; including MDF backing, carcass, frames, supports, front/side/back panels, doors, shelves, drawers, concealed light (measured separately), hardware, finishes, accessories and all ancillary works as necessary Type 12; size (2650+2400) x 625 x 3165mm high; L-shapedERRORNo item reference on 2 - Main/39. Every priced line carries a printed reference (A, B, C…) — either the reference was missed, or this row is not an item. | 4 | Nr. | 25,077.50 | 100,310.00 | Error | |
Wardrobes; comprising 18mm thick MDF shelving and glass shutter; including MDF backing, carcass, frames, supports, front/side/back panels, doors, shelves, drawers, concealed light (measured separately), hardware, finishes, accessories and all ancillary works as necessary Type 12; size 1750 x 625 x 3165mm highERRORNo item reference on 2 - Main/39. Every priced line carries a printed reference (A, B, C…) — either the reference was missed, or this row is not an item. | 4 | Nr. | 8,690.00 | 34,760.00 | Error | |
| Allow for any other works which are not included above and which are required to complete the Woodwork in accordance with the Specification and the Drawings (Tenderer to list below): REVIEW1 Item measured, but the source prints no rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | 1 | Item | — | 0.00 | Needs review | |
Section 2/G · SECTION G - THERMAL AND MOISTURE PROTECTION · Page 2/G/1 - 2/G/5 0/2 clear0.00 Σ lines | ||||||
Aluminium foil faced thermal insulation; including accessories and all ancillary works as necessary Type INS-101; 70mm thickREVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | m2 | — | 0.00 | Needs review | |
| Allow for any other works which are not included above and which are required to complete the Thermal and Moisture Protection in accordance with the Specification and the Drawings (Tenderer to list below): REVIEW1 Item measured, but the source prints no rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | 1 | Item | — | 0.00 | Needs review | |
Section 2/H · SECTION H - DOORS AND WINDOWS · Page 2/H/1 - 2/H/17 0/1 clear0.00 Σ lines | ||||||
| Allow for any other works which are not included above and which are required to complete the Doors and Windows in accordance with the Specification and the Drawings (Tenderer to list below): REVIEW1 Item measured, but the source prints no rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | 1 | Item | — | 0.00 | Needs review | |
Section 2/J · SECTION J - FINISHES · Page 2/J/1 - 2/J/18 0/6 clear5,468,823.00 Σ lines4 errors | ||||||
Powerfloating PowerfloatingERRORNo item reference on 2 - Main/73. Every priced line carries a printed reference (A, B, C…) — either the reference was missed, or this row is not an item. | 69,231 | m2 | 75.00 | 5,192,325.00 | Error | |
Marble; laid on cement and sand screed (measured separately); including adhesive mortar, grout, joint and edge treatment sealer, accessories and all ancillary works as necessary Type ST-108; 1200 x 600 x 20mm thickERRORNo item reference on 2 - Main/75. Every priced line carries a printed reference (A, B, C…) — either the reference was missed, or this row is not an item. | 620 | m | 200.00 | 124,000.00 | Error | |
Stone threshold; in polished granite; laid on cement and sand screed (measured separately); including adhesive mortar, grout, joint and edge treatment sealer, accessories and all ancillary works as necessary Type FLH-281; to varying widthsERRORNo item reference on 2 - Main/76. Every priced line carries a printed reference (A, B, C…) — either the reference was missed, or this row is not an item. | 494 | m | 300.00 | 148,200.00 | Error | |
Wallpaper finish; including adhesive, finishes, brackets, fixings, accessories and all ancillary works as necessary Type WF-102; fixed on cement base and plaster finish (measured separately)ERRORNo item reference on 2 - Main/80. Every priced line carries a printed reference (A, B, C…) — either the reference was missed, or this row is not an item. | 14 | m2 | 307.00 | 4,298.00 | Error | |
Monolithic gypsum board ceiling; including ceiling suspension system, shadows gaps, trims, corner protection profile, accessories and all ancillary works as necessary Extra over for access panel; size 450 x 450mmREVIEW1 Item measured, but the source prints no rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | 1 | Item | — | 0.00 | Needs review | |
| Allow for any other works which are not included above and which are required to complete the Finishes in accordance with the Specification and the Drawings (Tenderer to list below): REVIEW1 Item measured, but the source prints no rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | 1 | Item | — | 0.00 | Needs review | |
Section 2/K · SECTION K - ACCESSORIES · Page 2/K/1 - 2/K/14 0/13 clear0.00 Σ lines | ||||||
Common Areas Type SAN-711; toilet paper holderREVIEW9 Nr. measured, but the source prints no rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | 9 | Nr. | — | 0.00 | Needs review | |
Internal Signage Retail sign by othersREVIEWAmount column prints "By Others" — counted as 0.00 in the totals, exactly as the source's own page total does. Confirm this is intended (e.g. a RATE ONLY schedule). | 6 | Nr. | — | —By Others | Needs review | |
Kerbs; precast concrete fixed to floor slab; including fixings, finishes, accessories and all ancillary works as necessary Type EXH-301; 100mm highREVIEW2,969 m2 measured, but the source prints no rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | 2,969 | m2 | — | 0.00 | Needs review | |
Kerbs; precast concrete fixed to floor slab; including fixings, finishes, accessories and all ancillary works as necessary 150mm high; to rampsREVIEW609 m measured, but the source prints no rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | 609 | m | — | 0.00 | Needs review | |
Shower and toilet glass partition; fixed glass with doors; frosted glass; 10mm thick; including ironmongery, fixings, accessories and all ancillary works as necessary Extra over doors; overall size; 700mm x 2100mm highREVIEWAmount column prints "Incl." — counted as 0.00 in the totals, exactly as the source's own page total does. Confirm this is intended (e.g. a RATE ONLY schedule). | 12 | Nr. | — | —Incl. | Needs review | |
Clear Glass Type D07; shower glass partition; size 1190 x 2000mm highREVIEW2 Nr. measured, but the source prints no rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | 2 | Nr. | — | 0.00 | Needs review | |
Clear Glass Type D07; shower glass partition; size 1240 x 2000mm highREVIEW5 Nr. measured, but the source prints no rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | 5 | Nr. | — | 0.00 | Needs review | |
Clear Glass Type D07; shower glass partition; size 1460 x 2000mm highREVIEW2 Nr. measured, but the source prints no rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | 2 | Nr. | — | 0.00 | Needs review | |
Clear Glass Type D07; shower glass partition; size 1600 x 2000mm highREVIEW364 Nr. measured, but the source prints no rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | 364 | Nr. | — | 0.00 | Needs review | |
Clear Glass Type D07; shower glass partition; size 1800 x 2000mm highREVIEW377 Nr. measured, but the source prints no rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | 377 | Nr. | — | 0.00 | Needs review | |
Clear Glass Extra over doors; overall size; 700mm x 2000mm highREVIEWAmount column prints "Incl" — counted as 0.00 in the totals, exactly as the source's own page total does. Confirm this is intended (e.g. a RATE ONLY schedule). | 1,041 | Nr. | — | —Incl | Needs review | |
Fluted Tinted Glass Extra over doors; overall size; 700mm x 2000mm highREVIEWAmount column prints "Incl." — counted as 0.00 in the totals, exactly as the source's own page total does. Confirm this is intended (e.g. a RATE ONLY schedule). | 1,754 | Nr. | — | —Incl. | Needs review | |
| Allow for any other works which are not included above and which are required to complete the Accessories in accordance with the Specification and the Drawings (Tenderer to list below): REVIEW1 Item measured, but the source prints no rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | 1 | Item | — | 0.00 | Needs review | |
Section 2/L · SECTION L - EQUIPMENT · Page 2/L/1 - 2/L/7 0/41 clear0.00 Σ lines | ||||||
White goods; including accessories and all ancillary works as necessary Type WG-111; freestanding cookerREVIEW30 Nr. measured, but the source prints no rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | 30 | Nr. | — | 0.00 | Needs review | |
White goods; including accessories and all ancillary works as necessary Type WG-112; freestanding fridgeREVIEW30 Nr. measured, but the source prints no rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | 30 | Nr. | — | 0.00 | Needs review | |
White goods; including accessories and all ancillary works as necessary Type WG-113; freestanding freezerREVIEW30 Nr. measured, but the source prints no rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | 30 | Nr. | — | 0.00 | Needs review | |
White goods; including accessories and all ancillary works as necessary Type WG-114; freestanding dishwasherREVIEW30 Nr. measured, but the source prints no rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | 30 | Nr. | — | 0.00 | Needs review | |
White goods; including accessories and all ancillary works as necessary Type WG-116; coffee machineREVIEW3 Nr. measured, but the source prints no rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | 3 | Nr. | — | 0.00 | Needs review | |
White goods; including accessories and all ancillary works as necessary Type WG-117; tv screenREVIEW2 Nr. measured, but the source prints no rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | 2 | Nr. | — | 0.00 | Needs review | |
White goods; including accessories and all ancillary works as necessary Type WG-118; tv screenREVIEW5 Nr. measured, but the source prints no rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | 5 | Nr. | — | 0.00 | Needs review | |
White goods; including accessories and all ancillary works as necessary Type WG-119; water dispenserREVIEW8 Nr. measured, but the source prints no rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | 8 | Nr. | — | 0.00 | Needs review | |
White goods; including accessories and all ancillary works as necessary Type WG-120; tv screenREVIEW2 Nr. measured, but the source prints no rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | 2 | Nr. | — | 0.00 | Needs review | |
Supply and installation by Others: Contractor to allow for Co-ordination, attendance and builders work Type EQ-101; run 19" excite liveREVIEW7 Nr. measured, but the source prints no rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | 7 | Nr. | — | 0.00 | Needs review | |
Supply and installation by Others: Contractor to allow for Co-ordination, attendance and builders work Type EQ-102; climb 16" excite liveREVIEW3 Nr. measured, but the source prints no rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | 3 | Nr. | — | 0.00 | Needs review | |
Supply and installation by Others: Contractor to allow for Co-ordination, attendance and builders work Type EQ-103; synchro ar 16" excite liveREVIEW3 Nr. measured, but the source prints no rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | 3 | Nr. | — | 0.00 | Needs review | |
Supply and installation by Others: Contractor to allow for Co-ordination, attendance and builders work Type EQ-104; technogym bikeREVIEW3 Nr. measured, but the source prints no rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | 3 | Nr. | — | 0.00 | Needs review | |
Supply and installation by Others: Contractor to allow for Co-ordination, attendance and builders work Type EQ-105; skillrowREVIEW3 Nr. measured, but the source prints no rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | 3 | Nr. | — | 0.00 | Needs review | |
Supply and installation by Others: Contractor to allow for Co-ordination, attendance and builders work Type EQ-106; lower back fitness benchREVIEW2 Nr. measured, but the source prints no rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | 2 | Nr. | — | 0.00 | Needs review | |
Supply and installation by Others: Contractor to allow for Co-ordination, attendance and builders work Type EQ-107; yoga matREVIEW9 Nr. measured, but the source prints no rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | 9 | Nr. | — | 0.00 | Needs review | |
Supply and installation by Others: Contractor to allow for Co-ordination, attendance and builders work Type EQ-108; crunch bench pressREVIEW3 Nr. measured, but the source prints no rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | 3 | Nr. | — | 0.00 | Needs review | |
Supply and installation by Others: Contractor to allow for Co-ordination, attendance and builders work Type EQ-109; multi-powerREVIEW3 Nr. measured, but the source prints no rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | 3 | Nr. | — | 0.00 | Needs review | |
Supply and installation by Others: Contractor to allow for Co-ordination, attendance and builders work Type EQ-110; adjustable benchREVIEW5 Nr. measured, but the source prints no rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | 5 | Nr. | — | 0.00 | Needs review | |
Supply and installation by Others: Contractor to allow for Co-ordination, attendance and builders work Type EQ-111; two tier dumbbell rackREVIEW3 Nr. measured, but the source prints no rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | 3 | Nr. | — | 0.00 | Needs review | |
Supply and installation by Others: Contractor to allow for Co-ordination, attendance and builders work Type EQ-112; dumbbells (10 pairs)REVIEW3 Nr. measured, but the source prints no rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | 3 | Nr. | — | 0.00 | Needs review | |
Supply and installation by Others: Contractor to allow for Co-ordination, attendance and builders work Type EQ-113; dual leg curl/leg extension selection 700REVIEW3 Nr. measured, but the source prints no rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | 3 | Nr. | — | 0.00 | Needs review | |
Supply and installation by Others: Contractor to allow for Co-ordination, attendance and builders work Type EQ-114; lat machine selection 700REVIEW3 Nr. measured, but the source prints no rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | 3 | Nr. | — | 0.00 | Needs review | |
Supply and installation by Others: Contractor to allow for Co-ordination, attendance and builders work Type EQ-115; shoulder press-selection 700REVIEW3 Nr. measured, but the source prints no rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | 3 | Nr. | — | 0.00 | Needs review | |
Supply and installation by Others: Contractor to allow for Co-ordination, attendance and builders work Type EQ-116; chest press-selection 700REVIEW3 Nr. measured, but the source prints no rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | 3 | Nr. | — | 0.00 | Needs review | |
Supply and installation by Others: Contractor to allow for Co-ordination, attendance and builders work Type EQ-117; skill tools storageREVIEW3 Nr. measured, but the source prints no rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | 3 | Nr. | — | 0.00 | Needs review | |
Supply and installation by Others: Contractor to allow for Co-ordination, attendance and builders work Type EQ-118; universe wall 2 virtualREVIEW3 Nr. measured, but the source prints no rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | 3 | Nr. | — | 0.00 | Needs review | |
Supply and installation by Others: Contractor to allow for Co-ordination, attendance and builders work Type EQ-119; vario 16" excite liveREVIEW1 Nr. measured, but the source prints no rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | 1 | Nr. | — | 0.00 | Needs review | |
Supply and installation by Others: Contractor to allow for Co-ordination, attendance and builders work Type EQ-120; skill upREVIEW1 Nr. measured, but the source prints no rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | 1 | Nr. | — | 0.00 | Needs review | |
Supply and installation by Others: Contractor to allow for Co-ordination, attendance and builders work Type EQ-121; skillmillREVIEW1 Nr. measured, but the source prints no rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | 1 | Nr. | — | 0.00 | Needs review | |
Supply and installation by Others: Contractor to allow for Co-ordination, attendance and builders work Type EQ-122; skillrun unity 7000REVIEW1 Nr. measured, but the source prints no rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | 1 | Nr. | — | 0.00 | Needs review | |
Supply and installation by Others: Contractor to allow for Co-ordination, attendance and builders work Type EQ-123; plyoboxREVIEW1 Nr. measured, but the source prints no rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | 1 | Nr. | — | 0.00 | Needs review | |
Supply and installation by Others: Contractor to allow for Co-ordination, attendance and builders work Type EQ-124; punching bagREVIEW1 Nr. measured, but the source prints no rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | 1 | Nr. | — | 0.00 | Needs review | |
Supply and installation by Others: Contractor to allow for Co-ordination, attendance and builders work Type EQ-125; leg press selection 700REVIEW1 Nr. measured, but the source prints no rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | 1 | Nr. | — | 0.00 | Needs review | |
Allow to detent pin BMU restraints; including painted restraint socket, fixings, brackets, accessories and all ancillary works as necessary To tower 1REVIEWAmount column prints "Included" — counted as 0.00 in the totals, exactly as the source's own page total does. Confirm this is intended (e.g. a RATE ONLY schedule). | 1 | Item | — | —Included | Needs review | |
Allow to detent pin BMU restraints; including painted restraint socket, fixings, brackets, accessories and all ancillary works as necessary To tower 2REVIEWAmount column prints "Included" — counted as 0.00 in the totals, exactly as the source's own page total does. Confirm this is intended (e.g. a RATE ONLY schedule). | 1 | Item | — | —Included | Needs review | |
Allow to detent pin BMU restraints; including painted restraint socket, fixings, brackets, accessories and all ancillary works as necessary To tower 3REVIEWAmount column prints "Included" — counted as 0.00 in the totals, exactly as the source's own page total does. Confirm this is intended (e.g. a RATE ONLY schedule). | 1 | Item | — | —Included | Needs review | |
Allow to detent pin BMU restraints; including painted restraint socket, fixings, brackets, accessories and all ancillary works as necessary To tower 4REVIEWAmount column prints "Included" — counted as 0.00 in the totals, exactly as the source's own page total does. Confirm this is intended (e.g. a RATE ONLY schedule). | 1 | Item | — | —Included | Needs review | |
Allow to detent pin BMU restraints; including painted restraint socket, fixings, brackets, accessories and all ancillary works as necessary Allow to mobile elevated work platform (MEWP) including accessories and all ancillary works as necessaryREVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
Allow to detent pin BMU restraints; including painted restraint socket, fixings, brackets, accessories and all ancillary works as necessary Allow to panel transport trolley including accessories and all ancillary works as necessaryREVIEW1 Item measured, but the source prints no rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | 1 | Item | — | 0.00 | Needs review | |
| Allow for any other works which are not included above and which are required to complete the Equipment in accordance with the Specification and the Drawings (Tenderer to list below): REVIEW1 Item measured, but the source prints no rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | 1 | Item | — | 0.00 | Needs review | |
Section 2/M · SECTION M - FURNISHING · Page 2/M/1 - 2/M/7 0/101 clear0.00 Σ lines | ||||||
Case goods; including accessories and all ancillary works as necessary Type CG-101; coffee tableREVIEW4 Nr. measured, but the source prints no rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | 4 | Nr. | — | 0.00 | Needs review | |
Case goods; including accessories and all ancillary works as necessary Type CG-102; side tableREVIEW6 Nr. measured, but the source prints no rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | 6 | Nr. | — | 0.00 | Needs review | |
Case goods; including accessories and all ancillary works as necessary Type CG-103; side tableREVIEW4 Nr. measured, but the source prints no rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | 4 | Nr. | — | 0.00 | Needs review | |
Case goods; including accessories and all ancillary works as necessary Type CG-104; console behind sofaREVIEW4 Nr. measured, but the source prints no rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | 4 | Nr. | — | 0.00 | Needs review | |
Case goods; including accessories and all ancillary works as necessary Type CG-105; consoleREVIEW6 Nr. measured, but the source prints no rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | 6 | Nr. | — | 0.00 | Needs review | |
Case goods; including accessories and all ancillary works as necessary Type CG-106; side tableREVIEW6 Nr. measured, but the source prints no rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | 6 | Nr. | — | 0.00 | Needs review | |
Case goods; including accessories and all ancillary works as necessary Type CG-107; tableREVIEW4 Nr. measured, but the source prints no rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | 4 | Nr. | — | 0.00 | Needs review | |
Case goods; including accessories and all ancillary works as necessary Type CG-108; consoleREVIEW2 Nr. measured, but the source prints no rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | 2 | Nr. | — | 0.00 | Needs review | |
Case goods; including accessories and all ancillary works as necessary Type CG-109; coffee tableREVIEW1 Nr. measured, but the source prints no rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | 1 | Nr. | — | 0.00 | Needs review | |
Case goods; including accessories and all ancillary works as necessary Type CG-110; side table vintage bronzeREVIEW8 Nr. measured, but the source prints no rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | 8 | Nr. | — | 0.00 | Needs review | |
Case goods; including accessories and all ancillary works as necessary Type CG-111; side tableREVIEW4 Nr. measured, but the source prints no rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | 4 | Nr. | — | 0.00 | Needs review | |
Case goods; including accessories and all ancillary works as necessary Type CG-112; side tableREVIEW5 Nr. measured, but the source prints no rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | 5 | Nr. | — | 0.00 | Needs review | |
Case goods; including accessories and all ancillary works as necessary Type CG-113; communal table travertineREVIEW1 Nr. measured, but the source prints no rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | 1 | Nr. | — | 0.00 | Needs review | |
Case goods; including accessories and all ancillary works as necessary Type CG-114; coffee tableREVIEW1 Nr. measured, but the source prints no rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | 1 | Nr. | — | 0.00 | Needs review | |
Case goods; including accessories and all ancillary works as necessary Type CG-115; coffee tableREVIEW1 Nr. measured, but the source prints no rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | 1 | Nr. | — | 0.00 | Needs review | |
Case goods; including accessories and all ancillary works as necessary Type CG-116; armchairs side tableREVIEW1 Nr. measured, but the source prints no rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | 1 | Nr. | — | 0.00 | Needs review | |
Case goods; including accessories and all ancillary works as necessary Type CG-117; sofa side tableREVIEW2 Nr. measured, but the source prints no rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | 2 | Nr. | — | 0.00 | Needs review | |
Case goods; including accessories and all ancillary works as necessary Type CG-118; coffee tableREVIEW4 Nr. measured, but the source prints no rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | 4 | Nr. | — | 0.00 | Needs review | |
Case goods; including accessories and all ancillary works as necessary Type CG-119; coffee tableREVIEW8 Nr. measured, but the source prints no rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | 8 | Nr. | — | 0.00 | Needs review | |
Case goods; including accessories and all ancillary works as necessary Type CG-120; dining tableREVIEW2 Nr. measured, but the source prints no rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | 2 | Nr. | — | 0.00 | Needs review | |
Case goods; including accessories and all ancillary works as necessary Type CG-121; consoleREVIEW2 Nr. measured, but the source prints no rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | 2 | Nr. | — | 0.00 | Needs review | |
Case goods; including accessories and all ancillary works as necessary Type CG-122; gaming area side tableREVIEW12 Nr. measured, but the source prints no rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | 12 | Nr. | — | 0.00 | Needs review | |
Case goods; including accessories and all ancillary works as necessary Type CG-123; kids tableREVIEW4 Nr. measured, but the source prints no rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | 4 | Nr. | — | 0.00 | Needs review | |
Case goods; including accessories and all ancillary works as necessary Type CG-124; pool tableREVIEW1 Nr. measured, but the source prints no rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | 1 | Nr. | — | 0.00 | Needs review | |
Case goods; including accessories and all ancillary works as necessary Type CG-125; foosball tableREVIEW1 Nr. measured, but the source prints no rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | 1 | Nr. | — | 0.00 | Needs review | |
Case goods; including accessories and all ancillary works as necessary Type CG-126; shower benchREVIEW4 Nr. measured, but the source prints no rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | 4 | Nr. | — | 0.00 | Needs review | |
Loose rugs; including accessories and all ancillary works as necessary Type LR-101; seating area loose rugREVIEW4 Nr. measured, but the source prints no rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | 4 | Nr. | — | 0.00 | Needs review | |
Loose rugs; including accessories and all ancillary works as necessary Type LR-102; big table loose rugREVIEW4 Nr. measured, but the source prints no rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | 4 | Nr. | — | 0.00 | Needs review | |
Loose rugs; including accessories and all ancillary works as necessary Type LR-103; rectangular loose rugREVIEW5 Nr. measured, but the source prints no rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | 5 | Nr. | — | 0.00 | Needs review | |
Loose rugs; including accessories and all ancillary works as necessary Type LR-104; rectangular loose rugREVIEW1 Nr. measured, but the source prints no rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | 1 | Nr. | — | 0.00 | Needs review | |
Loose rugs; including accessories and all ancillary works as necessary Type LR-105; loose rugREVIEW2 Nr. measured, but the source prints no rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | 2 | Nr. | — | 0.00 | Needs review | |
Loose rugs; including accessories and all ancillary works as necessary Type LR-106; loose rugREVIEW2 Nr. measured, but the source prints no rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | 2 | Nr. | — | 0.00 | Needs review | |
Loose rugs; including accessories and all ancillary works as necessary Type LR-107; loose rugREVIEW2 Nr. measured, but the source prints no rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | 2 | Nr. | — | 0.00 | Needs review | |
Miscellaneous; including accessories and all ancillary works as necessary Type MI-101; sheer curtainsREVIEW8 Nr. measured, but the source prints no rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | 8 | Nr. | — | 0.00 | Needs review | |
Miscellaneous; including accessories and all ancillary works as necessary Type MI-102; plant potsREVIEW10 Nr. measured, but the source prints no rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | 10 | Nr. | — | 0.00 | Needs review | |
Miscellaneous; including accessories and all ancillary works as necessary Type MI-103; lift lobby entranceREVIEW4 Nr. measured, but the source prints no rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | 4 | Nr. | — | 0.00 | Needs review | |
Miscellaneous; including accessories and all ancillary works as necessary Type MI-104; artwork behind sofaREVIEW2 Nr. measured, but the source prints no rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | 2 | Nr. | — | 0.00 | Needs review | |
Miscellaneous; including accessories and all ancillary works as necessary Type MI-105; artwork above console- hand painted art paintingREVIEW4 Nr. measured, but the source prints no rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | 4 | Nr. | — | 0.00 | Needs review | |
Miscellaneous; including accessories and all ancillary works as necessary Type MI-106; artwork at table areaREVIEW2 Nr. measured, but the source prints no rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | 2 | Nr. | — | 0.00 | Needs review | |
Miscellaneous; including accessories and all ancillary works as necessary Type MI-107; artworkREVIEW4 Nr. measured, but the source prints no rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | 4 | Nr. | — | 0.00 | Needs review | |
Miscellaneous; including accessories and all ancillary works as necessary Type MI-108; entrance lobby corridor artworkREVIEW8 Nr. measured, but the source prints no rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | 8 | Nr. | — | 0.00 | Needs review | |
Miscellaneous; including accessories and all ancillary works as necessary Type MI-109; roller blindsREVIEW37 m measured, but the source prints no rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | 37 | m | — | 0.00 | Needs review | |
Miscellaneous; including accessories and all ancillary works as necessary Type MI-110; accessoriesREVIEW2 Nr. measured, but the source prints no rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | 2 | Nr. | — | 0.00 | Needs review | |
Miscellaneous; including accessories and all ancillary works as necessary Type MI-111; artworkREVIEW215 Nr. measured, but the source prints no rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | 215 | Nr. | — | 0.00 | Needs review | |
Miscellaneous; including accessories and all ancillary works as necessary Type MI-112; artworkREVIEW870 Nr. measured, but the source prints no rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | 870 | Nr. | — | 0.00 | Needs review | |
Miscellaneous; including accessories and all ancillary works as necessary Type MI-113; curtains manualREVIEW30 m measured, but the source prints no rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | 30 | m | — | 0.00 | Needs review | |
Miscellaneous; including accessories and all ancillary works as necessary Type MI-114; plant potsREVIEW6 Nr. measured, but the source prints no rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | 6 | Nr. | — | 0.00 | Needs review | |
Miscellaneous; including accessories and all ancillary works as necessary Type MI-115; sheer curtains-seating area and table area only (deleted)REVIEW4 Nr. measured, but the source prints no rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | 4 | Nr. | — | 0.00 | Needs review | |
Miscellaneous; including accessories and all ancillary works as necessary Type MI-116; plant potsREVIEW14 Nr. measured, but the source prints no rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | 14 | Nr. | — | 0.00 | Needs review | |
Miscellaneous; including accessories and all ancillary works as necessary Type MI-117; artworkREVIEW4 Nr. measured, but the source prints no rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | 4 | Nr. | — | 0.00 | Needs review | |
Miscellaneous; including accessories and all ancillary works as necessary Type MI-118; artworkREVIEW2 Nr. measured, but the source prints no rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | 2 | Nr. | — | 0.00 | Needs review | |
Miscellaneous; including accessories and all ancillary works as necessary Type MI-119; artworkREVIEW2 Nr. measured, but the source prints no rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | 2 | Nr. | — | 0.00 | Needs review | |
Miscellaneous; including accessories and all ancillary works as necessary Type MI-120; artworkREVIEW2 Nr. measured, but the source prints no rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | 2 | Nr. | — | 0.00 | Needs review | |
Miscellaneous; including accessories and all ancillary works as necessary Type MI-121; artworkREVIEW4 Nr. measured, but the source prints no rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | 4 | Nr. | — | 0.00 | Needs review | |
Miscellaneous; including accessories and all ancillary works as necessary Type MI-122; artworkREVIEW4 Nr. measured, but the source prints no rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | 4 | Nr. | — | 0.00 | Needs review | |
| loading more… 150 of 534 lines rendered | ||||||
What the bidder did with the line
Read from the source. Every line sits in exactly one of these.| State | Lines | Measured | Money | |
|---|---|---|---|---|
| PricedA rate in the source and money in the amount. | 6,942 | 7,680,890.99 | 2,169,047,863.06 | |
| UnpricedNo rate given, nothing carried into the totals. | 363 | 92,770.88 | — | |
| Prints words, not a figure“By Others”, “Included” — counted as nil, as the bidder's own page total does. | 161 | 6,735 | — | |
| Priced as a wholeMoney on the line with no rate behind it — a lump or provisional sum. | 152 | 143 | 6,866,589.58 |
Where your review stands
Your review of those same lines — a line can be in more than one.| State | Lines | Measured | Money | |
|---|---|---|---|---|
| Still openCarries a question nobody has answered yet. | 534 | 170,741.88 | 18,033,193.25 | |
| ConfirmedYou checked it; the finding stands and left the queue. | 0 | — | — | |
| RuledA recorded determination answers it — reversible at any time. | 0 | — | — | |
| Does not reconcileAn error on the line itself, not on its block. | 8 | 70,406 | 17,501,743.25 |
Collection blocks
Σ of each block’s line amounts against the total the source itself prints.| Block | Section | Lines | Σ lines | Source prints | Ties |
|---|---|---|---|---|---|
| GR1/1 | — | 3 | 0.00 | 313,190,338.58 | ✗ |
| GR1/2 | — | 9 | 0.00 | 0.00 | ✓ |
| GR1/3 | — | 1 | 0.00 | 0.00 | ✓ |
| GR1/4 | — | 5 | 0.00 | 0.00 | ✓ |
| GR1/5 | — | 7 | 0.00 | 0.00 | ✓ |
| GR1/6 | — | 16 | 0.00 | 0.00 | ✓ |
| GR1/7 | — | 11 | 0.00 | 0.00 | ✓ |
| GR1/8 | — | 4 | 0.00 | 0.00 | ✓ |
| GR1/9 | — | 12 | 0.00 | 0.00 | ✓ |
| GR1/10 | — | 9 | 0.00 | 0.00 | ✓ |
| GR1/11 | — | 3 | 0.00 | 0.00 | ✓ |
| GR1/12 | — | 14 | 0.00 | 0.00 | ✓ |
| GR1/13 | — | 18 | 0.00 | 0.00 | ✓ |
| GR1/14 | — | 2 | 0.00 | 0.00 | ✓ |
| GR1/15 | — | 1 | 0.00 | 0.00 | ✓ |
| 2 - Main/1 | SITE PREPARATION | 6 | 1,528,566.00 | 1,528,566.00 | ✓ |
| 2 - Main/2 | BORED PILING | 6 | 1,745,280.00 | 1,745,280.00 | ✓ |
| 2 - Main/3 | GENERALLY | 1 | 0.00 | 0.00 | ✓ |
| 2 - Main/4 | POURED CONCRETE | 19 | 18,015,000.00 | 18,015,000.00 | ✓ |
| 2 - Main/5 | POURED CONCRETE | 25 | 38,937,000.00 | 38,937,000.00 | ✓ |
| 2 - Main/6 | POURED CONCRETE | 23 | 48,192,600.00 | 48,192,600.00 | ✓ |
| 2 - Main/7 | POURED CONCRETE | 12 | 455,700.00 | 455,700.00 | ✓ |
| 2 - Main/8 | REINFORCEMENT | 22 | 201,742,608.00 | 201,742,608.00 | ✓ |
| 2 - Main/9 | REINFORCEMENT | 6 | 1,294,933.00 | 1,294,933.00 | ✓ |
| 2 - Main/10 | SHUTTERING | 20 | 78,131,625.00 | 78,131,625.00 | ✓ |
| 2 - Main/11 | SHUTTERING | 4 | 1,865,920.00 | 1,865,920.00 | ✓ |
| 2 - Main/12 | PRESTRESSED CONCRETE | 14 | 104,349,826.00 | 104,349,826.00 | ✓ |
| 2 - Main/13 | SUNDRIES | 6 | 2,986,640.00 | 2,986,640.00 | ✓ |
| 2 - Main/14 | GENERALLY | 1 | 0.00 | 0.00 | ✓ |
| 2 - Main/15 | WALL AND PIERS | 11 | 37,136,250.00 | 37,136,250.00 | ✓ |
| 2 - Main/16 | SUNDRIES | 4 | 0.00 | 0.00 | ✓ |
| 2 - Main/17 | GENERALLY | 1 | 0.00 | 0.00 | ✓ |
| 2 - Main/18 | STRUCTURAL METALWORK | 19 | 2,664,900.00 | 2,664,900.00 | ✓ |
| 2 - Main/19 | STRUCTURAL METALWORK | 6 | 1,736,100.00 | 1,736,100.00 | ✓ |
| 2 - Main/20 | NON-STRUCTURAL METALWORK | 5 | 97,474,280.00 | 97,474,280.00 | ✓ |
| 2 - Main/21 | NON-STRUCTURAL METALWORK | 14 | 7,698,304.88 | 7,698,304.88 | ✓ |
| 2 - Main/22 | NON-STRUCTURAL METALWORK | 16 | 55,242,074.74 | 55,242,074.74 | ✓ |
| 2 - Main/23 | NON-STRUCTURAL METALWORK | 20 | 46,637,835.48 | 46,637,835.48 | ✓ |
| 2 - Main/24 | NON-STRUCTURAL METALWORK | 15 | 53,452,110.71 | 53,452,110.71 | ✓ |
| 2 - Main/25 | NON-STRUCTURAL METALWORK | 12 | 5,762,220.00 | 5,762,220.00 | ✓ |
| 2 - Main/26 | NON-STRUCTURAL METALWORK | 13 | 486,770.00 | 486,770.00 | ✓ |
| 2 - Main/27 | NON-STRUCTURAL METALWORK | 14 | 3,994,290.00 | 3,994,290.00 | ✓ |
| 2 - Main/28 | GENERALLY | 1 | 0.00 | 0.00 | ✓ |
| 2 - Main/29 | COMPOSITE ITEMS | 12 | 3,223,025.00 | 3,223,025.00 | ✓ |
| 2 - Main/30 | COMPOSITE ITEMS | 14 | 1,725,175.00 | 1,725,175.00 | ✓ |
| 2 - Main/31 | COMPOSITE ITEMS | 15 | 737,912.50 | 737,912.50 | ✓ |
| 2 - Main/32 | COMPOSITE ITEMS | 20 | 4,045,325.00 | 4,045,325.00 | ✓ |
| 2 - Main/33 | COMPOSITE ITEMS | 17 | 1,862,337.50 | 1,862,337.50 | ✓ |
| 2 - Main/34 | COMPOSITE ITEMS | 18 | 3,770,862.50 | 3,770,862.50 | ✓ |
| 2 - Main/35 | COMPOSITE ITEMS | 18 | 2,867,356.00 | 2,867,356.00 | ✓ |
| 2 - Main/36 | COMPOSITE ITEMS | 20 | 2,058,002.00 | 2,058,002.00 | ✓ |
| 2 - Main/37 | COMPOSITE ITEMS | 17 | 21,341,525.00 | 21,341,525.00 | ✓ |
| 2 - Main/38 | COMPOSITE ITEMS | 16 | 15,432,625.00 | 15,432,625.00 | ✓ |
| 2 - Main/39 | COMPOSITE ITEMS | 11 | 1,554,945.00 | 1,554,945.00 | ✓ |
| 2 - Main/40 | COMPOSITE ITEMS | 16 | 20,338,080.00 | 20,338,080.00 | ✓ |
| 2 - Main/41 | COMPOSITE ITEMS | 21 | 28,454,535.00 | 28,454,535.00 | ✓ |
| 2 - Main/42 | COMPOSITE ITEMS | 18 | 6,959,340.00 | 6,959,340.00 | ✓ |
| 2 - Main/43 | COMPOSITE ITEMS | 19 | 1,196,970.00 | 1,196,970.00 | ✓ |
| 2 - Main/44 | COMPOSITE ITEMS | 17 | 526,808.72 | 526,808.72 | ✓ |
| 2 - Main/45 | COMPOSITE ITEMS | 13 | 1,348,175.21 | 1,348,175.21 | ✓ |
| 2 - Main/46 | COMPOSITE ITEMS | 15 | 59,190.00 | 59,190.00 | ✓ |
| 2 - Main/47 | COMPOSITE ITEMS | 12 | 217,100.00 | 217,100.00 | ✓ |
| 2 - Main/48 | COMPOSITE ITEMS | 14 | 351,001.20 | 351,001.20 | ✓ |
| 2 - Main/49 | COMPOSITE ITEMS | 9 | 1,457,360.00 | 1,457,360.00 | ✓ |
| 2 - Main/50 | COMPOSITE ITEMS | 14 | 1,526,080.00 | 1,526,080.00 | ✓ |
| 2 - Main/51 | COMPOSITE ITEMS | 13 | 762,430.00 | 762,430.00 | ✓ |
| 2 - Main/52 | GENERALLY | 1 | 0.00 | 0.00 | ✓ |
| 2 - Main/53 | COVERS AND LININGS | 9 | 16,074,270.66 | 16,074,270.66 | ✓ |
| 2 - Main/54 | DAMP-PROOF COURSES | 8 | 4,575,633.00 | 4,575,633.00 | ✓ |
| 2 - Main/55 | INSULATION | 7 | 14,121,191.93 | 14,121,191.93 | ✓ |
| 2 - Main/56 | GENERALLY | 1 | 0.00 | 0.00 | ✓ |
| 2 - Main/57 | DOORS | 13 | 34,807,871.00 | 34,807,871.00 | ✓ |
| 2 - Main/58 | DOORS | 16 | 6,467,176.00 | 6,467,176.00 | ✓ |
| 2 - Main/59 | DOORS | 16 | 9,467,420.00 | 9,467,420.00 | ✓ |
| 2 - Main/60 | DOORS | 20 | 1,765,530.00 | 1,765,530.00 | ✓ |
| 2 - Main/61 | SCREENS | 16 | 1,660,330.00 | 1,660,330.00 | ✓ |
| 2 - Main/62 | EXTERNAL DOORS | 12 | 223,330.00 | 223,330.00 | ✓ |
| 2 - Main/63 | EXTERNAL DOORS | 12 | 1,234,650.00 | 1,234,650.00 | ✓ |
| 2 - Main/64 | SCREENS | 21 | 83,332,190.00 | 83,332,190.00 | ✓ |
| 2 - Main/65 | SCREENS | 18 | 2,595,930.00 | 2,595,930.00 | ✓ |
| 2 - Main/66 | SCREENS | 18 | 12,146,200.00 | 12,146,200.00 | ✓ |
| 2 - Main/67 | SCREENS | 13 | 1,414,780.00 | 1,414,780.00 | ✓ |
| 2 - Main/68 | SCREENS | 15 | 34,480,750.00 | 34,480,750.00 | ✓ |
| 2 - Main/69 | LOUVERS | 14 | 5,531,370.00 | 5,531,370.00 | ✓ |
| 2 - Main/70 | IRONMONGERY | 21 | 1,395,312.00 | 1,395,312.00 | ✓ |
| 2 - Main/71 | IRONMONGERY | 14 | 195,800.00 | 195,800.00 | ✓ |
| 2 - Main/72 | GENERALLY | 1 | 0.00 | 0.00 | ✓ |
| 2 - Main/73 | BACKGROUNDS | 18 | 37,474,583.23 | 37,474,583.23 | ✓ |
| 2 - Main/74 | BACKGROUNDS | 9 | 3,658,864.82 | 3,658,864.82 | ✓ |
| 2 - Main/75 | FLOOR FINISHES | 15 | 131,853,537.53 | 131,853,537.53 | ✓ |
| 2 - Main/76 | FLOOR FINISHES | 15 | 2,895,974.50 | 2,895,974.50 | ✓ |
| 2 - Main/77 | FLOOR FINISHES | 9 | 1,057,887.00 | 1,057,887.00 | ✓ |
| 2 - Main/78 | FLOOR FINISHES | 9 | 16,486,093.08 | 16,486,093.08 | ✓ |
| 2 - Main/79 | WALL FINISHES | 14 | 19,878,765.68 | 19,878,765.68 | ✓ |
| 2 - Main/80 | WALL FINISHES | 14 | 15,269,702.06 | 15,269,702.06 | ✓ |
| 2 - Main/81 | CEILING FINISHES | 10 | 1,904,158.61 | 1,904,158.61 | ✓ |
| 2 - Main/82 | SUNDRIES | 10 | 1,706,965.00 | 1,706,965.00 | ✓ |
| 2 - Main/83 | SUSPENDED CEILING | 16 | 10,253,430.62 | 10,253,430.62 | ✓ |
| 2 - Main/84 | SUSPENDED CEILING | 16 | 5,380,804.40 | 5,380,804.40 | ✓ |
| 2 - Main/85 | SUSPENDED CEILING | 18 | 2,317,366.10 | 2,317,366.10 | ✓ |
| 2 - Main/86 | DECORATIONS | 13 | 21,128,077.02 | 21,128,077.02 | ✓ |
| 2 - Main/87 | DECORATIONS | 18 | 15,921,959.85 | 15,921,959.85 | ✓ |
| 2 - Main/88 | SIGNWRITING | 16 | 1,694,510.00 | 1,694,510.00 | ✓ |
| 2 - Main/89 | GENERALLY | 1 | 0.00 | 0.00 | ✓ |
| 2 - Main/90 | TOILET ACCESSORIES | 20 | 116,340.14 | 116,340.14 | ✓ |
| 2 - Main/91 | TOILET ACCESSORIES | 21 | 3,593,625.04 | 3,593,625.04 | ✓ |
| 2 - Main/92 | KIDS PLAY AREA | 14 | 1,006,438.04 | 1,006,438.04 | ✓ |
| 2 - Main/93 | SIGNAGE AND WAYFINDING | 20 | 1,971,170.00 | 1,971,170.00 | ✓ |
| 2 - Main/94 | SIGNAGE AND WAYFINDING | 22 | 2,274,534.50 | 2,274,534.50 | ✓ |
| 2 - Main/95 | PARKING ACCESSORIES | 14 | 1,144,474.03 | 1,144,474.03 | ✓ |
| 2 - Main/96 | PARKING ACCESSORIES | 4 | 621,910.00 | 621,910.00 | ✓ |
| 2 - Main/97 | PARTITIONS | 15 | 19,434,546.95 | 19,434,546.95 | ✓ |
| 2 - Main/98 | PARTITIONS | 12 | 6,064,629.98 | 6,064,629.98 | ✓ |
| 2 - Main/99 | TOILET PARTITION | 20 | 2,825,712.50 | 2,825,712.50 | ✓ |
| 2 - Main/100 | TOILET PARTITION | 16 | 5,972,835.00 | 5,972,835.00 | ✓ |
| 2 - Main/101 | WASTE CHUTES | 10 | 2,562,420.00 | 2,562,420.00 | ✓ |
| 2 - Main/102 | GENERALLY | 1 | 0.00 | 0.00 | ✓ |
| 2 - Main/103 | WHITE GOODS | 18 | 24,242,209.13 | 24,242,209.13 | ✓ |
| 2 - Main/104 | GYM EQUIPMENT | 25 | 0.00 | 0.00 | ✓ |
| 2 - Main/105 | BUILDING MANAGEMENT UNIT (BMU) | 3 | 10,366,000.00 | 10,366,000.00 | ✓ |
| 2 - Main/106 | BUILDING MANAGEMENT UNIT (BMU) | 8 | 1,671,800.00 | 1,671,800.00 | ✓ |
| 2 - Main/107 | BUILDING MANAGEMENT UNIT (BMU) | 8 | 125,000.00 | 125,000.00 | ✓ |
| 2 - Main/108 | GENERALLY | 1 | 0.00 | 0.00 | ✓ |
| 2 - Main/109 | LOOSE FF&E | 22 | 0.00 | 0.00 | ✓ |
| 2 - Main/110 | LOOSE FF&E | 21 | 0.00 | 0.00 | ✓ |
| 2 - Main/111 | LOOSE FF&E | 24 | 0.00 | 0.00 | ✓ |
| 2 - Main/112 | LOOSE FF&E | 20 | 0.00 | 0.00 | ✓ |
| 2 - Main/113 | LOOSE FF&E | 15 | 324,125.00 | 324,125.00 | ✓ |
| 2 - Main/114 | GENERALLY | 1 | 0.00 | 0.00 | ✓ |
| 2 - Main/115 | LIFTS | 8 | 425,624.00 | 425,624.00 | ✓ |
| 2 - Main/116 | LIFTS | 8 | 22,441,600.00 | 22,441,600.00 | ✓ |
| 2 - Main/117 | LIFTS | 6 | 25,900,000.00 | 25,900,000.00 | ✓ |
| 2 - Main/118 | LIFTS | 2 | 3,700,000.00 | 3,700,000.00 | ✓ |
| 2 - Main/119 | SUNDRIES | 4 | 0.00 | 0.00 | ✓ |
| 2 - Main/120 | BWIC | 6 | 0.00 | 0.00 | ✓ |
| 2 - Main/121 | GENERALLY | 1 | 0.00 | 0.00 | ✓ |
| 2 - Main/122 | SANITARY FIXTURES & FITTINGS | 16 | 1,884,867.45 | 1,884,867.45 | ✓ |
| 2 - Main/123 | SANITARY FIXTURES & FITTINGS | 16 | 9,367,476.55 | 9,367,476.55 | ✓ |
| 2 - Main/124 | SANITARY FIXTURES & FITTINGS | 15 | 2,048,385.65 | 2,048,385.65 | ✓ |
| 2 - Main/125 | SANITARY FIXTURES & FITTINGS | 12 | 1,884,711.23 | 1,884,711.23 | ✓ |
| 2 - Main/126 | SANITARY FIXTURES & FITTINGS | 8 | 0.00 | 0.00 | ✓ |
| 2 - Main/127 | DRAINAGE INSTALLATION | 18 | 9,485,313.80 | 9,485,313.80 | ✓ |
| 2 - Main/128 | DRAINAGE INSTALLATION | 16 | 2,260,215.40 | 2,260,215.40 | ✓ |
| 2 - Main/129 | DRAINAGE INSTALLATION | 9 | 1,416,861.00 | 1,416,861.00 | ✓ |
| 2 - Main/130 | DRAINAGE INSTALLATION | 18 | 1,319,696.00 | 1,319,696.00 | ✓ |
| 2 - Main/131 | DRAINAGE INSTALLATION | 15 | 17,135,700.00 | 17,135,700.00 | ✓ |
| 2 - Main/132 | DRAINAGE INSTALLATION | 17 | 4,801,993.00 | 4,801,993.00 | ✓ |
| 2 - Main/133 | DRAINAGE INSTALLATION | 15 | 1,214,678.00 | 1,214,678.00 | ✓ |
| 2 - Main/134 | DRAINAGE INSTALLATION | 10 | 43,470.00 | 43,470.00 | ✓ |
| 2 - Main/135 | DRAINAGE INSTALLATION | 10 | 45,500.00 | 45,500.00 | ✓ |
| 2 - Main/136 | DRAINAGE INSTALLATION | 11 | 144,000.00 | 144,000.00 | ✓ |
| 2 - Main/137 | DRAINAGE INSTALLATION | 2 | 26,000.00 | 26,000.00 | ✓ |
| 2 - Main/138 | WATER INSTALLATION | 19 | 10,734,885.00 | 10,734,885.00 | ✓ |
| 2 - Main/139 | WATER INSTALLATION | 15 | 2,052,310.00 | 2,052,310.00 | ✓ |
| 2 - Main/140 | WATER INSTALLATION | 12 | 2,298,635.00 | 2,298,635.00 | ✓ |
| 2 - Main/141 | WATER INSTALLATION | 18 | 641,325.00 | 641,325.00 | ✓ |
| 2 - Main/142 | WATER INSTALLATION | 16 | 172,985.00 | 172,985.00 | ✓ |
| 2 - Main/143 | WATER INSTALLATION | 15 | 2,870,070.00 | 2,870,070.00 | ✓ |
| 2 - Main/144 | WATER INSTALLATION | 9 | 2,673,050.00 | 2,673,050.00 | ✓ |
| 2 - Main/145 | WATER INSTALLATION | 8 | 579,000.00 | 579,000.00 | ✓ |
| 2 - Main/146 | WATER INSTALLATION | 8 | 139,200.00 | 139,200.00 | ✓ |
| 2 - Main/147 | WATER INSTALLATION | 5 | 25,000.00 | 25,000.00 | ✓ |
| 2 - Main/148 | FIRE PROTECTION SYSTEM | 5 | 9,159,495.00 | 9,159,495.00 | ✓ |
| 2 - Main/149 | FIRE PROTECTION SYSTEM | 17 | 14,462,195.00 | 14,462,195.00 | ✓ |
| 2 - Main/150 | FIRE PROTECTION SYSTEM | 21 | 4,758,180.00 | 4,758,180.00 | ✓ |
| 2 - Main/151 | FIRE PROTECTION SYSTEM | 11 | 2,037,230.00 | 2,037,230.00 | ✓ |
| 2 - Main/152 | FIRE PROTECTION SYSTEM | 7 | 6,716,400.00 | 6,716,400.00 | ✓ |
| 2 - Main/153 | FIRE PROTECTION SYSTEM | 10 | 1,718,000.00 | 1,718,000.00 | ✓ |
| 2 - Main/154 | FIRE PROTECTION SYSTEM | 9 | 663,400.00 | 663,400.00 | ✓ |
| 2 - Main/155 | FIRE PROTECTION SYSTEM | 10 | 2,964,600.00 | 2,964,600.00 | ✓ |
| 2 - Main/156 | FIRE PROTECTION SYSTEM | 5 | 131,000.00 | 131,000.00 | ✓ |
| 2 - Main/157 | HVAC INSTALLATION | 16 | 18,712,210.00 | 18,712,210.00 | ✓ |
| 2 - Main/158 | HVAC INSTALLATION | 16 | 3,561,309.00 | 3,561,309.00 | ✓ |
| 2 - Main/159 | HVAC INSTALLATION | 18 | 1,277,319.80 | 1,277,319.80 | ✓ |
| 2 - Main/160 | HVAC INSTALLATION | 13 | 8,433,075.00 | 8,433,075.00 | ✓ |
| 2 - Main/161 | HVAC INSTALLATION | 7 | 1,974,355.00 | 1,974,355.00 | ✓ |
| 2 - Main/162 | HVAC INSTALLATION | 7 | 3,227,448.00 | 3,227,448.00 | ✓ |
| 2 - Main/163 | HVAC INSTALLATION | 13 | 396,000.00 | 396,000.00 | ✓ |
| 2 - Main/164 | HVAC INSTALLATION | 9 | 12,179,485.00 | 12,179,485.00 | ✓ |
| 2 - Main/165 | HVAC INSTALLATION | 22 | 101,310.00 | 101,310.00 | ✓ |
| 2 - Main/166 | HVAC INSTALLATION | 21 | 134,775.00 | 134,775.00 | ✓ |
| 2 - Main/167 | HVAC INSTALLATION | 21 | 597,816.00 | 597,816.00 | ✓ |
| 2 - Main/168 | HVAC INSTALLATION | 22 | 280,686.00 | 280,686.00 | ✓ |
| 2 - Main/169 | HVAC INSTALLATION | 17 | 119,010.00 | 119,010.00 | ✓ |
| 2 - Main/170 | HVAC INSTALLATION | 21 | 472,370.00 | 472,370.00 | ✓ |
| 2 - Main/171 | HVAC INSTALLATION | 22 | 59,350.00 | 59,350.00 | ✓ |
| 2 - Main/172 | HVAC INSTALLATION | 20 | 167,595.00 | 167,595.00 | ✓ |
| 2 - Main/173 | HVAC INSTALLATION | 22 | 456,850.00 | 456,850.00 | ✓ |
| 2 - Main/174 | HVAC INSTALLATION | 22 | 44,230.00 | 44,230.00 | ✓ |
| 2 - Main/175 | HVAC INSTALLATION | 15 | 678,630.00 | 678,630.00 | ✓ |
| 2 - Main/176 | HVAC INSTALLATION | 21 | 761,850.00 | 761,850.00 | ✓ |
| 2 - Main/177 | HVAC INSTALLATION | 20 | 704,990.00 | 704,990.00 | ✓ |
| 2 - Main/178 | HVAC INSTALLATION | 14 | 535,065.00 | 535,065.00 | ✓ |
| 2 - Main/179 | HVAC INSTALLATION | 14 | 86,920.00 | 86,920.00 | ✓ |
| 2 - Main/180 | HVAC INSTALLATION | 14 | 102,220.00 | 102,220.00 | ✓ |
| 2 - Main/181 | HVAC INSTALLATION | 14 | 66,940.00 | 66,940.00 | ✓ |
| 2 - Main/182 | HVAC INSTALLATION | 14 | 76,830.00 | 76,830.00 | ✓ |
| 2 - Main/183 | HVAC INSTALLATION | 14 | 72,090.00 | 72,090.00 | ✓ |
| 2 - Main/184 | HVAC INSTALLATION | 14 | 672,170.00 | 672,170.00 | ✓ |
| 2 - Main/185 | HVAC INSTALLATION | 14 | 1,440,480.00 | 1,440,480.00 | ✓ |
| 2 - Main/186 | HVAC INSTALLATION | 14 | 361,400.00 | 361,400.00 | ✓ |
| 2 - Main/187 | HVAC INSTALLATION | 14 | 67,150.00 | 67,150.00 | ✓ |
| 2 - Main/188 | HVAC INSTALLATION | 14 | 62,640.00 | 62,640.00 | ✓ |
| 2 - Main/189 | HVAC INSTALLATION | 14 | 63,750.00 | 63,750.00 | ✓ |
| 2 - Main/190 | HVAC INSTALLATION | 14 | 825,630.00 | 825,630.00 | ✓ |
| 2 - Main/191 | HVAC INSTALLATION | 14 | 980,600.00 | 980,600.00 | ✓ |
| 2 - Main/192 | HVAC INSTALLATION | 14 | 65,740.00 | 65,740.00 | ✓ |
| 2 - Main/193 | HVAC INSTALLATION | 14 | 250,900.00 | 250,900.00 | ✓ |
| 2 - Main/194 | HVAC INSTALLATION | 14 | 200,200.00 | 200,200.00 | ✓ |
| 2 - Main/195 | HVAC INSTALLATION | 14 | 86,540.00 | 86,540.00 | ✓ |
| 2 - Main/196 | HVAC INSTALLATION | 14 | 154,890.00 | 154,890.00 | ✓ |
| 2 - Main/197 | HVAC INSTALLATION | 14 | 63,200.00 | 63,200.00 | ✓ |
| 2 - Main/198 | HVAC INSTALLATION | 14 | 74,390.00 | 74,390.00 | ✓ |
| 2 - Main/199 | HVAC INSTALLATION | 14 | 86,140.00 | 86,140.00 | ✓ |
| 2 - Main/200 | HVAC INSTALLATION | 14 | 89,970.00 | 89,970.00 | ✓ |
| 2 - Main/201 | HVAC INSTALLATION | 14 | 1,306,480.00 | 1,306,480.00 | ✓ |
| 2 - Main/202 | HVAC INSTALLATION | 14 | 1,280,720.00 | 1,280,720.00 | ✓ |
| 2 - Main/203 | HVAC INSTALLATION | 14 | 62,870.00 | 62,870.00 | ✓ |
| 2 - Main/204 | HVAC INSTALLATION | 14 | 62,870.00 | 62,870.00 | ✓ |
| 2 - Main/205 | HVAC INSTALLATION | 14 | 68,590.00 | 68,590.00 | ✓ |
| 2 - Main/206 | HVAC INSTALLATION | 14 | 71,830.00 | 71,830.00 | ✓ |
| 2 - Main/207 | HVAC INSTALLATION | 14 | 960,320.00 | 960,320.00 | ✓ |
| 2 - Main/208 | HVAC INSTALLATION | 14 | 632,170.00 | 632,170.00 | ✓ |
| 2 - Main/209 | HVAC INSTALLATION | 14 | 62,550.00 | 62,550.00 | ✓ |
| 2 - Main/210 | HVAC INSTALLATION | 14 | 57,260.00 | 57,260.00 | ✓ |
| 2 - Main/211 | HVAC INSTALLATION | 14 | 77,080.00 | 77,080.00 | ✓ |
| 2 - Main/212 | HVAC INSTALLATION | 14 | 79,470.00 | 79,470.00 | ✓ |
| 2 - Main/213 | HVAC INSTALLATION | 14 | 67,580.00 | 67,580.00 | ✓ |
| 2 - Main/214 | HVAC INSTALLATION | 14 | 61,880.00 | 61,880.00 | ✓ |
| 2 - Main/215 | HVAC INSTALLATION | 14 | 70,990.00 | 70,990.00 | ✓ |
| 2 - Main/216 | HVAC INSTALLATION | 14 | 70,030.00 | 70,030.00 | ✓ |
| 2 - Main/217 | HVAC INSTALLATION | 14 | 79,230.00 | 79,230.00 | ✓ |
| 2 - Main/218 | HVAC INSTALLATION | 14 | 77,260.00 | 77,260.00 | ✓ |
| 2 - Main/219 | HVAC INSTALLATION | 14 | 86,060.00 | 86,060.00 | ✓ |
| 2 - Main/220 | HVAC INSTALLATION | 14 | 93,220.00 | 93,220.00 | ✓ |
| 2 - Main/221 | HVAC INSTALLATION | 14 | 421,340.00 | 421,340.00 | ✓ |
| 2 - Main/222 | HVAC INSTALLATION | 14 | 87,690.00 | 87,690.00 | ✓ |
| 2 - Main/223 | HVAC INSTALLATION | 14 | 62,870.00 | 62,870.00 | ✓ |
| 2 - Main/224 | HVAC INSTALLATION | 14 | 67,250.00 | 67,250.00 | ✓ |
| 2 - Main/225 | HVAC INSTALLATION | 14 | 91,200.00 | 91,200.00 | ✓ |
| 2 - Main/226 | HVAC INSTALLATION | 14 | 64,400.00 | 64,400.00 | ✓ |
| 2 - Main/227 | HVAC INSTALLATION | 14 | 1,283,160.00 | 1,283,160.00 | ✓ |
| 2 - Main/228 | HVAC INSTALLATION | 14 | 1,082,840.00 | 1,082,840.00 | ✓ |
| 2 - Main/229 | HVAC INSTALLATION | 14 | 63,650.00 | 63,650.00 | ✓ |
| 2 - Main/230 | HVAC INSTALLATION | 14 | 56,710.00 | 56,710.00 | ✓ |
| 2 - Main/231 | HVAC INSTALLATION | 14 | 64,080.00 | 64,080.00 | ✓ |
| 2 - Main/232 | HVAC INSTALLATION | 14 | 54,320.00 | 54,320.00 | ✓ |
| 2 - Main/233 | HVAC INSTALLATION | 14 | 1,021,950.00 | 1,021,950.00 | ✓ |
| 2 - Main/234 | HVAC INSTALLATION | 14 | 1,458,670.00 | 1,458,670.00 | ✓ |
| 2 - Main/235 | HVAC INSTALLATION | 14 | 111,060.00 | 111,060.00 | ✓ |
| 2 - Main/236 | HVAC INSTALLATION | 14 | 57,260.00 | 57,260.00 | ✓ |
| 2 - Main/237 | HVAC INSTALLATION | 14 | 69,470.00 | 69,470.00 | ✓ |
| 2 - Main/238 | HVAC INSTALLATION | 14 | 66,140.00 | 66,140.00 | ✓ |
| 2 - Main/239 | HVAC INSTALLATION | 14 | 104,370.00 | 104,370.00 | ✓ |
| 2 - Main/240 | HVAC INSTALLATION | 14 | 70,780.00 | 70,780.00 | ✓ |
| 2 - Main/241 | HVAC INSTALLATION | 14 | 79,130.00 | 79,130.00 | ✓ |
| 2 - Main/242 | HVAC INSTALLATION | 14 | 76,050.00 | 76,050.00 | ✓ |
| 2 - Main/243 | HVAC INSTALLATION | 14 | 82,150.00 | 82,150.00 | ✓ |
| 2 - Main/244 | HVAC INSTALLATION | 14 | 69,360.00 | 69,360.00 | ✓ |
| 2 - Main/245 | HVAC INSTALLATION | 14 | 658,670.00 | 658,670.00 | ✓ |
| 2 - Main/246 | HVAC INSTALLATION | 14 | 1,543,200.00 | 1,543,200.00 | ✓ |
| 2 - Main/247 | HVAC INSTALLATION | 14 | 453,590.00 | 453,590.00 | ✓ |
| 2 - Main/248 | HVAC INSTALLATION | 14 | 329,180.00 | 329,180.00 | ✓ |
| 2 - Main/249 | HVAC INSTALLATION | 14 | 51,460.00 | 51,460.00 | ✓ |
| 2 - Main/250 | HVAC INSTALLATION | 14 | 73,970.00 | 73,970.00 | ✓ |
| 2 - Main/251 | HVAC INSTALLATION | 14 | 429,810.00 | 429,810.00 | ✓ |
| 2 - Main/252 | HVAC INSTALLATION | 14 | 917,920.00 | 917,920.00 | ✓ |
| 2 - Main/253 | HVAC INSTALLATION | 14 | 176,450.00 | 176,450.00 | ✓ |
| 2 - Main/254 | HVAC INSTALLATION | 14 | 57,040.00 | 57,040.00 | ✓ |
| 2 - Main/255 | HVAC INSTALLATION | 14 | 78,030.00 | 78,030.00 | ✓ |
| 2 - Main/256 | HVAC INSTALLATION | 14 | 68,450.00 | 68,450.00 | ✓ |
| 2 - Main/257 | HVAC INSTALLATION | 14 | 75,190.00 | 75,190.00 | ✓ |
| 2 - Main/258 | HVAC INSTALLATION | 14 | 82,410.00 | 82,410.00 | ✓ |
| 2 - Main/259 | HVAC INSTALLATION | 14 | 76,740.00 | 76,740.00 | ✓ |
| 2 - Main/260 | HVAC INSTALLATION | 11 | 1,295,430.00 | 1,295,430.00 | ✓ |
| 2 - Main/261 | HVAC INSTALLATION | 12 | 11,237,970.00 | 11,237,970.00 | ✓ |
| 2 - Main/262 | HVAC INSTALLATION | 18 | 190,965.00 | 190,965.00 | ✓ |
| 2 - Main/263 | HVAC INSTALLATION | 22 | 29,640.00 | 29,640.00 | ✓ |
| 2 - Main/264 | HVAC INSTALLATION | 22 | 32,430.00 | 32,430.00 | ✓ |
| 2 - Main/265 | HVAC INSTALLATION | 22 | 25,455.00 | 25,455.00 | ✓ |
| 2 - Main/266 | HVAC INSTALLATION | 21 | 113,526.00 | 113,526.00 | ✓ |
| 2 - Main/267 | HVAC INSTALLATION | 22 | 27,538.00 | 27,538.00 | ✓ |
| 2 - Main/268 | HVAC INSTALLATION | 22 | 25,074.00 | 25,074.00 | ✓ |
| 2 - Main/269 | HVAC INSTALLATION | 22 | 26,376.00 | 26,376.00 | ✓ |
| 2 - Main/270 | HVAC INSTALLATION | 20 | 19,482.00 | 19,482.00 | ✓ |
| 2 - Main/271 | HVAC INSTALLATION | 17 | 108,090.00 | 108,090.00 | ✓ |
| 2 - Main/272 | HVAC INSTALLATION | 20 | 48,612.00 | 48,612.00 | ✓ |
| 2 - Main/273 | HVAC INSTALLATION | 18 | 5,595.00 | 5,595.00 | ✓ |
| 2 - Main/274 | HVAC INSTALLATION | 5 | 14,000.00 | 14,000.00 | ✓ |
| 2 - Main/275 | HVAC INSTALLATION | 8 | 40,000.00 | 40,000.00 | ✓ |
| 2 - Main/276 | HVAC INSTALLATION | 15 | 12,799,020.00 | 12,799,020.00 | ✓ |
| 2 - Main/277 | HVAC INSTALLATION | 20 | 478,450.00 | 478,450.00 | ✓ |
| 2 - Main/278 | HVAC INSTALLATION | 21 | 108,122.00 | 108,122.00 | ✓ |
| 2 - Main/279 | HVAC INSTALLATION | 22 | 131,642.00 | 131,642.00 | ✓ |
| 2 - Main/280 | HVAC INSTALLATION | 20 | 147,756.00 | 147,756.00 | ✓ |
| 2 - Main/281 | HVAC INSTALLATION | 14 | 502,480.00 | 502,480.00 | ✓ |
| 2 - Main/282 | HVAC INSTALLATION | 17 | 136,816.00 | 136,816.00 | ✓ |
| 2 - Main/283 | HVAC INSTALLATION | 12 | 758,870.00 | 758,870.00 | ✓ |
| 2 - Main/284 | HVAC INSTALLATION | 13 | 1,259,500.00 | 1,259,500.00 | ✓ |
| 2 - Main/285 | HVAC INSTALLATION | 13 | 1,288,000.00 | 1,288,000.00 | ✓ |
| 2 - Main/286 | HVAC INSTALLATION | 11 | 291,000.00 | 291,000.00 | ✓ |
| 2 - Main/287 | HVAC INSTALLATION | 13 | 207,000.00 | 207,000.00 | ✓ |
| 2 - Main/288 | HVAC INSTALLATION | 14 | 490,000.00 | 490,000.00 | ✓ |
| 2 - Main/289 | HVAC INSTALLATION | 12 | 315,000.00 | 315,000.00 | ✓ |
| 2 - Main/290 | HVAC INSTALLATION | 7 | 140,000.00 | 140,000.00 | ✓ |
| 2 - Main/291 | LPG INSTALLATION | 1 | 1,093,200.00 | 1,093,200.00 | ✓ |
| 2 - Main/292 | LPG INSTALLATION | 10 | 1,623,181.00 | 1,623,181.00 | ✓ |
| 2 - Main/293 | LPG INSTALLATION | 14 | 7,172,328.00 | 7,172,328.00 | ✓ |
| 2 - Main/294 | LPG INSTALLATION | 5 | 25,000.00 | 25,000.00 | ✓ |
| 2 - Main/295 | SUNDRIES | 9 | 11,139,546.20 | 11,139,546.20 | ✓ |
| 2 - Main/296 | SUNDRIES | 1 | 0.00 | 0.00 | ✓ |
| 2 - Main/297 | WORK INCIDENTAL AND BWIC | 9 | 0.00 | 0.00 | ✓ |
| 2 - Main/298 | WORK INCIDENTAL AND BWIC | 3 | 0.00 | 0.00 | ✓ |
| 2 - Main/299 | GENERALLY | 1 | 0.00 | 0.00 | ✓ |
| 2 - Main/300 | POWER INSTALLATION | 10 | 61,086.00 | 61,086.00 | ✓ |
| 2 - Main/301 | POWER INSTALLATION | 16 | 114,880.00 | 114,880.00 | ✓ |
| 2 - Main/302 | POWER INSTALLATION | 20 | 139,000.00 | 139,000.00 | ✓ |
| 2 - Main/303 | POWER INSTALLATION | 15 | 417,925.00 | 417,925.00 | ✓ |
| 2 - Main/304 | POWER INSTALLATION | 18 | 661,745.00 | 661,745.00 | ✓ |
| 2 - Main/305 | POWER INSTALLATION | 16 | 182,540.00 | 182,540.00 | ✓ |
| 2 - Main/306 | POWER INSTALLATION | 16 | 269,820.00 | 269,820.00 | ✓ |
| 2 - Main/307 | POWER INSTALLATION | 13 | 675,020.00 | 675,020.00 | ✓ |
| 2 - Main/308 | POWER INSTALLATION | 11 | 404,256.00 | 404,256.00 | ✓ |
| 2 - Main/309 | POWER INSTALLATION | 14 | 15,104.00 | 15,104.00 | ✓ |
| 2 - Main/310 | POWER INSTALLATION | 12 | 35,122.00 | 35,122.00 | ✓ |
| 2 - Main/311 | POWER INSTALLATION | 19 | 99,420.00 | 99,420.00 | ✓ |
| 2 - Main/312 | POWER INSTALLATION | 21 | 110,600.00 | 110,600.00 | ✓ |
| 2 - Main/313 | POWER INSTALLATION | 22 | 73,360.00 | 73,360.00 | ✓ |
| 2 - Main/314 | POWER INSTALLATION | 22 | 92,880.00 | 92,880.00 | ✓ |
| 2 - Main/315 | POWER INSTALLATION | 24 | 61,280.00 | 61,280.00 | ✓ |
| 2 - Main/316 | POWER INSTALLATION | 21 | 119,760.00 | 119,760.00 | ✓ |
| 2 - Main/317 | POWER INSTALLATION | 14 | 399,600.00 | 399,600.00 | ✓ |
| 2 - Main/318 | POWER INSTALLATION | 15 | 94,640.00 | 94,640.00 | ✓ |
| 2 - Main/319 | POWER INSTALLATION | 17 | 213,760.00 | 213,760.00 | ✓ |
| 2 - Main/320 | POWER INSTALLATION | 20 | 290,080.00 | 290,080.00 | ✓ |
| 2 - Main/321 | POWER INSTALLATION | 15 | 346,560.00 | 346,560.00 | ✓ |
| 2 - Main/322 | POWER INSTALLATION | 15 | 239,760.00 | 239,760.00 | ✓ |
| 2 - Main/323 | POWER INSTALLATION | 16 | 156,480.00 | 156,480.00 | ✓ |
| 2 - Main/324 | POWER INSTALLATION | 16 | 288,080.00 | 288,080.00 | ✓ |
| 2 - Main/325 | POWER INSTALLATION | 19 | 132,880.00 | 132,880.00 | ✓ |
| 2 - Main/326 | POWER INSTALLATION | 14 | 368,400.00 | 368,400.00 | ✓ |
| 2 - Main/327 | POWER INSTALLATION | 17 | 153,440.00 | 153,440.00 | ✓ |
| 2 - Main/328 | POWER INSTALLATION | 18 | 202,720.00 | 202,720.00 | ✓ |
| 2 - Main/329 | POWER INSTALLATION | 14 | 359,840.00 | 359,840.00 | ✓ |
| 2 - Main/330 | POWER INSTALLATION | 18 | 133,760.00 | 133,760.00 | ✓ |
| 2 - Main/331 | POWER INSTALLATION | 14 | 329,840.00 | 329,840.00 | ✓ |
| 2 - Main/332 | POWER INSTALLATION | 18 | 250,400.00 | 250,400.00 | ✓ |
| 2 - Main/333 | POWER INSTALLATION | 16 | 318,880.00 | 318,880.00 | ✓ |
| 2 - Main/334 | POWER INSTALLATION | 15 | 190,810.00 | 190,810.00 | ✓ |
| 2 - Main/335 | POWER INSTALLATION | 14 | 147,810.00 | 147,810.00 | ✓ |
| 2 - Main/336 | POWER INSTALLATION | 12 | 119,170.00 | 119,170.00 | ✓ |
| 2 - Main/337 | POWER INSTALLATION | 11 | 203,060.00 | 203,060.00 | ✓ |
| 2 - Main/338 | POWER INSTALLATION | 13 | 194,210.00 | 194,210.00 | ✓ |
| 2 - Main/339 | POWER INSTALLATION | 14 | 150,930.00 | 150,930.00 | ✓ |
| 2 - Main/340 | POWER INSTALLATION | 14 | 127,530.00 | 127,530.00 | ✓ |
| 2 - Main/341 | POWER INSTALLATION | 24 | 197,180.00 | 197,180.00 | ✓ |
| 2 - Main/342 | POWER INSTALLATION | 15 | 159,680.00 | 159,680.00 | ✓ |
| 2 - Main/343 | POWER INSTALLATION | 17 | 231,420.00 | 231,420.00 | ✓ |
| 2 - Main/344 | POWER INSTALLATION | 15 | 214,625.00 | 214,625.00 | ✓ |
| 2 - Main/345 | POWER INSTALLATION | 19 | 569,495.00 | 569,495.00 | ✓ |
| 2 - Main/346 | POWER INSTALLATION | 14 | 227,200.00 | 227,200.00 | ✓ |
| 2 - Main/347 | POWER INSTALLATION | 11 | 542,685.00 | 542,685.00 | ✓ |
| 2 - Main/348 | POWER INSTALLATION | 14 | 40,380.00 | 40,380.00 | ✓ |
| 2 - Main/349 | POWER INSTALLATION | 14 | 30,540.00 | 30,540.00 | ✓ |
| 2 - Main/350 | POWER INSTALLATION | 14 | 35,940.00 | 35,940.00 | ✓ |
| 2 - Main/351 | POWER INSTALLATION | 17 | 71,270.00 | 71,270.00 | ✓ |
| 2 - Main/352 | POWER INSTALLATION | 22 | 66,880.00 | 66,880.00 | ✓ |
| 2 - Main/353 | POWER INSTALLATION | 20 | 99,845.00 | 99,845.00 | ✓ |
| 2 - Main/354 | POWER INSTALLATION | 20 | 123,595.00 | 123,595.00 | ✓ |
| 2 - Main/355 | POWER INSTALLATION | 20 | 120,460.00 | 120,460.00 | ✓ |
| 2 - Main/356 | POWER INSTALLATION | 16 | 85,950.00 | 85,950.00 | ✓ |
| 2 - Main/357 | POWER INSTALLATION | 21 | 204,010.00 | 204,010.00 | ✓ |
| 2 - Main/358 | POWER INSTALLATION | 13 | 143,840.00 | 143,840.00 | ✓ |
| 2 - Main/359 | POWER INSTALLATION | 15 | 141,600.00 | 141,600.00 | ✓ |
| 2 - Main/360 | POWER INSTALLATION | 14 | 542,120.00 | 542,120.00 | ✓ |
| 2 - Main/361 | POWER INSTALLATION | 13 | 997,950.00 | 997,950.00 | ✓ |
| 2 - Main/362 | POWER INSTALLATION | 10 | 1,348,525.00 | 1,348,525.00 | ✓ |
| 2 - Main/363 | POWER INSTALLATION | 10 | 6,280,390.00 | 6,280,390.00 | ✓ |
| 2 - Main/364 | POWER INSTALLATION | 15 | 3,044,000.00 | 3,044,000.00 | ✓ |
| 2 - Main/365 | POWER INSTALLATION | 22 | 105,000.00 | 105,000.00 | ✓ |
| 2 - Main/366 | POWER INSTALLATION | 17 | 85,000.00 | 85,000.00 | ✓ |
| 2 - Main/367 | POWER INSTALLATION | 17 | 85,000.00 | 85,000.00 | ✓ |
| 2 - Main/368 | POWER INSTALLATION | 16 | 80,000.00 | 80,000.00 | ✓ |
| 2 - Main/369 | POWER INSTALLATION | 16 | 80,000.00 | 80,000.00 | ✓ |
| 2 - Main/370 | POWER INSTALLATION | 18 | 90,000.00 | 90,000.00 | ✓ |
| 2 - Main/371 | POWER INSTALLATION | 15 | 510,300.00 | 510,300.00 | ✓ |
| 2 - Main/372 | POWER INSTALLATION | 14 | 13,253,400.00 | 13,253,400.00 | ✓ |
| 2 - Main/373 | POWER INSTALLATION | 16 | 10,414,127.00 | 10,414,127.00 | ✓ |
| 2 - Main/374 | POWER INSTALLATION | 18 | 1,945,653.00 | 1,945,653.00 | ✓ |
| 2 - Main/375 | POWER INSTALLATION | 22 | 273,900.00 | 273,900.00 | ✓ |
| 2 - Main/376 | POWER INSTALLATION | 22 | 272,150.00 | 272,150.00 | ✓ |
| 2 - Main/377 | POWER INSTALLATION | 22 | 312,350.00 | 312,350.00 | ✓ |
| 2 - Main/378 | POWER INSTALLATION | 22 | 274,550.00 | 274,550.00 | ✓ |
| 2 - Main/379 | POWER INSTALLATION | 22 | 249,750.00 | 249,750.00 | ✓ |
| 2 - Main/380 | POWER INSTALLATION | 22 | 246,300.00 | 246,300.00 | ✓ |
| 2 - Main/381 | POWER INSTALLATION | 20 | 248,000.00 | 248,000.00 | ✓ |
| 2 - Main/382 | POWER INSTALLATION | 22 | 268,900.00 | 268,900.00 | ✓ |
| 2 - Main/383 | POWER INSTALLATION | 26 | 367,200.00 | 367,200.00 | ✓ |
| 2 - Main/384 | POWER INSTALLATION | 22 | 272,800.00 | 272,800.00 | ✓ |
| 2 - Main/385 | POWER INSTALLATION | 22 | 272,800.00 | 272,800.00 | ✓ |
| 550 blocks · 1 do not tie | 2,175,914,452.65 | ||||
Source verification
Independent checks of the imported result against the raw workbook.✓ item count
Independent re-count matches on all 9 sheets (7621 items).
✓ qty integrity
Quantity sums match the raw cells on every sheet.
✓ amount integrity
Amount sums match the raw cells on every sheet.
✓ row coverage
Every money-bearing row accounted for: items, block totals, 492 summary re-statements (excluded — would double-count), 366 post-summary annex rows (recorded, outside the bill's money story).
✓ mirror
Cell-for-cell fidelity: descriptions, codes, and the number/text/empty state of every qty, rate and amount match the raw cells (30484 cells compared).
✓ summary map
2 summary sheets, 2 entries: 2 matched to imported totals · imported but absent from every summary: 2 - Main, 3 - Ext, 3M, 4.1-M, 4.2-M, 4.3-M, 4.4-M
✓ summary self check
The workbook's own summaries are internally consistent (5 checks across 3 sheets).
✗ section tie
24/27 declared sections tie to the cent · DIFFERING: 2/R: declared 249590682.12, imported 249611555.25 (20873.13) · declared but not in this import: 1/GR “GENERAL REQUIREMENTS FOR THE WHOLE OF TH” declared 313190338.58; 4/PS “PROVISIONAL SUMS” declared 5720000.00 · 240 lines carry no section reference
✓ zone tie
band identified arithmetically as BASEMENTS · GF & PODIUM · TOWER 1 · TOWER 2 · TOWER 3 · TOWER 4 (the identity held on 388/388 sampled priced rows) · 150/150 declared zone cells tie · the bidder keeps their own check on 7349 rows: we agree on 7211, differ on 2 (133 not comparable because the Amount cell prints words — their formula compares a number against text, which Excel makes FALSE whatever the arithmetic; 3 because a zone cell prints words) · 2 rows where their check asserts TRUE over a split that does not add up · 3 of 7340 priced rows do not add across their zones
✗ tender tie
Declared tender 2478843708.09 − this import 2175914452.63 = 302929255.46. Declared scopes absent from this import come to 318910338.58 (1/GR, 4/PS), so this import holds 15981083.12 MORE than the summary declares — imported sheets the summary never names: 2 - Main, 3M, 4.1-M, 4.2-M, 4.3-M, 4.4-M.
✓ amount in words
The tender figure in words could not be read back as a number, so it is not compared: “United Arab Emirates dirham”
✓ summary strays
Off-column numbers beside summary entries, reported and never counted: Summary row 74: stray 26064.689999999944 beside “TOTAL AMOUNT”; Summary row 74: stray 28993484.57707391 beside “TOTAL AMOUNT”; Summary row 84: stray 1113.574620300764 beside “….......................................” …
✗ summary echo
2/8 sheet totals re-stated verbatim by the workbook's own summary sheets (missing: 2 - Main, 3M, 4.1-M, 4.2-M, 4.3-M, 4.4-M)