AED · ADDRESS RESIDENCES ZABEEL

EMR ZFD AZR MW 0177 BOQ (OCT 2024) PTA456 — 9 sheets

EMR ZFD AZR MW 0177 BOQ (OCT 2024) PTA456 — 9 sheets.xlsxNeeds review
Bill total
2,175,914,452.65
-73.13 vs qty×rate
Needs review
534
93%
8 errors · 526 to acknowledge
Reconciliation
Does not reconcile
LINEPAGESECTIONZONEBILLSUMMARY
Source verification
10/13
independent proofs against the raw file
Size
7,621
550 collection blocks · 9 sheets

7 lines carry no item reference, though every other line on their page does

error

Either the reference was missed in the source, or the row is not an item.

  • Type 12; size (2650+2400) x 625 x 3165mm high; L-shaped
  • Type 12; size 1750 x 625 x 3165mm high
  • Powerfloating
70,405 units measured5,617,193.00 carriedlargest: 5,192,325.00 2/J/1

1 line does not multiply out — quantity × rate is not the amount shown

error

The page total uses the printed amount, so the quantity is usually what is wrong.

  • Allow for inspection, testing and commissioning including all off-site and factory testing; inspections to demonstrate compliance with relevant specifications and standards; operating the completed installations; submitting all relevant test record sheets at the completion of the installations
1 unit measured11,884,550.25 carriedlargest: 11,884,550.25 2/R/166 C

1 block does not add up to the collection total its own page prints

error

Both figures are shown — neither is corrected to the other.

363 lines carry no rate, so nothing reaches the totals

to answer

Say why the bidder left them unpriced, or ask them to price them.

  • Where any item, clause or sub-clause of the General Requirements has not been priced, it will be deemed that the value of such item, clause or sub-clause is included in the rates for measured items elsewhere in the Bills of Quantities.
  • The rates and prices in these Bills of Quantities are fixed for the duration of the Contract and shall not be subject to any adjustment in respect of rise or fall in the cost of labour, materials, plant, equipment, transport or any other matters affecting the cost of execution of the Contract.
  • References hereunder to the Schedule of Project Requirements (SOPR) are intended solely to direct the Contractor to the specific requirements of the Schedule of Project Requirements in respect of a particular item and do not in any way limit the scope of such item to the requirements of the Schedule of Project Requirements.
92,770.88 units measuredlargest: 25,649 m2 3/R/1 B

160 lines print words where a figure belongs

to answer

Accept the wording as a class, or put it to the bidder.

  • 4 Contractor's All Risk Policy
  • 7 Third Party liability insurance
  • Removed off-site to approved location (RATE ONLY)
6,735 units measuredlargest: 3,659 Nr. 2/Q/43 C

1 line restarts its lettering without a new heading

to answer

Usually a heading the page prints that was not picked up.

  • Coupling beams
827 units measured496,200.00 carriedlargest: 496,200.00 2/C/3 A

1 line repeats an item letter already used under the same heading

to answer

Kept exactly as printed — confirm which line the bidder meant.

  • DB-T4-(04-05)-1BA1, TCL = 7.73kW
2 units measured5,250.00 carriedlargest: 5,250.00 2/R/101 X

1 line has no heading above it while its neighbours do

to answer

A governing heading may have been missed when the page was read.

  • Allow for planting edging
1 unit measured30,000.00 carriedlargest: 30,000.00 3/B/4 L
ItemDescriptionQtyUnitRateAmountState
— · GR1/1
0/3 clear
0.00 Σ lines 313,190,338.58 printed
Generally
Where any item, clause or sub-clause of the General Requirements has not been priced, it will be deemed that the value of such item, clause or sub-clause is included in the rates for measured items elsewhere in the Bills of Quantities.
REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
Item0.00Needs review
Generally
The rates and prices in these Bills of Quantities are fixed for the duration of the Contract and shall not be subject to any adjustment in respect of rise or fall in the cost of labour, materials, plant, equipment, transport or any other matters affecting the cost of execution of the Contract.
REVIEWThe source prints neither a quantity nor a rate and the Amount cell is empty — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
ItemNeeds review
Generally
References hereunder to the Schedule of Project Requirements (SOPR) are intended solely to direct the Contractor to the specific requirements of the Schedule of Project Requirements in respect of a particular item and do not in any way limit the scope of such item to the requirements of the Schedule of Project Requirements.
REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
Item0.00Needs review
— · GR1/2
0/9 clear
0.00 Σ lines 0.00 printed
A1.1- Schedule of Clauses
1 As per Emaar standard CoC
REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
Item0.00Needs review
A1.1- Schedule of Clauses
2 Advance Payment Guarantee
REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
Item0.00Needs review
A1.1- Schedule of Clauses
3 Performance Bond
REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
Item0.00Needs review
A1.1- Schedule of Clauses
4 Contractor's All Risk Policy
REVIEWAmount column prints "By Employer" — counted as 0.00 in the totals, exactly as the source's own page total does. Confirm this is intended (e.g. a RATE ONLY schedule).
ItemBy EmployerNeeds review
A1.1- Schedule of Clauses
5 Workmen's Compensation Insurance
REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
Item0.00Needs review
A1.1- Schedule of Clauses
6 Professional Indemnity insurance
REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
Item0.00Needs review
A1.1- Schedule of Clauses
7 Third Party liability insurance
REVIEWAmount column prints "By Employer" — counted as 0.00 in the totals, exactly as the source's own page total does. Confirm this is intended (e.g. a RATE ONLY schedule).
ItemBy EmployerNeeds review
A1.1- Schedule of Clauses
8 Plant and Contractor's Equipment Insurance
REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
Item0.00Needs review
A1.1- Schedule of Clauses
9 Motor Vehicle Third Party and Passenger Liability Insurance
REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
Item0.00Needs review
— · GR1/3
0/1 clear
0.00 Σ lines 0.00 printed
A1.1- Schedule of Clauses
The Contractor shall price hereunder any special requirements related to the specification clauses
REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
Item0.00Needs review
— · GR1/4
0/5 clear
0.00 Σ lines 0.00 printed
A3 - Restrictions
1 Access for and Possession or use of the Site
REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
Item0.00Needs review
A3 - Restrictions
2 Limitations of working space
REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
Item0.00Needs review
A3 - Restrictions
3 Limitations of working hours
REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
Item0.00Needs review
A3 - Restrictions
4 The Maintenance of existing services on, under or over the Site
REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
Item0.00Needs review
A3 - Restrictions
5 The Execution of the Works in the required specific order, sections or phases
REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
Item0.00Needs review
— · GR1/5
0/7 clear
0.00 Σ lines 0.00 printed
1 Office for the Contract administrators
i. Establishment
REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
Item0.00Needs review
1 Office for the Contract administrators
ii. Maintenance
REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
Item0.00Needs review
1 Office for the Contract administrators
iii. Removal
REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
Item0.00Needs review
1 Office for the Contract administrators
2 Supervision
REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
Item0.00Needs review
1 Office for the Contract administrators
3 Security
REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
Item0.00Needs review
1 Office for the Contract administrators
4 Safety, health and welfare of workpeople
REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
Item0.00Needs review
1 Office for the Contract administrators
5 Transport of workpeople
REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
Item0.00Needs review
— · GR1/6
0/16 clear
0.00 Σ lines 0.00 printed
1 Small plant and tools
i. Establishment (Fixed Charges)
REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
Item0.00Needs review
1 Small plant and tools
ii. Maintenance (Time Related Charges)
REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
Item0.00Needs review
1 Small plant and tools
iii. Removal (Fixed Charges)
REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
Item0.00Needs review
2 Scaffoldings
i. Establishment (Fixed Charges)
REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
Item0.00Needs review
2 Scaffoldings
ii. Maintenance (Time Related Charges)
REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
Item0.00Needs review
2 Scaffoldings
iii. Removal (Fixed Charges)
REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
Item0.00Needs review
3 Cranes and lifting plant
i. Establishment (Fixed Charges)
REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
Item0.00Needs review
3 Cranes and lifting plant
ii. Maintenance (Time Related Charges)
REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
Item0.00Needs review
3 Cranes and lifting plant
iii. Removal (Fixed Charges)
REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
Item0.00Needs review
4 Plant required for specific trades
i. Establishment (Fixed Charges)
REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
Item0.00Needs review
4 Plant required for specific trades
ii. Maintenance (Time Related Charges)
REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
Item0.00Needs review
4 Plant required for specific trades
iii. Removal (Fixed Charges)
REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
Item0.00Needs review
5 Site Transport
i. Establishment (Fixed Charges)
REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
Item0.00Needs review
5 Site Transport
ii. Maintenance (Time Related Charges)
REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
Item0.00Needs review
5 Site Transport
iii. Removal (Fixed Charges)
REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
Item0.00Needs review
5 Site Transport
6 Other plant not listed above but necessary for the completion of the Works
REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
Item0.00Needs review
— · GR1/7
0/11 clear
0.00 Σ lines 0.00 printed
1 - Temporary fully functional site facilities
i. Establishment (Fixed Charges)
REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
Item0.00Needs review
1 - Temporary fully functional site facilities
ii. Maintenance (Time Related Charges)
REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
Item0.00Needs review
1 - Temporary fully functional site facilities
iii. Removal (Fixed Charges)
REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
Item0.00Needs review
2 - Telephones, including costs of calls
i. Establishment (Fixed Charges)
REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
Item0.00Needs review
2 - Telephones, including costs of calls
ii. Maintenance (Time Related Charges)
REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
Item0.00Needs review
2 - Telephones, including costs of calls
iii. Removal (Fixed Charges)
REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
Item0.00Needs review
2 - Telephones, including costs of calls
3 - Attendance of staff (for example, drivers, laboratory assistants)
REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
Item0.00Needs review
4 - Equipment (for example surveying equipment, laboratory equipment)
i. Establishment (Fixed Charges)
REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
Item0.00Needs review
4 - Equipment (for example surveying equipment, laboratory equipment)
ii. Maintenance (Time Related Charges)
REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
Item0.00Needs review
4 - Equipment (for example surveying equipment, laboratory equipment)
iii. Removal (Fixed Charges)
REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
Item0.00Needs review
4 - Equipment (for example surveying equipment, laboratory equipment)
5 - Special requirements for programmes or progress charts
REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
Item0.00Needs review
— · GR1/8
0/4 clear
0.00 Σ lines 0.00 printed
6 Any other facilities (for example, progress photographs).
i. Establishment (Fixed Charges)
REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
Item0.00Needs review
6 Any other facilities (for example, progress photographs).
ii. Maintenance (Time Related Charges)
REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
Item0.00Needs review
6 Any other facilities (for example, progress photographs).
iii. Removal (Fixed Charges)
REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
Item0.00Needs review
Signboard
Existing signboard to be taken over from Enabling Works contractor and Main Works contractor to update the names, maintain as required, remove after completion of the Works
REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
Item0.00Needs review
— · GR1/9
0/12 clear
0.00 Σ lines 0.00 printed
1 - Contractor's Facilities, including offices, toilets, laboratories, compounds, stores, mess rooms
i. Establishment (Fixed Charges)
REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
Item0.00Needs review
1 - Contractor's Facilities, including offices, toilets, laboratories, compounds, stores, mess rooms
ii. Maintenance (Time Related Charges)
REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
Item0.00Needs review
1 - Contractor's Facilities, including offices, toilets, laboratories, compounds, stores, mess rooms
iii. Removal (Fixed Charges)
REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
Item0.00Needs review
2 - Temporary fencing, hoardings
i. Existing temporary site perimeter hoarding to be taken over from Enabling Works contractor and Main Works contractor to move / remove / adjust, maintain as required
REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
Item0.00Needs review
2 - Temporary fencing, hoardings
ii. Maintenance (Time Related Charges)
REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
Item0.00Needs review
2 - Temporary fencing, hoardings
ii. Final Removal (Fixed Charges)
REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
Item0.00Needs review
3 Screens and guardrails
i. Establishment (Fixed Charges)
REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
Item0.00Needs review
3 Screens and guardrails
ii. Maintenance (Time Related Charges)
REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
Item0.00Needs review
3 Screens and guardrails
iii. Removal (Fixed Charges)
REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
Item0.00Needs review
4 Temporary roads, hard standings and crossings
i. Establishment (Fixed Charges)
REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
Item0.00Needs review
4 Temporary roads, hard standings and crossings
ii. Maintenance (Time Related Charges)
REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
Item0.00Needs review
4 Temporary roads, hard standings and crossings
iii. Removal (Fixed Charges)
REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
Item0.00Needs review
— · GR1/10
0/9 clear
0.00 Σ lines 0.00 printed
5 Water for the Works
i. Establishment (Fixed Charges)
REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
Item0.00Needs review
5 Water for the Works
ii. Maintenance (Time Related Charges)
REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
Item0.00Needs review
5 Water for the Works
iii. Removal (Fixed Charges)
REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
Item0.00Needs review
6 Lighting and power for the Works
i. Establishment (Fixed Charges)
REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
Item0.00Needs review
6 Lighting and power for the Works
ii. Maintenance (Time Related Charges)
REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
Item0.00Needs review
6 Lighting and power for the Works
iii. Removal (Fixed Charges)
REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
Item0.00Needs review
7 Temporary telephones, electronic mail and facsimile
i. Establishment (Fixed Charges)
REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
Item0.00Needs review
7 Temporary telephones, electronic mail and facsimile
ii. Maintenance (Time Related Charges)
REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
Item0.00Needs review
7 Temporary telephones, electronic mail and facsimile
iii. Removal (Fixed Charges)
REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
Item0.00Needs review
— · GR1/11
0/3 clear
0.00 Σ lines 0.00 printed
A8.1 An item shall be given for temporary works including design, which shall include:
1 Traffic diversion
REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
Item0.00Needs review
A8.1 An item shall be given for temporary works including design, which shall include:
2 Access roads
REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
Item0.00Needs review
A8.1 An item shall be given for temporary works including design, which shall include:
3 Pumping
REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
Item0.00Needs review
— · GR1/12
0/14 clear
0.00 Σ lines 0.00 printed
A9.1 An item shall be given for temporary works, which shall include:
1 - Testing of materials
REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
Item0.00Needs review
A9.1 An item shall be given for temporary works, which shall include:
2 - Testing of the Works
REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
Item0.00Needs review
A9.1 An item shall be given for temporary works, which shall include:
3 - Protecting the Works from inclement weather
REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
Item0.00Needs review
A9.1 An item shall be given for temporary works, which shall include:
4 - Removing rubbish, protective casings and coverings and cleaning the Works at completion
REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
Item0.00Needs review
A9.1 An item shall be given for temporary works, which shall include:
5 - Traffic regulations
REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
Item0.00Needs review
A9.1 An item shall be given for temporary works, which shall include:
6 - Maintenance of public and private roads
REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
Item0.00Needs review
A9.1 An item shall be given for temporary works, which shall include:
7 - Drying the Works
REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
Item0.00Needs review
A9.1 An item shall be given for temporary works, which shall include:
8 - Control of noise and pollution
REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
Item0.00Needs review
A9.1 An item shall be given for temporary works, which shall include:
9 - All Statutory obligations
REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
Item0.00Needs review
A9.2 Particulars shall be given where the nature or extent of the sundry items is not at the discretion of the Contractor.
1 - Coordination with the Works by Others
REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
Item0.00Needs review
A9.2 Particulars shall be given where the nature or extent of the sundry items is not at the discretion of the Contractor.
2 - Surveys, Setting-out and Levels
REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
Item0.00Needs review
A9.2 Particulars shall be given where the nature or extent of the sundry items is not at the discretion of the Contractor.
3 - Dust Control, Pest Control and Lightning Protection
REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
Item0.00Needs review
A9.2 Particulars shall be given where the nature or extent of the sundry items is not at the discretion of the Contractor.
4 - Off site storage
REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
Item0.00Needs review
A9.2 Particulars shall be given where the nature or extent of the sundry items is not at the discretion of the Contractor.
5 - Packing, marking, storage, handling and unpacking
REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
Item0.00Needs review
— · GR1/13
0/18 clear
0.00 Σ lines 0.00 printed
A9.2 Particulars shall be given where the nature or extent of the sundry items is not at the discretion of the Contractor.
6 - Specialist Third Party Testing, Commissioning and Certification
REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
Item0.00Needs review
A9.2 Particulars shall be given where the nature or extent of the sundry items is not at the discretion of the Contractor.
7 - Shop Drawings
REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
Item0.00Needs review
A9.2 Particulars shall be given where the nature or extent of the sundry items is not at the discretion of the Contractor.
8 - Submittal program, drawings and revisions
REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
Item0.00Needs review
A9.2 Particulars shall be given where the nature or extent of the sundry items is not at the discretion of the Contractor.
9 - Method Statements
REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
Item0.00Needs review
A9.2 Particulars shall be given where the nature or extent of the sundry items is not at the discretion of the Contractor.
10 - Operation and Maintenance Manuals
REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
Item0.00Needs review
A9.2 Particulars shall be given where the nature or extent of the sundry items is not at the discretion of the Contractor.
11 - Building Information Modelling (BIM) System
REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
Item0.00Needs review
A9.2 Particulars shall be given where the nature or extent of the sundry items is not at the discretion of the Contractor.
12 - Project Management System - Unifier
REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
Item0.00Needs review
A9.2 Particulars shall be given where the nature or extent of the sundry items is not at the discretion of the Contractor.
12 - Internet connection requirements on site
REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
Item0.00Needs review
A9.2 Particulars shall be given where the nature or extent of the sundry items is not at the discretion of the Contractor.
13 - Precautions against Fire
REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
Item0.00Needs review
A9.2 Particulars shall be given where the nature or extent of the sundry items is not at the discretion of the Contractor.
15 - Project Health, Safety, Environment and Security Guidelines
REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
Item0.00Needs review
A9.2 Particulars shall be given where the nature or extent of the sundry items is not at the discretion of the Contractor.
16 - General cleaning and waste disposal during construction
REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
Item0.00Needs review
A9.2 Particulars shall be given where the nature or extent of the sundry items is not at the discretion of the Contractor.
17 - Final Cleaning for Project Handover
REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
Item0.00Needs review
A9.2 Particulars shall be given where the nature or extent of the sundry items is not at the discretion of the Contractor.
18 - Provision of Handover Documentation
REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
Item0.00Needs review
A9.2 Particulars shall be given where the nature or extent of the sundry items is not at the discretion of the Contractor.
19 - Contract Spares/Attic stock
REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
Item0.00Needs review
A9.2 Particulars shall be given where the nature or extent of the sundry items is not at the discretion of the Contractor.
20 - As-built drawings
REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
Item0.00Needs review
A9.2 Particulars shall be given where the nature or extent of the sundry items is not at the discretion of the Contractor.
21 - Design of the Works to the extent provided for in the Contract
REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
Item0.00Needs review
A9.2 Particulars shall be given where the nature or extent of the sundry items is not at the discretion of the Contractor.
22 - Warranties
REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
Item0.00Needs review
A9.2 Particulars shall be given where the nature or extent of the sundry items is not at the discretion of the Contractor.
Waterproofing Warranties *Extra over for Consequential damages to other works due to waterproofing damages: - Warranty for waterproofing shall be inclusive of other related works which are necessary due to the defective water proofing, such as but not limited to removal and making good of tiles, painting, plastering, joinery works etc. This shall be mentioned in the Warranty Certificate. (Waterproofing warranty shall be covered within item S above)
REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
Item0.00Needs review
— · GR1/14
0/2 clear
0.00 Σ lines 0.00 printed
A9.2 Particulars shall be given where the nature or extent of the sundry items is not at the discretion of the Contractor.
23 - All mock-ups, prototypes and samples required by the Specification, the Drawings and the Schedule of Project Requirements
REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
Item0.00Needs review
A9.2 Particulars shall be given where the nature or extent of the sundry items is not at the discretion of the Contractor.
24 - Provide for Employer's Requirements as per Appendix R of the SOPR
REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
Item0.00Needs review
— · GR1/15
0/1 clear
0.00 Σ lines 0.00 printed
Additional Items
Any items that may not be covered elsewhere in the Bills of Quantities which the Tenderer deemed to be necessary in order to carry out the works in full compliance with the SOPR must be itemised and price below
REVIEWThe source prints neither a quantity nor a rate and the Amount cell is empty — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
ItemNeeds review
2/B · 2/B/2 · BORED PILING · 2 - Main/2
0/2 clear
0.00 Σ lines
Disposal of unsuitable and surplus materials arising from excavation; including all ancillary works as necessary
Removed off-site to approved location (RATE ONLY)
REVIEWAmount column prints "Rate Only" — counted as 0.00 in the totals, exactly as the source's own page total does. Confirm this is intended (e.g. a RATE ONLY schedule).
m3Rate OnlyNeeds review
Filling; engineered filling materials including 95% MDD compaction, shoring, chemical treatment, and all ancillary works necessary
Compacted fill; various thickness; to slab on grade
REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
m30.00Needs review
2/B · 2/B/3 · GENERALLY · 2 - Main/3
0/1 clear
0.00 Σ lines 0.00 printed
Allow for any other works which are not included above and which are required to complete the Site Work in accordance with the Specification and the Drawings (Tenderer to list below):
REVIEW1 Item measured, but the source prints no rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
1Item0.00Needs review
2/C · 2/C/1 · POURED CONCRETE · 2 - Main/4
0/1 clear
0.00 Σ lines
Reinforced concrete; concrete grade C50/60
Slab on grade; 250mm thick
REVIEW0 m3 measured, but the source prints no rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
0m30.00Needs review
2/C · 2/C/2 · POURED CONCRETE · 2 - Main/5
0/1 clear
0.00 Σ lines
Reinforced concrete; concrete grade C50/60
Columns
REVIEW2,734 m3 measured, but the source prints no rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
2,734m30.00Needs review
2/C · 2/C/3 · POURED CONCRETE · 2 - Main/6
0/3 clear
496,200.00 Σ lines
Reinforced concrete; concrete grade C56/70
Coupling beams
REVIEWReference sequence restarts at "A" on 2 - Main/6 without a heading change — a governing heading may have been missed above it.
827m3600.00496,200.00Needs review
Reinforced concrete; concrete grade C56/70
Blade wall; 600mm thick
REVIEW96 m3 measured, but the source prints no rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
96m30.00Needs review
Reinforced concrete; concrete grade C70/85
Blade wall; 400mm thick
REVIEW1,721 m3 measured, but the source prints no rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
1,721m30.00Needs review
2/C · 2/C/6 · REINFORCEMENT · 2 - Main/9
0/1 clear
0.00 Σ lines
Reinforcing steel bars; high yield deformed; grade 60
Planter wall
REVIEW8.88 t measured, but the source prints no rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
8.88t0.00Needs review
2/C · 2/C/7 · SHUTTERING · 2 - Main/10
0/1 clear
0.00 Σ lines
Formwork system; including design, supports, formed finishes, temporary works, accessories and all ancillary works as necessary
Sides of slab on grade
REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
m20.00Needs review
2/C · 2/C/11 · GENERALLY · 2 - Main/14
0/1 clear
0.00 Σ lines 0.00 printed
Allow for any other works which are not included above and which are required to complete the Concrete Work in accordance with the Specification and the Drawings (Tenderer to list below):
REVIEW1 Item measured, but the source prints no rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
1Item0.00Needs review
2/D · 2/D/2 · SUNDRIES · 2 - Main/16
0/4 clear
0.00 Σ lines 0.00 printed
loading more… 150 of 534 lines rendered
ItemDescriptionQtyUnitRateAmountState
— no work-group heading —
0/115 clear
0.00 Σ lines
Generally
Where any item, clause or sub-clause of the General Requirements has not been priced, it will be deemed that the value of such item, clause or sub-clause is included in the rates for measured items elsewhere in the Bills of Quantities.
REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
Item0.00Needs review
Generally
The rates and prices in these Bills of Quantities are fixed for the duration of the Contract and shall not be subject to any adjustment in respect of rise or fall in the cost of labour, materials, plant, equipment, transport or any other matters affecting the cost of execution of the Contract.
REVIEWThe source prints neither a quantity nor a rate and the Amount cell is empty — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
ItemNeeds review
Generally
References hereunder to the Schedule of Project Requirements (SOPR) are intended solely to direct the Contractor to the specific requirements of the Schedule of Project Requirements in respect of a particular item and do not in any way limit the scope of such item to the requirements of the Schedule of Project Requirements.
REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
Item0.00Needs review
A1.1- Schedule of Clauses
1 As per Emaar standard CoC
REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
Item0.00Needs review
A1.1- Schedule of Clauses
2 Advance Payment Guarantee
REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
Item0.00Needs review
A1.1- Schedule of Clauses
3 Performance Bond
REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
Item0.00Needs review
A1.1- Schedule of Clauses
4 Contractor's All Risk Policy
REVIEWAmount column prints "By Employer" — counted as 0.00 in the totals, exactly as the source's own page total does. Confirm this is intended (e.g. a RATE ONLY schedule).
ItemBy EmployerNeeds review
A1.1- Schedule of Clauses
5 Workmen's Compensation Insurance
REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
Item0.00Needs review
A1.1- Schedule of Clauses
6 Professional Indemnity insurance
REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
Item0.00Needs review
A1.1- Schedule of Clauses
7 Third Party liability insurance
REVIEWAmount column prints "By Employer" — counted as 0.00 in the totals, exactly as the source's own page total does. Confirm this is intended (e.g. a RATE ONLY schedule).
ItemBy EmployerNeeds review
A1.1- Schedule of Clauses
8 Plant and Contractor's Equipment Insurance
REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
Item0.00Needs review
A1.1- Schedule of Clauses
9 Motor Vehicle Third Party and Passenger Liability Insurance
REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
Item0.00Needs review
A1.1- Schedule of Clauses
The Contractor shall price hereunder any special requirements related to the specification clauses
REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
Item0.00Needs review
A3 - Restrictions
1 Access for and Possession or use of the Site
REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
Item0.00Needs review
A3 - Restrictions
2 Limitations of working space
REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
Item0.00Needs review
A3 - Restrictions
3 Limitations of working hours
REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
Item0.00Needs review
A3 - Restrictions
4 The Maintenance of existing services on, under or over the Site
REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
Item0.00Needs review
A3 - Restrictions
5 The Execution of the Works in the required specific order, sections or phases
REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
Item0.00Needs review
1 Office for the Contract administrators
i. Establishment
REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
Item0.00Needs review
1 Office for the Contract administrators
ii. Maintenance
REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
Item0.00Needs review
1 Office for the Contract administrators
iii. Removal
REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
Item0.00Needs review
1 Office for the Contract administrators
2 Supervision
REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
Item0.00Needs review
1 Office for the Contract administrators
3 Security
REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
Item0.00Needs review
1 Office for the Contract administrators
4 Safety, health and welfare of workpeople
REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
Item0.00Needs review
1 Office for the Contract administrators
5 Transport of workpeople
REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
Item0.00Needs review
1 Small plant and tools
i. Establishment (Fixed Charges)
REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
Item0.00Needs review
1 Small plant and tools
ii. Maintenance (Time Related Charges)
REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
Item0.00Needs review
1 Small plant and tools
iii. Removal (Fixed Charges)
REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
Item0.00Needs review
2 Scaffoldings
i. Establishment (Fixed Charges)
REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
Item0.00Needs review
2 Scaffoldings
ii. Maintenance (Time Related Charges)
REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
Item0.00Needs review
2 Scaffoldings
iii. Removal (Fixed Charges)
REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
Item0.00Needs review
3 Cranes and lifting plant
i. Establishment (Fixed Charges)
REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
Item0.00Needs review
3 Cranes and lifting plant
ii. Maintenance (Time Related Charges)
REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
Item0.00Needs review
3 Cranes and lifting plant
iii. Removal (Fixed Charges)
REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
Item0.00Needs review
4 Plant required for specific trades
i. Establishment (Fixed Charges)
REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
Item0.00Needs review
4 Plant required for specific trades
ii. Maintenance (Time Related Charges)
REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
Item0.00Needs review
4 Plant required for specific trades
iii. Removal (Fixed Charges)
REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
Item0.00Needs review
5 Site Transport
i. Establishment (Fixed Charges)
REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
Item0.00Needs review
5 Site Transport
ii. Maintenance (Time Related Charges)
REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
Item0.00Needs review
5 Site Transport
iii. Removal (Fixed Charges)
REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
Item0.00Needs review
5 Site Transport
6 Other plant not listed above but necessary for the completion of the Works
REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
Item0.00Needs review
1 - Temporary fully functional site facilities
i. Establishment (Fixed Charges)
REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
Item0.00Needs review
1 - Temporary fully functional site facilities
ii. Maintenance (Time Related Charges)
REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
Item0.00Needs review
1 - Temporary fully functional site facilities
iii. Removal (Fixed Charges)
REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
Item0.00Needs review
2 - Telephones, including costs of calls
i. Establishment (Fixed Charges)
REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
Item0.00Needs review
2 - Telephones, including costs of calls
ii. Maintenance (Time Related Charges)
REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
Item0.00Needs review
2 - Telephones, including costs of calls
iii. Removal (Fixed Charges)
REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
Item0.00Needs review
2 - Telephones, including costs of calls
3 - Attendance of staff (for example, drivers, laboratory assistants)
REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
Item0.00Needs review
4 - Equipment (for example surveying equipment, laboratory equipment)
i. Establishment (Fixed Charges)
REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
Item0.00Needs review
4 - Equipment (for example surveying equipment, laboratory equipment)
ii. Maintenance (Time Related Charges)
REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
Item0.00Needs review
4 - Equipment (for example surveying equipment, laboratory equipment)
iii. Removal (Fixed Charges)
REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
Item0.00Needs review
4 - Equipment (for example surveying equipment, laboratory equipment)
5 - Special requirements for programmes or progress charts
REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
Item0.00Needs review
6 Any other facilities (for example, progress photographs).
i. Establishment (Fixed Charges)
REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
Item0.00Needs review
6 Any other facilities (for example, progress photographs).
ii. Maintenance (Time Related Charges)
REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
Item0.00Needs review
6 Any other facilities (for example, progress photographs).
iii. Removal (Fixed Charges)
REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
Item0.00Needs review
Signboard
Existing signboard to be taken over from Enabling Works contractor and Main Works contractor to update the names, maintain as required, remove after completion of the Works
REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
Item0.00Needs review
1 - Contractor's Facilities, including offices, toilets, laboratories, compounds, stores, mess rooms
i. Establishment (Fixed Charges)
REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
Item0.00Needs review
1 - Contractor's Facilities, including offices, toilets, laboratories, compounds, stores, mess rooms
ii. Maintenance (Time Related Charges)
REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
Item0.00Needs review
1 - Contractor's Facilities, including offices, toilets, laboratories, compounds, stores, mess rooms
iii. Removal (Fixed Charges)
REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
Item0.00Needs review
2 - Temporary fencing, hoardings
i. Existing temporary site perimeter hoarding to be taken over from Enabling Works contractor and Main Works contractor to move / remove / adjust, maintain as required
REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
Item0.00Needs review
2 - Temporary fencing, hoardings
ii. Maintenance (Time Related Charges)
REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
Item0.00Needs review
2 - Temporary fencing, hoardings
ii. Final Removal (Fixed Charges)
REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
Item0.00Needs review
3 Screens and guardrails
i. Establishment (Fixed Charges)
REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
Item0.00Needs review
3 Screens and guardrails
ii. Maintenance (Time Related Charges)
REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
Item0.00Needs review
3 Screens and guardrails
iii. Removal (Fixed Charges)
REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
Item0.00Needs review
4 Temporary roads, hard standings and crossings
i. Establishment (Fixed Charges)
REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
Item0.00Needs review
4 Temporary roads, hard standings and crossings
ii. Maintenance (Time Related Charges)
REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
Item0.00Needs review
4 Temporary roads, hard standings and crossings
iii. Removal (Fixed Charges)
REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
Item0.00Needs review
5 Water for the Works
i. Establishment (Fixed Charges)
REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
Item0.00Needs review
5 Water for the Works
ii. Maintenance (Time Related Charges)
REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
Item0.00Needs review
5 Water for the Works
iii. Removal (Fixed Charges)
REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
Item0.00Needs review
6 Lighting and power for the Works
i. Establishment (Fixed Charges)
REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
Item0.00Needs review
6 Lighting and power for the Works
ii. Maintenance (Time Related Charges)
REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
Item0.00Needs review
6 Lighting and power for the Works
iii. Removal (Fixed Charges)
REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
Item0.00Needs review
7 Temporary telephones, electronic mail and facsimile
i. Establishment (Fixed Charges)
REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
Item0.00Needs review
7 Temporary telephones, electronic mail and facsimile
ii. Maintenance (Time Related Charges)
REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
Item0.00Needs review
7 Temporary telephones, electronic mail and facsimile
iii. Removal (Fixed Charges)
REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
Item0.00Needs review
A8.1 An item shall be given for temporary works including design, which shall include:
1 Traffic diversion
REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
Item0.00Needs review
A8.1 An item shall be given for temporary works including design, which shall include:
2 Access roads
REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
Item0.00Needs review
A8.1 An item shall be given for temporary works including design, which shall include:
3 Pumping
REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
Item0.00Needs review
A9.1 An item shall be given for temporary works, which shall include:
1 - Testing of materials
REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
Item0.00Needs review
A9.1 An item shall be given for temporary works, which shall include:
2 - Testing of the Works
REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
Item0.00Needs review
A9.1 An item shall be given for temporary works, which shall include:
3 - Protecting the Works from inclement weather
REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
Item0.00Needs review
A9.1 An item shall be given for temporary works, which shall include:
4 - Removing rubbish, protective casings and coverings and cleaning the Works at completion
REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
Item0.00Needs review
A9.1 An item shall be given for temporary works, which shall include:
5 - Traffic regulations
REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
Item0.00Needs review
A9.1 An item shall be given for temporary works, which shall include:
6 - Maintenance of public and private roads
REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
Item0.00Needs review
A9.1 An item shall be given for temporary works, which shall include:
7 - Drying the Works
REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
Item0.00Needs review
A9.1 An item shall be given for temporary works, which shall include:
8 - Control of noise and pollution
REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
Item0.00Needs review
A9.1 An item shall be given for temporary works, which shall include:
9 - All Statutory obligations
REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
Item0.00Needs review
A9.2 Particulars shall be given where the nature or extent of the sundry items is not at the discretion of the Contractor.
1 - Coordination with the Works by Others
REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
Item0.00Needs review
A9.2 Particulars shall be given where the nature or extent of the sundry items is not at the discretion of the Contractor.
2 - Surveys, Setting-out and Levels
REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
Item0.00Needs review
A9.2 Particulars shall be given where the nature or extent of the sundry items is not at the discretion of the Contractor.
3 - Dust Control, Pest Control and Lightning Protection
REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
Item0.00Needs review
A9.2 Particulars shall be given where the nature or extent of the sundry items is not at the discretion of the Contractor.
4 - Off site storage
REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
Item0.00Needs review
A9.2 Particulars shall be given where the nature or extent of the sundry items is not at the discretion of the Contractor.
5 - Packing, marking, storage, handling and unpacking
REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
Item0.00Needs review
A9.2 Particulars shall be given where the nature or extent of the sundry items is not at the discretion of the Contractor.
6 - Specialist Third Party Testing, Commissioning and Certification
REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
Item0.00Needs review
A9.2 Particulars shall be given where the nature or extent of the sundry items is not at the discretion of the Contractor.
7 - Shop Drawings
REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
Item0.00Needs review
A9.2 Particulars shall be given where the nature or extent of the sundry items is not at the discretion of the Contractor.
8 - Submittal program, drawings and revisions
REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
Item0.00Needs review
A9.2 Particulars shall be given where the nature or extent of the sundry items is not at the discretion of the Contractor.
9 - Method Statements
REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
Item0.00Needs review
A9.2 Particulars shall be given where the nature or extent of the sundry items is not at the discretion of the Contractor.
10 - Operation and Maintenance Manuals
REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
Item0.00Needs review
A9.2 Particulars shall be given where the nature or extent of the sundry items is not at the discretion of the Contractor.
11 - Building Information Modelling (BIM) System
REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
Item0.00Needs review
A9.2 Particulars shall be given where the nature or extent of the sundry items is not at the discretion of the Contractor.
12 - Project Management System - Unifier
REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
Item0.00Needs review
A9.2 Particulars shall be given where the nature or extent of the sundry items is not at the discretion of the Contractor.
12 - Internet connection requirements on site
REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
Item0.00Needs review
A9.2 Particulars shall be given where the nature or extent of the sundry items is not at the discretion of the Contractor.
13 - Precautions against Fire
REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
Item0.00Needs review
A9.2 Particulars shall be given where the nature or extent of the sundry items is not at the discretion of the Contractor.
15 - Project Health, Safety, Environment and Security Guidelines
REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
Item0.00Needs review
A9.2 Particulars shall be given where the nature or extent of the sundry items is not at the discretion of the Contractor.
16 - General cleaning and waste disposal during construction
REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
Item0.00Needs review
A9.2 Particulars shall be given where the nature or extent of the sundry items is not at the discretion of the Contractor.
17 - Final Cleaning for Project Handover
REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
Item0.00Needs review
A9.2 Particulars shall be given where the nature or extent of the sundry items is not at the discretion of the Contractor.
18 - Provision of Handover Documentation
REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
Item0.00Needs review
A9.2 Particulars shall be given where the nature or extent of the sundry items is not at the discretion of the Contractor.
19 - Contract Spares/Attic stock
REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
Item0.00Needs review
A9.2 Particulars shall be given where the nature or extent of the sundry items is not at the discretion of the Contractor.
20 - As-built drawings
REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
Item0.00Needs review
A9.2 Particulars shall be given where the nature or extent of the sundry items is not at the discretion of the Contractor.
21 - Design of the Works to the extent provided for in the Contract
REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
Item0.00Needs review
A9.2 Particulars shall be given where the nature or extent of the sundry items is not at the discretion of the Contractor.
22 - Warranties
REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
Item0.00Needs review
A9.2 Particulars shall be given where the nature or extent of the sundry items is not at the discretion of the Contractor.
Waterproofing Warranties *Extra over for Consequential damages to other works due to waterproofing damages: - Warranty for waterproofing shall be inclusive of other related works which are necessary due to the defective water proofing, such as but not limited to removal and making good of tiles, painting, plastering, joinery works etc. This shall be mentioned in the Warranty Certificate. (Waterproofing warranty shall be covered within item S above)
REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
Item0.00Needs review
A9.2 Particulars shall be given where the nature or extent of the sundry items is not at the discretion of the Contractor.
23 - All mock-ups, prototypes and samples required by the Specification, the Drawings and the Schedule of Project Requirements
REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
Item0.00Needs review
A9.2 Particulars shall be given where the nature or extent of the sundry items is not at the discretion of the Contractor.
24 - Provide for Employer's Requirements as per Appendix R of the SOPR
REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
Item0.00Needs review
Additional Items
Any items that may not be covered elsewhere in the Bills of Quantities which the Tenderer deemed to be necessary in order to carry out the works in full compliance with the SOPR must be itemised and price below
REVIEWThe source prints neither a quantity nor a rate and the Amount cell is empty — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
ItemNeeds review
EARTHWORKS
0/2 clear
0.00 Σ lines
Disposal of unsuitable and surplus materials arising from excavation; including all ancillary works as necessary
Removed off-site to approved location (RATE ONLY)
REVIEWAmount column prints "Rate Only" — counted as 0.00 in the totals, exactly as the source's own page total does. Confirm this is intended (e.g. a RATE ONLY schedule).
m3Rate OnlyNeeds review
Filling; engineered filling materials including 95% MDD compaction, shoring, chemical treatment, and all ancillary works necessary
Compacted fill; various thickness; to slab on grade
REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
m30.00Needs review
GENERALLY
0/30 clear
0.00 Σ lines
Allow for any other works which are not included above and which are required to complete the Site Work in accordance with the Specification and the Drawings (Tenderer to list below):
REVIEW1 Item measured, but the source prints no rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
1Item0.00Needs review
Allow for any other works which are not included above and which are required to complete the Concrete Work in accordance with the Specification and the Drawings (Tenderer to list below):
REVIEW1 Item measured, but the source prints no rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
1Item0.00Needs review
Allow for any other works which are not included above and which are required to complete the Masonry in accordance with the Specification and the Drawings (Tenderer to list below):
REVIEW1 Item measured, but the source prints no rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
1Item0.00Needs review
Allow for any other works which are not included above and which are required to complete the Metalwork in accordance with the Specification and the Drawings (Tenderer to list below):
REVIEW1 Item measured, but the source prints no rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
1Item0.00Needs review
Allow for any other works which are not included above and which are required to complete the Woodwork in accordance with the Specification and the Drawings (Tenderer to list below):
REVIEW1 Item measured, but the source prints no rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
1Item0.00Needs review
Allow for any other works which are not included above and which are required to complete the Thermal and Moisture Protection in accordance with the Specification and the Drawings (Tenderer to list below):
REVIEW1 Item measured, but the source prints no rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
1Item0.00Needs review
Allow for any other works which are not included above and which are required to complete the Doors and Windows in accordance with the Specification and the Drawings (Tenderer to list below):
REVIEW1 Item measured, but the source prints no rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
1Item0.00Needs review
Allow for any other works which are not included above and which are required to complete the Finishes in accordance with the Specification and the Drawings (Tenderer to list below):
REVIEW1 Item measured, but the source prints no rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
1Item0.00Needs review
Allow for any other works which are not included above and which are required to complete the Accessories in accordance with the Specification and the Drawings (Tenderer to list below):
REVIEW1 Item measured, but the source prints no rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
1Item0.00Needs review
Allow for any other works which are not included above and which are required to complete the Equipment in accordance with the Specification and the Drawings (Tenderer to list below):
REVIEW1 Item measured, but the source prints no rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
1Item0.00Needs review
Allow for any other works which are not included above and which are required to complete the Furnishings in accordance with the Specification and the Drawings (Tenderer to list below):
REVIEW1 Item measured, but the source prints no rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
1Item0.00Needs review
Allow for any other works which are not included above and which are required to complete the Conveying Systems in accordance with the Specification and the Drawings (Tenderer to list below):
REVIEW1 Item measured, but the source prints no rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
1Item0.00Needs review
Allow for any other works which are not included above and which are required to complete the Mechanical Engineering Installations in accordance with the Specification and the Drawings (Tenderer to list below):
REVIEW1 Item measured, but the source prints no rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
1Item0.00Needs review
Allow for any other works which are not included above and which are required to complete the Electrical Engineering Installations in accordance with the Specification and the Drawings (Tenderer to list below):
REVIEW1 Item measured, but the source prints no rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
1Item0.00Needs review
Allow for any other works which are not included above and which are required to complete the Site Works in accordance with the Specification and the Drawings (Tenderer to list below):
REVIEW0 Item measured, but the source prints no rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
0Item0.00Needs review
Allow for any other works which are not included above and which are required to complete the Concrete Works in accordance with the Specification and the Drawings (Tenderer to list below):
REVIEW0 Item measured, but the source prints no rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
0Item0.00Needs review
Allow for any other works which are not included above and which are required to complete the Metalwork in accordance with the Specification and the Drawings (Tenderer to list below):
REVIEW0 Item measured, but the source prints no rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
0Item0.00Needs review
Allow for any other works which are not included above and which are required to complete the Thermal and Moisture Protection in accordance with the Specification and the Drawings (Tenderer to list below):
REVIEW0 Item measured, but the source prints no rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
0Item0.00Needs review
Allow for any other works which are not included above and which are required to complete the Finishes in accordance with the Specification and the Drawings (Tenderer to list below):
REVIEW0 Item measured, but the source prints no rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
0Item0.00Needs review
Allow for any other works which are not included above and which are required to complete the Accessories in accordance with the Specification and the Drawings (Tenderer to list below):
REVIEW0 Item measured, but the source prints no rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
0Item0.00Needs review
Allow for any other works which are not included above and which are required to complete the Equipment in accordance with the Specification and the Drawings (Tenderer to list below):
REVIEW0 Item measured, but the source prints no rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
0Item0.00Needs review
Allow for any other works which are not included above and which are required to complete the Furnishing in accordance with the Specification and the Drawings (Tenderer to list below):
REVIEW0 Item measured, but the source prints no rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
0Item0.00Needs review
Allow for any other works which are not included above and which are required to complete the Special Construction in accordance with the Specification and the Drawings (Tenderer to list below):
REVIEW0 Item measured, but the source prints no rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
0Item0.00Needs review
Allow for any other works which are not included above and which are required to complete the Mechanical Engineering Installations in accordance with the Specification and the Drawings (Tenderer to list below):
REVIEW0 Item measured, but the source prints no rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
0Item0.00Needs review
Allow for any other works which are not included above and which are required to complete the Electrical Engineering Installations in accordance with the Specification and the Drawings (Tenderer to list below):
REVIEW0 Item measured, but the source prints no rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
0Item0.00Needs review
Allow for any other works which are not included above and which are required to complete the furnishings in accordance with the Specification and the Drawings (Tenderer to list below)
REVIEWThe source prints neither a quantity nor a rate and the Amount cell is empty — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
ItemNeeds review
Allow for any other works which are not included above and which are required to complete the furnishings in accordance with the Specification and the Drawings (Tenderer to list below)
REVIEWThe source prints neither a quantity nor a rate and the Amount cell is empty — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
ItemNeeds review
Allow for any other works which are not included above and which are required to complete the furnishings in accordance with the Specification and the Drawings (Tenderer to list below)
REVIEWThe source prints neither a quantity nor a rate and the Amount cell is empty — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
ItemNeeds review
Allow for any other works which are not included above and which are required to complete the furnishings in accordance with the Specification and the Drawings (Tenderer to list below)
REVIEWThe source prints neither a quantity nor a rate and the Amount cell is empty — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
ItemNeeds review
Allow for any other works which are not included above and which are required to complete the furnishings in accordance with the Specification and the Drawings (Tenderer to list below)
REVIEWThe source prints neither a quantity nor a rate and the Amount cell is empty — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
ItemNeeds review
loading more… 150 of 534 lines rendered
ItemDescriptionQtyUnitRateAmountState
Section 2/B · SECTION B - SITE WORKS · Page 2/B/1 - 2/B/4
0/3 clear
0.00 Σ lines
Disposal of unsuitable and surplus materials arising from excavation; including all ancillary works as necessary
Removed off-site to approved location (RATE ONLY)
REVIEWAmount column prints "Rate Only" — counted as 0.00 in the totals, exactly as the source's own page total does. Confirm this is intended (e.g. a RATE ONLY schedule).
m3Rate OnlyNeeds review
Filling; engineered filling materials including 95% MDD compaction, shoring, chemical treatment, and all ancillary works necessary
Compacted fill; various thickness; to slab on grade
REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
m30.00Needs review
Allow for any other works which are not included above and which are required to complete the Site Work in accordance with the Specification and the Drawings (Tenderer to list below):
REVIEW1 Item measured, but the source prints no rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
1Item0.00Needs review
Section 2/C · SECTION C - CONCRETE WORKS · Page 2/C/1 - 2/C/12
0/8 clear
496,200.00 Σ lines
Reinforced concrete; concrete grade C50/60
Slab on grade; 250mm thick
REVIEW0 m3 measured, but the source prints no rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
0m30.00Needs review
Reinforced concrete; concrete grade C50/60
Columns
REVIEW2,734 m3 measured, but the source prints no rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
2,734m30.00Needs review
Reinforced concrete; concrete grade C56/70
Coupling beams
REVIEWReference sequence restarts at "A" on 2 - Main/6 without a heading change — a governing heading may have been missed above it.
827m3600.00496,200.00Needs review
Reinforced concrete; concrete grade C56/70
Blade wall; 600mm thick
REVIEW96 m3 measured, but the source prints no rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
96m30.00Needs review
Reinforced concrete; concrete grade C70/85
Blade wall; 400mm thick
REVIEW1,721 m3 measured, but the source prints no rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
1,721m30.00Needs review
Reinforcing steel bars; high yield deformed; grade 60
Planter wall
REVIEW8.88 t measured, but the source prints no rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
8.88t0.00Needs review
Formwork system; including design, supports, formed finishes, temporary works, accessories and all ancillary works as necessary
Sides of slab on grade
REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
m20.00Needs review
Allow for any other works which are not included above and which are required to complete the Concrete Work in accordance with the Specification and the Drawings (Tenderer to list below):
REVIEW1 Item measured, but the source prints no rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
1Item0.00Needs review
Section 2/D · SECTION D - MASONRY · Page 2/D/1 - 2/D/4
0/5 clear
0.00 Σ lines
Joints in masonry; including fire resistant compressible joint filler, sealant, angle head restraints, telescopic, sleeved and/or debonded ties and the like
Dowelled control joints
REVIEWAmount column prints "Included" — counted as 0.00 in the totals, exactly as the source's own page total does. Confirm this is intended (e.g. a RATE ONLY schedule).
1ItemIncludedNeeds review
Joints in masonry; including fire resistant compressible joint filler, sealant, angle head restraints, telescopic, sleeved and/or debonded ties and the like
Dowelled control joints (RATE ONLY)
REVIEWAmount column prints "Rate Only" — counted as 0.00 in the totals, exactly as the source's own page total does. Confirm this is intended (e.g. a RATE ONLY schedule).
mRate OnlyNeeds review
Joints in masonry; including fire resistant compressible joint filler, sealant, angle head restraints, telescopic, sleeved and/or debonded ties and the like
Isolation joints
REVIEWAmount column prints "Included" — counted as 0.00 in the totals, exactly as the source's own page total does. Confirm this is intended (e.g. a RATE ONLY schedule).
1ItemIncludedNeeds review
Joints in masonry; including fire resistant compressible joint filler, sealant, angle head restraints, telescopic, sleeved and/or debonded ties and the like
Isolation joints (RATE ONLY)
REVIEWAmount column prints "Rate Only" — counted as 0.00 in the totals, exactly as the source's own page total does. Confirm this is intended (e.g. a RATE ONLY schedule).
mRate OnlyNeeds review
Allow for any other works which are not included above and which are required to complete the Masonry in accordance with the Specification and the Drawings (Tenderer to list below):
REVIEW1 Item measured, but the source prints no rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
1Item0.00Needs review
Section 2/E · SECTION E - METALWORK · Page 2/E/1 - 2/E/12
0/2 clear
0.00 Σ lines
Stainless steel ladders to water tanks; type AM-451; wall mounted stainless steel with safety cage; including finishes, frames, supports, fixings, accessories and all ancillary works as necessary
Type 2; size 960 x 690 x 10300mm high
REVIEW4 Nr. measured, but the source prints no rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
4Nr.0.00Needs review
Allow for any other works which are not included above and which are required to complete the Metalwork in accordance with the Specification and the Drawings (Tenderer to list below):
REVIEW1 Item measured, but the source prints no rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
1Item0.00Needs review
Section 2/F · SECTION F - WOOD WORK · Page 2/F/1 - 2/F/25
0/3 clear
135,070.00 Σ lines2 errors
Wardrobes; comprising 18mm thick MDF shelving and glass shutter; including MDF backing, carcass, frames, supports, front/side/back panels, doors, shelves, drawers, concealed light (measured separately), hardware, finishes, accessories and all ancillary works as necessary
Type 12; size (2650+2400) x 625 x 3165mm high; L-shaped
ERRORNo item reference on 2 - Main/39. Every priced line carries a printed reference (A, B, C…) — either the reference was missed, or this row is not an item.
4Nr.25,077.50100,310.00Error
Wardrobes; comprising 18mm thick MDF shelving and glass shutter; including MDF backing, carcass, frames, supports, front/side/back panels, doors, shelves, drawers, concealed light (measured separately), hardware, finishes, accessories and all ancillary works as necessary
Type 12; size 1750 x 625 x 3165mm high
ERRORNo item reference on 2 - Main/39. Every priced line carries a printed reference (A, B, C…) — either the reference was missed, or this row is not an item.
4Nr.8,690.0034,760.00Error
Allow for any other works which are not included above and which are required to complete the Woodwork in accordance with the Specification and the Drawings (Tenderer to list below):
REVIEW1 Item measured, but the source prints no rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
1Item0.00Needs review
Section 2/G · SECTION G - THERMAL AND MOISTURE PROTECTION · Page 2/G/1 - 2/G/5
0/2 clear
0.00 Σ lines
Aluminium foil faced thermal insulation; including accessories and all ancillary works as necessary
Type INS-101; 70mm thick
REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
m20.00Needs review
Allow for any other works which are not included above and which are required to complete the Thermal and Moisture Protection in accordance with the Specification and the Drawings (Tenderer to list below):
REVIEW1 Item measured, but the source prints no rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
1Item0.00Needs review
Section 2/H · SECTION H - DOORS AND WINDOWS · Page 2/H/1 - 2/H/17
0/1 clear
0.00 Σ lines
Allow for any other works which are not included above and which are required to complete the Doors and Windows in accordance with the Specification and the Drawings (Tenderer to list below):
REVIEW1 Item measured, but the source prints no rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
1Item0.00Needs review
Section 2/J · SECTION J - FINISHES · Page 2/J/1 - 2/J/18
0/6 clear
5,468,823.00 Σ lines4 errors
Powerfloating
Powerfloating
ERRORNo item reference on 2 - Main/73. Every priced line carries a printed reference (A, B, C…) — either the reference was missed, or this row is not an item.
69,231m275.005,192,325.00Error
Marble; laid on cement and sand screed (measured separately); including adhesive mortar, grout, joint and edge treatment sealer, accessories and all ancillary works as necessary
Type ST-108; 1200 x 600 x 20mm thick
ERRORNo item reference on 2 - Main/75. Every priced line carries a printed reference (A, B, C…) — either the reference was missed, or this row is not an item.
620m200.00124,000.00Error
Stone threshold; in polished granite; laid on cement and sand screed (measured separately); including adhesive mortar, grout, joint and edge treatment sealer, accessories and all ancillary works as necessary
Type FLH-281; to varying widths
ERRORNo item reference on 2 - Main/76. Every priced line carries a printed reference (A, B, C…) — either the reference was missed, or this row is not an item.
494m300.00148,200.00Error
Wallpaper finish; including adhesive, finishes, brackets, fixings, accessories and all ancillary works as necessary
Type WF-102; fixed on cement base and plaster finish (measured separately)
ERRORNo item reference on 2 - Main/80. Every priced line carries a printed reference (A, B, C…) — either the reference was missed, or this row is not an item.
14m2307.004,298.00Error
Monolithic gypsum board ceiling; including ceiling suspension system, shadows gaps, trims, corner protection profile, accessories and all ancillary works as necessary
Extra over for access panel; size 450 x 450mm
REVIEW1 Item measured, but the source prints no rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
1Item0.00Needs review
Allow for any other works which are not included above and which are required to complete the Finishes in accordance with the Specification and the Drawings (Tenderer to list below):
REVIEW1 Item measured, but the source prints no rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
1Item0.00Needs review
Section 2/K · SECTION K - ACCESSORIES · Page 2/K/1 - 2/K/14
0/13 clear
0.00 Σ lines
Common Areas
Type SAN-711; toilet paper holder
REVIEW9 Nr. measured, but the source prints no rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
9Nr.0.00Needs review
Internal Signage
Retail sign by others
REVIEWAmount column prints "By Others" — counted as 0.00 in the totals, exactly as the source's own page total does. Confirm this is intended (e.g. a RATE ONLY schedule).
6Nr.By OthersNeeds review
Kerbs; precast concrete fixed to floor slab; including fixings, finishes, accessories and all ancillary works as necessary
Type EXH-301; 100mm high
REVIEW2,969 m2 measured, but the source prints no rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
2,969m20.00Needs review
Kerbs; precast concrete fixed to floor slab; including fixings, finishes, accessories and all ancillary works as necessary
150mm high; to ramps
REVIEW609 m measured, but the source prints no rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
609m0.00Needs review
Shower and toilet glass partition; fixed glass with doors; frosted glass; 10mm thick; including ironmongery, fixings, accessories and all ancillary works as necessary
Extra over doors; overall size; 700mm x 2100mm high
REVIEWAmount column prints "Incl." — counted as 0.00 in the totals, exactly as the source's own page total does. Confirm this is intended (e.g. a RATE ONLY schedule).
12Nr.Incl.Needs review
Clear Glass
Type D07; shower glass partition; size 1190 x 2000mm high
REVIEW2 Nr. measured, but the source prints no rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
2Nr.0.00Needs review
Clear Glass
Type D07; shower glass partition; size 1240 x 2000mm high
REVIEW5 Nr. measured, but the source prints no rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
5Nr.0.00Needs review
Clear Glass
Type D07; shower glass partition; size 1460 x 2000mm high
REVIEW2 Nr. measured, but the source prints no rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
2Nr.0.00Needs review
Clear Glass
Type D07; shower glass partition; size 1600 x 2000mm high
REVIEW364 Nr. measured, but the source prints no rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
364Nr.0.00Needs review
Clear Glass
Type D07; shower glass partition; size 1800 x 2000mm high
REVIEW377 Nr. measured, but the source prints no rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
377Nr.0.00Needs review
Clear Glass
Extra over doors; overall size; 700mm x 2000mm high
REVIEWAmount column prints "Incl" — counted as 0.00 in the totals, exactly as the source's own page total does. Confirm this is intended (e.g. a RATE ONLY schedule).
1,041Nr.InclNeeds review
Fluted Tinted Glass
Extra over doors; overall size; 700mm x 2000mm high
REVIEWAmount column prints "Incl." — counted as 0.00 in the totals, exactly as the source's own page total does. Confirm this is intended (e.g. a RATE ONLY schedule).
1,754Nr.Incl.Needs review
Allow for any other works which are not included above and which are required to complete the Accessories in accordance with the Specification and the Drawings (Tenderer to list below):
REVIEW1 Item measured, but the source prints no rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
1Item0.00Needs review
Section 2/L · SECTION L - EQUIPMENT · Page 2/L/1 - 2/L/7
0/41 clear
0.00 Σ lines
White goods; including accessories and all ancillary works as necessary
Type WG-111; freestanding cooker
REVIEW30 Nr. measured, but the source prints no rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
30Nr.0.00Needs review
White goods; including accessories and all ancillary works as necessary
Type WG-112; freestanding fridge
REVIEW30 Nr. measured, but the source prints no rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
30Nr.0.00Needs review
White goods; including accessories and all ancillary works as necessary
Type WG-113; freestanding freezer
REVIEW30 Nr. measured, but the source prints no rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
30Nr.0.00Needs review
White goods; including accessories and all ancillary works as necessary
Type WG-114; freestanding dishwasher
REVIEW30 Nr. measured, but the source prints no rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
30Nr.0.00Needs review
White goods; including accessories and all ancillary works as necessary
Type WG-116; coffee machine
REVIEW3 Nr. measured, but the source prints no rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
3Nr.0.00Needs review
White goods; including accessories and all ancillary works as necessary
Type WG-117; tv screen
REVIEW2 Nr. measured, but the source prints no rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
2Nr.0.00Needs review
White goods; including accessories and all ancillary works as necessary
Type WG-118; tv screen
REVIEW5 Nr. measured, but the source prints no rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
5Nr.0.00Needs review
White goods; including accessories and all ancillary works as necessary
Type WG-119; water dispenser
REVIEW8 Nr. measured, but the source prints no rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
8Nr.0.00Needs review
White goods; including accessories and all ancillary works as necessary
Type WG-120; tv screen
REVIEW2 Nr. measured, but the source prints no rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
2Nr.0.00Needs review
Supply and installation by Others: Contractor to allow for Co-ordination, attendance and builders work
Type EQ-101; run 19" excite live
REVIEW7 Nr. measured, but the source prints no rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
7Nr.0.00Needs review
Supply and installation by Others: Contractor to allow for Co-ordination, attendance and builders work
Type EQ-102; climb 16" excite live
REVIEW3 Nr. measured, but the source prints no rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
3Nr.0.00Needs review
Supply and installation by Others: Contractor to allow for Co-ordination, attendance and builders work
Type EQ-103; synchro ar 16" excite live
REVIEW3 Nr. measured, but the source prints no rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
3Nr.0.00Needs review
Supply and installation by Others: Contractor to allow for Co-ordination, attendance and builders work
Type EQ-104; technogym bike
REVIEW3 Nr. measured, but the source prints no rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
3Nr.0.00Needs review
Supply and installation by Others: Contractor to allow for Co-ordination, attendance and builders work
Type EQ-105; skillrow
REVIEW3 Nr. measured, but the source prints no rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
3Nr.0.00Needs review
Supply and installation by Others: Contractor to allow for Co-ordination, attendance and builders work
Type EQ-106; lower back fitness bench
REVIEW2 Nr. measured, but the source prints no rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
2Nr.0.00Needs review
Supply and installation by Others: Contractor to allow for Co-ordination, attendance and builders work
Type EQ-107; yoga mat
REVIEW9 Nr. measured, but the source prints no rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
9Nr.0.00Needs review
Supply and installation by Others: Contractor to allow for Co-ordination, attendance and builders work
Type EQ-108; crunch bench press
REVIEW3 Nr. measured, but the source prints no rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
3Nr.0.00Needs review
Supply and installation by Others: Contractor to allow for Co-ordination, attendance and builders work
Type EQ-109; multi-power
REVIEW3 Nr. measured, but the source prints no rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
3Nr.0.00Needs review
Supply and installation by Others: Contractor to allow for Co-ordination, attendance and builders work
Type EQ-110; adjustable bench
REVIEW5 Nr. measured, but the source prints no rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
5Nr.0.00Needs review
Supply and installation by Others: Contractor to allow for Co-ordination, attendance and builders work
Type EQ-111; two tier dumbbell rack
REVIEW3 Nr. measured, but the source prints no rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
3Nr.0.00Needs review
Supply and installation by Others: Contractor to allow for Co-ordination, attendance and builders work
Type EQ-112; dumbbells (10 pairs)
REVIEW3 Nr. measured, but the source prints no rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
3Nr.0.00Needs review
Supply and installation by Others: Contractor to allow for Co-ordination, attendance and builders work
Type EQ-113; dual leg curl/leg extension selection 700
REVIEW3 Nr. measured, but the source prints no rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
3Nr.0.00Needs review
Supply and installation by Others: Contractor to allow for Co-ordination, attendance and builders work
Type EQ-114; lat machine selection 700
REVIEW3 Nr. measured, but the source prints no rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
3Nr.0.00Needs review
Supply and installation by Others: Contractor to allow for Co-ordination, attendance and builders work
Type EQ-115; shoulder press-selection 700
REVIEW3 Nr. measured, but the source prints no rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
3Nr.0.00Needs review
Supply and installation by Others: Contractor to allow for Co-ordination, attendance and builders work
Type EQ-116; chest press-selection 700
REVIEW3 Nr. measured, but the source prints no rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
3Nr.0.00Needs review
Supply and installation by Others: Contractor to allow for Co-ordination, attendance and builders work
Type EQ-117; skill tools storage
REVIEW3 Nr. measured, but the source prints no rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
3Nr.0.00Needs review
Supply and installation by Others: Contractor to allow for Co-ordination, attendance and builders work
Type EQ-118; universe wall 2 virtual
REVIEW3 Nr. measured, but the source prints no rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
3Nr.0.00Needs review
Supply and installation by Others: Contractor to allow for Co-ordination, attendance and builders work
Type EQ-119; vario 16" excite live
REVIEW1 Nr. measured, but the source prints no rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
1Nr.0.00Needs review
Supply and installation by Others: Contractor to allow for Co-ordination, attendance and builders work
Type EQ-120; skill up
REVIEW1 Nr. measured, but the source prints no rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
1Nr.0.00Needs review
Supply and installation by Others: Contractor to allow for Co-ordination, attendance and builders work
Type EQ-121; skillmill
REVIEW1 Nr. measured, but the source prints no rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
1Nr.0.00Needs review
Supply and installation by Others: Contractor to allow for Co-ordination, attendance and builders work
Type EQ-122; skillrun unity 7000
REVIEW1 Nr. measured, but the source prints no rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
1Nr.0.00Needs review
Supply and installation by Others: Contractor to allow for Co-ordination, attendance and builders work
Type EQ-123; plyobox
REVIEW1 Nr. measured, but the source prints no rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
1Nr.0.00Needs review
Supply and installation by Others: Contractor to allow for Co-ordination, attendance and builders work
Type EQ-124; punching bag
REVIEW1 Nr. measured, but the source prints no rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
1Nr.0.00Needs review
Supply and installation by Others: Contractor to allow for Co-ordination, attendance and builders work
Type EQ-125; leg press selection 700
REVIEW1 Nr. measured, but the source prints no rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
1Nr.0.00Needs review
Allow to detent pin BMU restraints; including painted restraint socket, fixings, brackets, accessories and all ancillary works as necessary
To tower 1
REVIEWAmount column prints "Included" — counted as 0.00 in the totals, exactly as the source's own page total does. Confirm this is intended (e.g. a RATE ONLY schedule).
1ItemIncludedNeeds review
Allow to detent pin BMU restraints; including painted restraint socket, fixings, brackets, accessories and all ancillary works as necessary
To tower 2
REVIEWAmount column prints "Included" — counted as 0.00 in the totals, exactly as the source's own page total does. Confirm this is intended (e.g. a RATE ONLY schedule).
1ItemIncludedNeeds review
Allow to detent pin BMU restraints; including painted restraint socket, fixings, brackets, accessories and all ancillary works as necessary
To tower 3
REVIEWAmount column prints "Included" — counted as 0.00 in the totals, exactly as the source's own page total does. Confirm this is intended (e.g. a RATE ONLY schedule).
1ItemIncludedNeeds review
Allow to detent pin BMU restraints; including painted restraint socket, fixings, brackets, accessories and all ancillary works as necessary
To tower 4
REVIEWAmount column prints "Included" — counted as 0.00 in the totals, exactly as the source's own page total does. Confirm this is intended (e.g. a RATE ONLY schedule).
1ItemIncludedNeeds review
Allow to detent pin BMU restraints; including painted restraint socket, fixings, brackets, accessories and all ancillary works as necessary
Allow to mobile elevated work platform (MEWP) including accessories and all ancillary works as necessary
REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
Item0.00Needs review
Allow to detent pin BMU restraints; including painted restraint socket, fixings, brackets, accessories and all ancillary works as necessary
Allow to panel transport trolley including accessories and all ancillary works as necessary
REVIEW1 Item measured, but the source prints no rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
1Item0.00Needs review
Allow for any other works which are not included above and which are required to complete the Equipment in accordance with the Specification and the Drawings (Tenderer to list below):
REVIEW1 Item measured, but the source prints no rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
1Item0.00Needs review
Section 2/M · SECTION M - FURNISHING · Page 2/M/1 - 2/M/7
0/101 clear
0.00 Σ lines
Case goods; including accessories and all ancillary works as necessary
Type CG-101; coffee table
REVIEW4 Nr. measured, but the source prints no rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
4Nr.0.00Needs review
Case goods; including accessories and all ancillary works as necessary
Type CG-102; side table
REVIEW6 Nr. measured, but the source prints no rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
6Nr.0.00Needs review
Case goods; including accessories and all ancillary works as necessary
Type CG-103; side table
REVIEW4 Nr. measured, but the source prints no rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
4Nr.0.00Needs review
Case goods; including accessories and all ancillary works as necessary
Type CG-104; console behind sofa
REVIEW4 Nr. measured, but the source prints no rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
4Nr.0.00Needs review
Case goods; including accessories and all ancillary works as necessary
Type CG-105; console
REVIEW6 Nr. measured, but the source prints no rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
6Nr.0.00Needs review
Case goods; including accessories and all ancillary works as necessary
Type CG-106; side table
REVIEW6 Nr. measured, but the source prints no rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
6Nr.0.00Needs review
Case goods; including accessories and all ancillary works as necessary
Type CG-107; table
REVIEW4 Nr. measured, but the source prints no rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
4Nr.0.00Needs review
Case goods; including accessories and all ancillary works as necessary
Type CG-108; console
REVIEW2 Nr. measured, but the source prints no rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
2Nr.0.00Needs review
Case goods; including accessories and all ancillary works as necessary
Type CG-109; coffee table
REVIEW1 Nr. measured, but the source prints no rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
1Nr.0.00Needs review
Case goods; including accessories and all ancillary works as necessary
Type CG-110; side table vintage bronze
REVIEW8 Nr. measured, but the source prints no rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
8Nr.0.00Needs review
Case goods; including accessories and all ancillary works as necessary
Type CG-111; side table
REVIEW4 Nr. measured, but the source prints no rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
4Nr.0.00Needs review
Case goods; including accessories and all ancillary works as necessary
Type CG-112; side table
REVIEW5 Nr. measured, but the source prints no rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
5Nr.0.00Needs review
Case goods; including accessories and all ancillary works as necessary
Type CG-113; communal table travertine
REVIEW1 Nr. measured, but the source prints no rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
1Nr.0.00Needs review
Case goods; including accessories and all ancillary works as necessary
Type CG-114; coffee table
REVIEW1 Nr. measured, but the source prints no rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
1Nr.0.00Needs review
Case goods; including accessories and all ancillary works as necessary
Type CG-115; coffee table
REVIEW1 Nr. measured, but the source prints no rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
1Nr.0.00Needs review
Case goods; including accessories and all ancillary works as necessary
Type CG-116; armchairs side table
REVIEW1 Nr. measured, but the source prints no rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
1Nr.0.00Needs review
Case goods; including accessories and all ancillary works as necessary
Type CG-117; sofa side table
REVIEW2 Nr. measured, but the source prints no rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
2Nr.0.00Needs review
Case goods; including accessories and all ancillary works as necessary
Type CG-118; coffee table
REVIEW4 Nr. measured, but the source prints no rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
4Nr.0.00Needs review
Case goods; including accessories and all ancillary works as necessary
Type CG-119; coffee table
REVIEW8 Nr. measured, but the source prints no rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
8Nr.0.00Needs review
Case goods; including accessories and all ancillary works as necessary
Type CG-120; dining table
REVIEW2 Nr. measured, but the source prints no rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
2Nr.0.00Needs review
Case goods; including accessories and all ancillary works as necessary
Type CG-121; console
REVIEW2 Nr. measured, but the source prints no rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
2Nr.0.00Needs review
Case goods; including accessories and all ancillary works as necessary
Type CG-122; gaming area side table
REVIEW12 Nr. measured, but the source prints no rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
12Nr.0.00Needs review
Case goods; including accessories and all ancillary works as necessary
Type CG-123; kids table
REVIEW4 Nr. measured, but the source prints no rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
4Nr.0.00Needs review
Case goods; including accessories and all ancillary works as necessary
Type CG-124; pool table
REVIEW1 Nr. measured, but the source prints no rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
1Nr.0.00Needs review
Case goods; including accessories and all ancillary works as necessary
Type CG-125; foosball table
REVIEW1 Nr. measured, but the source prints no rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
1Nr.0.00Needs review
Case goods; including accessories and all ancillary works as necessary
Type CG-126; shower bench
REVIEW4 Nr. measured, but the source prints no rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
4Nr.0.00Needs review
Loose rugs; including accessories and all ancillary works as necessary
Type LR-101; seating area loose rug
REVIEW4 Nr. measured, but the source prints no rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
4Nr.0.00Needs review
Loose rugs; including accessories and all ancillary works as necessary
Type LR-102; big table loose rug
REVIEW4 Nr. measured, but the source prints no rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
4Nr.0.00Needs review
Loose rugs; including accessories and all ancillary works as necessary
Type LR-103; rectangular loose rug
REVIEW5 Nr. measured, but the source prints no rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
5Nr.0.00Needs review
Loose rugs; including accessories and all ancillary works as necessary
Type LR-104; rectangular loose rug
REVIEW1 Nr. measured, but the source prints no rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
1Nr.0.00Needs review
Loose rugs; including accessories and all ancillary works as necessary
Type LR-105; loose rug
REVIEW2 Nr. measured, but the source prints no rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
2Nr.0.00Needs review
Loose rugs; including accessories and all ancillary works as necessary
Type LR-106; loose rug
REVIEW2 Nr. measured, but the source prints no rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
2Nr.0.00Needs review
Loose rugs; including accessories and all ancillary works as necessary
Type LR-107; loose rug
REVIEW2 Nr. measured, but the source prints no rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
2Nr.0.00Needs review
Miscellaneous; including accessories and all ancillary works as necessary
Type MI-101; sheer curtains
REVIEW8 Nr. measured, but the source prints no rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
8Nr.0.00Needs review
Miscellaneous; including accessories and all ancillary works as necessary
Type MI-102; plant pots
REVIEW10 Nr. measured, but the source prints no rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
10Nr.0.00Needs review
Miscellaneous; including accessories and all ancillary works as necessary
Type MI-103; lift lobby entrance
REVIEW4 Nr. measured, but the source prints no rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
4Nr.0.00Needs review
Miscellaneous; including accessories and all ancillary works as necessary
Type MI-104; artwork behind sofa
REVIEW2 Nr. measured, but the source prints no rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
2Nr.0.00Needs review
Miscellaneous; including accessories and all ancillary works as necessary
Type MI-105; artwork above console- hand painted art painting
REVIEW4 Nr. measured, but the source prints no rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
4Nr.0.00Needs review
Miscellaneous; including accessories and all ancillary works as necessary
Type MI-106; artwork at table area
REVIEW2 Nr. measured, but the source prints no rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
2Nr.0.00Needs review
Miscellaneous; including accessories and all ancillary works as necessary
Type MI-107; artwork
REVIEW4 Nr. measured, but the source prints no rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
4Nr.0.00Needs review
Miscellaneous; including accessories and all ancillary works as necessary
Type MI-108; entrance lobby corridor artwork
REVIEW8 Nr. measured, but the source prints no rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
8Nr.0.00Needs review
Miscellaneous; including accessories and all ancillary works as necessary
Type MI-109; roller blinds
REVIEW37 m measured, but the source prints no rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
37m0.00Needs review
Miscellaneous; including accessories and all ancillary works as necessary
Type MI-110; accessories
REVIEW2 Nr. measured, but the source prints no rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
2Nr.0.00Needs review
Miscellaneous; including accessories and all ancillary works as necessary
Type MI-111; artwork
REVIEW215 Nr. measured, but the source prints no rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
215Nr.0.00Needs review
Miscellaneous; including accessories and all ancillary works as necessary
Type MI-112; artwork
REVIEW870 Nr. measured, but the source prints no rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
870Nr.0.00Needs review
Miscellaneous; including accessories and all ancillary works as necessary
Type MI-113; curtains manual
REVIEW30 m measured, but the source prints no rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
30m0.00Needs review
Miscellaneous; including accessories and all ancillary works as necessary
Type MI-114; plant pots
REVIEW6 Nr. measured, but the source prints no rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
6Nr.0.00Needs review
Miscellaneous; including accessories and all ancillary works as necessary
Type MI-115; sheer curtains-seating area and table area only (deleted)
REVIEW4 Nr. measured, but the source prints no rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
4Nr.0.00Needs review
Miscellaneous; including accessories and all ancillary works as necessary
Type MI-116; plant pots
REVIEW14 Nr. measured, but the source prints no rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
14Nr.0.00Needs review
Miscellaneous; including accessories and all ancillary works as necessary
Type MI-117; artwork
REVIEW4 Nr. measured, but the source prints no rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
4Nr.0.00Needs review
Miscellaneous; including accessories and all ancillary works as necessary
Type MI-118; artwork
REVIEW2 Nr. measured, but the source prints no rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
2Nr.0.00Needs review
Miscellaneous; including accessories and all ancillary works as necessary
Type MI-119; artwork
REVIEW2 Nr. measured, but the source prints no rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
2Nr.0.00Needs review
Miscellaneous; including accessories and all ancillary works as necessary
Type MI-120; artwork
REVIEW2 Nr. measured, but the source prints no rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
2Nr.0.00Needs review
Miscellaneous; including accessories and all ancillary works as necessary
Type MI-121; artwork
REVIEW4 Nr. measured, but the source prints no rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
4Nr.0.00Needs review
Miscellaneous; including accessories and all ancillary works as necessary
Type MI-122; artwork
REVIEW4 Nr. measured, but the source prints no rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification.
4Nr.0.00Needs review
loading more… 150 of 534 lines rendered

What the bidder did with the line

Read from the source. Every line sits in exactly one of these.
StateLinesMeasuredMoney
PricedA rate in the source and money in the amount.6,9427,680,890.992,169,047,863.06
UnpricedNo rate given, nothing carried into the totals.36392,770.88
Prints words, not a figure“By Others”, “Included” — counted as nil, as the bidder's own page total does.1616,735
Priced as a wholeMoney on the line with no rate behind it — a lump or provisional sum.1521436,866,589.58

Where your review stands

Your review of those same lines — a line can be in more than one.
StateLinesMeasuredMoney
Still openCarries a question nobody has answered yet.534170,741.8818,033,193.25
ConfirmedYou checked it; the finding stands and left the queue.0
RuledA recorded determination answers it — reversible at any time.0
Does not reconcileAn error on the line itself, not on its block.870,40617,501,743.25

Collection blocks

Σ of each block’s line amounts against the total the source itself prints.
BlockSectionLinesΣ linesSource printsTies
GR1/130.00313,190,338.58
GR1/290.000.00
GR1/310.000.00
GR1/450.000.00
GR1/570.000.00
GR1/6160.000.00
GR1/7110.000.00
GR1/840.000.00
GR1/9120.000.00
GR1/1090.000.00
GR1/1130.000.00
GR1/12140.000.00
GR1/13180.000.00
GR1/1420.000.00
GR1/1510.000.00
2 - Main/1SITE PREPARATION61,528,566.001,528,566.00
2 - Main/2BORED PILING61,745,280.001,745,280.00
2 - Main/3GENERALLY10.000.00
2 - Main/4POURED CONCRETE1918,015,000.0018,015,000.00
2 - Main/5POURED CONCRETE2538,937,000.0038,937,000.00
2 - Main/6POURED CONCRETE2348,192,600.0048,192,600.00
2 - Main/7POURED CONCRETE12455,700.00455,700.00
2 - Main/8REINFORCEMENT22201,742,608.00201,742,608.00
2 - Main/9REINFORCEMENT61,294,933.001,294,933.00
2 - Main/10SHUTTERING2078,131,625.0078,131,625.00
2 - Main/11SHUTTERING41,865,920.001,865,920.00
2 - Main/12PRESTRESSED CONCRETE14104,349,826.00104,349,826.00
2 - Main/13SUNDRIES62,986,640.002,986,640.00
2 - Main/14GENERALLY10.000.00
2 - Main/15WALL AND PIERS1137,136,250.0037,136,250.00
2 - Main/16SUNDRIES40.000.00
2 - Main/17GENERALLY10.000.00
2 - Main/18STRUCTURAL METALWORK192,664,900.002,664,900.00
2 - Main/19STRUCTURAL METALWORK61,736,100.001,736,100.00
2 - Main/20NON-STRUCTURAL METALWORK597,474,280.0097,474,280.00
2 - Main/21NON-STRUCTURAL METALWORK147,698,304.887,698,304.88
2 - Main/22NON-STRUCTURAL METALWORK1655,242,074.7455,242,074.74
2 - Main/23NON-STRUCTURAL METALWORK2046,637,835.4846,637,835.48
2 - Main/24NON-STRUCTURAL METALWORK1553,452,110.7153,452,110.71
2 - Main/25NON-STRUCTURAL METALWORK125,762,220.005,762,220.00
2 - Main/26NON-STRUCTURAL METALWORK13486,770.00486,770.00
2 - Main/27NON-STRUCTURAL METALWORK143,994,290.003,994,290.00
2 - Main/28GENERALLY10.000.00
2 - Main/29COMPOSITE ITEMS123,223,025.003,223,025.00
2 - Main/30COMPOSITE ITEMS141,725,175.001,725,175.00
2 - Main/31COMPOSITE ITEMS15737,912.50737,912.50
2 - Main/32COMPOSITE ITEMS204,045,325.004,045,325.00
2 - Main/33COMPOSITE ITEMS171,862,337.501,862,337.50
2 - Main/34COMPOSITE ITEMS183,770,862.503,770,862.50
2 - Main/35COMPOSITE ITEMS182,867,356.002,867,356.00
2 - Main/36COMPOSITE ITEMS202,058,002.002,058,002.00
2 - Main/37COMPOSITE ITEMS1721,341,525.0021,341,525.00
2 - Main/38COMPOSITE ITEMS1615,432,625.0015,432,625.00
2 - Main/39COMPOSITE ITEMS111,554,945.001,554,945.00
2 - Main/40COMPOSITE ITEMS1620,338,080.0020,338,080.00
2 - Main/41COMPOSITE ITEMS2128,454,535.0028,454,535.00
2 - Main/42COMPOSITE ITEMS186,959,340.006,959,340.00
2 - Main/43COMPOSITE ITEMS191,196,970.001,196,970.00
2 - Main/44COMPOSITE ITEMS17526,808.72526,808.72
2 - Main/45COMPOSITE ITEMS131,348,175.211,348,175.21
2 - Main/46COMPOSITE ITEMS1559,190.0059,190.00
2 - Main/47COMPOSITE ITEMS12217,100.00217,100.00
2 - Main/48COMPOSITE ITEMS14351,001.20351,001.20
2 - Main/49COMPOSITE ITEMS91,457,360.001,457,360.00
2 - Main/50COMPOSITE ITEMS141,526,080.001,526,080.00
2 - Main/51COMPOSITE ITEMS13762,430.00762,430.00
2 - Main/52GENERALLY10.000.00
2 - Main/53COVERS AND LININGS916,074,270.6616,074,270.66
2 - Main/54DAMP-PROOF COURSES84,575,633.004,575,633.00
2 - Main/55INSULATION714,121,191.9314,121,191.93
2 - Main/56GENERALLY10.000.00
2 - Main/57DOORS1334,807,871.0034,807,871.00
2 - Main/58DOORS166,467,176.006,467,176.00
2 - Main/59DOORS169,467,420.009,467,420.00
2 - Main/60DOORS201,765,530.001,765,530.00
2 - Main/61SCREENS161,660,330.001,660,330.00
2 - Main/62EXTERNAL DOORS12223,330.00223,330.00
2 - Main/63EXTERNAL DOORS121,234,650.001,234,650.00
2 - Main/64SCREENS2183,332,190.0083,332,190.00
2 - Main/65SCREENS182,595,930.002,595,930.00
2 - Main/66SCREENS1812,146,200.0012,146,200.00
2 - Main/67SCREENS131,414,780.001,414,780.00
2 - Main/68SCREENS1534,480,750.0034,480,750.00
2 - Main/69LOUVERS145,531,370.005,531,370.00
2 - Main/70IRONMONGERY211,395,312.001,395,312.00
2 - Main/71IRONMONGERY14195,800.00195,800.00
2 - Main/72GENERALLY10.000.00
2 - Main/73BACKGROUNDS1837,474,583.2337,474,583.23
2 - Main/74BACKGROUNDS93,658,864.823,658,864.82
2 - Main/75FLOOR FINISHES15131,853,537.53131,853,537.53
2 - Main/76FLOOR FINISHES152,895,974.502,895,974.50
2 - Main/77FLOOR FINISHES91,057,887.001,057,887.00
2 - Main/78FLOOR FINISHES916,486,093.0816,486,093.08
2 - Main/79WALL FINISHES1419,878,765.6819,878,765.68
2 - Main/80WALL FINISHES1415,269,702.0615,269,702.06
2 - Main/81CEILING FINISHES101,904,158.611,904,158.61
2 - Main/82SUNDRIES101,706,965.001,706,965.00
2 - Main/83SUSPENDED CEILING1610,253,430.6210,253,430.62
2 - Main/84SUSPENDED CEILING165,380,804.405,380,804.40
2 - Main/85SUSPENDED CEILING182,317,366.102,317,366.10
2 - Main/86DECORATIONS1321,128,077.0221,128,077.02
2 - Main/87DECORATIONS1815,921,959.8515,921,959.85
2 - Main/88SIGNWRITING161,694,510.001,694,510.00
2 - Main/89GENERALLY10.000.00
2 - Main/90TOILET ACCESSORIES20116,340.14116,340.14
2 - Main/91TOILET ACCESSORIES213,593,625.043,593,625.04
2 - Main/92KIDS PLAY AREA141,006,438.041,006,438.04
2 - Main/93SIGNAGE AND WAYFINDING201,971,170.001,971,170.00
2 - Main/94SIGNAGE AND WAYFINDING222,274,534.502,274,534.50
2 - Main/95PARKING ACCESSORIES141,144,474.031,144,474.03
2 - Main/96PARKING ACCESSORIES4621,910.00621,910.00
2 - Main/97PARTITIONS1519,434,546.9519,434,546.95
2 - Main/98PARTITIONS126,064,629.986,064,629.98
2 - Main/99TOILET PARTITION202,825,712.502,825,712.50
2 - Main/100TOILET PARTITION165,972,835.005,972,835.00
2 - Main/101WASTE CHUTES102,562,420.002,562,420.00
2 - Main/102GENERALLY10.000.00
2 - Main/103WHITE GOODS1824,242,209.1324,242,209.13
2 - Main/104GYM EQUIPMENT250.000.00
2 - Main/105BUILDING MANAGEMENT UNIT (BMU)310,366,000.0010,366,000.00
2 - Main/106BUILDING MANAGEMENT UNIT (BMU)81,671,800.001,671,800.00
2 - Main/107BUILDING MANAGEMENT UNIT (BMU)8125,000.00125,000.00
2 - Main/108GENERALLY10.000.00
2 - Main/109LOOSE FF&E220.000.00
2 - Main/110LOOSE FF&E210.000.00
2 - Main/111LOOSE FF&E240.000.00
2 - Main/112LOOSE FF&E200.000.00
2 - Main/113LOOSE FF&E15324,125.00324,125.00
2 - Main/114GENERALLY10.000.00
2 - Main/115LIFTS8425,624.00425,624.00
2 - Main/116LIFTS822,441,600.0022,441,600.00
2 - Main/117LIFTS625,900,000.0025,900,000.00
2 - Main/118LIFTS23,700,000.003,700,000.00
2 - Main/119SUNDRIES40.000.00
2 - Main/120BWIC60.000.00
2 - Main/121GENERALLY10.000.00
2 - Main/122SANITARY FIXTURES & FITTINGS161,884,867.451,884,867.45
2 - Main/123SANITARY FIXTURES & FITTINGS169,367,476.559,367,476.55
2 - Main/124SANITARY FIXTURES & FITTINGS152,048,385.652,048,385.65
2 - Main/125SANITARY FIXTURES & FITTINGS121,884,711.231,884,711.23
2 - Main/126SANITARY FIXTURES & FITTINGS80.000.00
2 - Main/127DRAINAGE INSTALLATION189,485,313.809,485,313.80
2 - Main/128DRAINAGE INSTALLATION162,260,215.402,260,215.40
2 - Main/129DRAINAGE INSTALLATION91,416,861.001,416,861.00
2 - Main/130DRAINAGE INSTALLATION181,319,696.001,319,696.00
2 - Main/131DRAINAGE INSTALLATION1517,135,700.0017,135,700.00
2 - Main/132DRAINAGE INSTALLATION174,801,993.004,801,993.00
2 - Main/133DRAINAGE INSTALLATION151,214,678.001,214,678.00
2 - Main/134DRAINAGE INSTALLATION1043,470.0043,470.00
2 - Main/135DRAINAGE INSTALLATION1045,500.0045,500.00
2 - Main/136DRAINAGE INSTALLATION11144,000.00144,000.00
2 - Main/137DRAINAGE INSTALLATION226,000.0026,000.00
2 - Main/138WATER INSTALLATION1910,734,885.0010,734,885.00
2 - Main/139WATER INSTALLATION152,052,310.002,052,310.00
2 - Main/140WATER INSTALLATION122,298,635.002,298,635.00
2 - Main/141WATER INSTALLATION18641,325.00641,325.00
2 - Main/142WATER INSTALLATION16172,985.00172,985.00
2 - Main/143WATER INSTALLATION152,870,070.002,870,070.00
2 - Main/144WATER INSTALLATION92,673,050.002,673,050.00
2 - Main/145WATER INSTALLATION8579,000.00579,000.00
2 - Main/146WATER INSTALLATION8139,200.00139,200.00
2 - Main/147WATER INSTALLATION525,000.0025,000.00
2 - Main/148FIRE PROTECTION SYSTEM59,159,495.009,159,495.00
2 - Main/149FIRE PROTECTION SYSTEM1714,462,195.0014,462,195.00
2 - Main/150FIRE PROTECTION SYSTEM214,758,180.004,758,180.00
2 - Main/151FIRE PROTECTION SYSTEM112,037,230.002,037,230.00
2 - Main/152FIRE PROTECTION SYSTEM76,716,400.006,716,400.00
2 - Main/153FIRE PROTECTION SYSTEM101,718,000.001,718,000.00
2 - Main/154FIRE PROTECTION SYSTEM9663,400.00663,400.00
2 - Main/155FIRE PROTECTION SYSTEM102,964,600.002,964,600.00
2 - Main/156FIRE PROTECTION SYSTEM5131,000.00131,000.00
2 - Main/157HVAC INSTALLATION1618,712,210.0018,712,210.00
2 - Main/158HVAC INSTALLATION163,561,309.003,561,309.00
2 - Main/159HVAC INSTALLATION181,277,319.801,277,319.80
2 - Main/160HVAC INSTALLATION138,433,075.008,433,075.00
2 - Main/161HVAC INSTALLATION71,974,355.001,974,355.00
2 - Main/162HVAC INSTALLATION73,227,448.003,227,448.00
2 - Main/163HVAC INSTALLATION13396,000.00396,000.00
2 - Main/164HVAC INSTALLATION912,179,485.0012,179,485.00
2 - Main/165HVAC INSTALLATION22101,310.00101,310.00
2 - Main/166HVAC INSTALLATION21134,775.00134,775.00
2 - Main/167HVAC INSTALLATION21597,816.00597,816.00
2 - Main/168HVAC INSTALLATION22280,686.00280,686.00
2 - Main/169HVAC INSTALLATION17119,010.00119,010.00
2 - Main/170HVAC INSTALLATION21472,370.00472,370.00
2 - Main/171HVAC INSTALLATION2259,350.0059,350.00
2 - Main/172HVAC INSTALLATION20167,595.00167,595.00
2 - Main/173HVAC INSTALLATION22456,850.00456,850.00
2 - Main/174HVAC INSTALLATION2244,230.0044,230.00
2 - Main/175HVAC INSTALLATION15678,630.00678,630.00
2 - Main/176HVAC INSTALLATION21761,850.00761,850.00
2 - Main/177HVAC INSTALLATION20704,990.00704,990.00
2 - Main/178HVAC INSTALLATION14535,065.00535,065.00
2 - Main/179HVAC INSTALLATION1486,920.0086,920.00
2 - Main/180HVAC INSTALLATION14102,220.00102,220.00
2 - Main/181HVAC INSTALLATION1466,940.0066,940.00
2 - Main/182HVAC INSTALLATION1476,830.0076,830.00
2 - Main/183HVAC INSTALLATION1472,090.0072,090.00
2 - Main/184HVAC INSTALLATION14672,170.00672,170.00
2 - Main/185HVAC INSTALLATION141,440,480.001,440,480.00
2 - Main/186HVAC INSTALLATION14361,400.00361,400.00
2 - Main/187HVAC INSTALLATION1467,150.0067,150.00
2 - Main/188HVAC INSTALLATION1462,640.0062,640.00
2 - Main/189HVAC INSTALLATION1463,750.0063,750.00
2 - Main/190HVAC INSTALLATION14825,630.00825,630.00
2 - Main/191HVAC INSTALLATION14980,600.00980,600.00
2 - Main/192HVAC INSTALLATION1465,740.0065,740.00
2 - Main/193HVAC INSTALLATION14250,900.00250,900.00
2 - Main/194HVAC INSTALLATION14200,200.00200,200.00
2 - Main/195HVAC INSTALLATION1486,540.0086,540.00
2 - Main/196HVAC INSTALLATION14154,890.00154,890.00
2 - Main/197HVAC INSTALLATION1463,200.0063,200.00
2 - Main/198HVAC INSTALLATION1474,390.0074,390.00
2 - Main/199HVAC INSTALLATION1486,140.0086,140.00
2 - Main/200HVAC INSTALLATION1489,970.0089,970.00
2 - Main/201HVAC INSTALLATION141,306,480.001,306,480.00
2 - Main/202HVAC INSTALLATION141,280,720.001,280,720.00
2 - Main/203HVAC INSTALLATION1462,870.0062,870.00
2 - Main/204HVAC INSTALLATION1462,870.0062,870.00
2 - Main/205HVAC INSTALLATION1468,590.0068,590.00
2 - Main/206HVAC INSTALLATION1471,830.0071,830.00
2 - Main/207HVAC INSTALLATION14960,320.00960,320.00
2 - Main/208HVAC INSTALLATION14632,170.00632,170.00
2 - Main/209HVAC INSTALLATION1462,550.0062,550.00
2 - Main/210HVAC INSTALLATION1457,260.0057,260.00
2 - Main/211HVAC INSTALLATION1477,080.0077,080.00
2 - Main/212HVAC INSTALLATION1479,470.0079,470.00
2 - Main/213HVAC INSTALLATION1467,580.0067,580.00
2 - Main/214HVAC INSTALLATION1461,880.0061,880.00
2 - Main/215HVAC INSTALLATION1470,990.0070,990.00
2 - Main/216HVAC INSTALLATION1470,030.0070,030.00
2 - Main/217HVAC INSTALLATION1479,230.0079,230.00
2 - Main/218HVAC INSTALLATION1477,260.0077,260.00
2 - Main/219HVAC INSTALLATION1486,060.0086,060.00
2 - Main/220HVAC INSTALLATION1493,220.0093,220.00
2 - Main/221HVAC INSTALLATION14421,340.00421,340.00
2 - Main/222HVAC INSTALLATION1487,690.0087,690.00
2 - Main/223HVAC INSTALLATION1462,870.0062,870.00
2 - Main/224HVAC INSTALLATION1467,250.0067,250.00
2 - Main/225HVAC INSTALLATION1491,200.0091,200.00
2 - Main/226HVAC INSTALLATION1464,400.0064,400.00
2 - Main/227HVAC INSTALLATION141,283,160.001,283,160.00
2 - Main/228HVAC INSTALLATION141,082,840.001,082,840.00
2 - Main/229HVAC INSTALLATION1463,650.0063,650.00
2 - Main/230HVAC INSTALLATION1456,710.0056,710.00
2 - Main/231HVAC INSTALLATION1464,080.0064,080.00
2 - Main/232HVAC INSTALLATION1454,320.0054,320.00
2 - Main/233HVAC INSTALLATION141,021,950.001,021,950.00
2 - Main/234HVAC INSTALLATION141,458,670.001,458,670.00
2 - Main/235HVAC INSTALLATION14111,060.00111,060.00
2 - Main/236HVAC INSTALLATION1457,260.0057,260.00
2 - Main/237HVAC INSTALLATION1469,470.0069,470.00
2 - Main/238HVAC INSTALLATION1466,140.0066,140.00
2 - Main/239HVAC INSTALLATION14104,370.00104,370.00
2 - Main/240HVAC INSTALLATION1470,780.0070,780.00
2 - Main/241HVAC INSTALLATION1479,130.0079,130.00
2 - Main/242HVAC INSTALLATION1476,050.0076,050.00
2 - Main/243HVAC INSTALLATION1482,150.0082,150.00
2 - Main/244HVAC INSTALLATION1469,360.0069,360.00
2 - Main/245HVAC INSTALLATION14658,670.00658,670.00
2 - Main/246HVAC INSTALLATION141,543,200.001,543,200.00
2 - Main/247HVAC INSTALLATION14453,590.00453,590.00
2 - Main/248HVAC INSTALLATION14329,180.00329,180.00
2 - Main/249HVAC INSTALLATION1451,460.0051,460.00
2 - Main/250HVAC INSTALLATION1473,970.0073,970.00
2 - Main/251HVAC INSTALLATION14429,810.00429,810.00
2 - Main/252HVAC INSTALLATION14917,920.00917,920.00
2 - Main/253HVAC INSTALLATION14176,450.00176,450.00
2 - Main/254HVAC INSTALLATION1457,040.0057,040.00
2 - Main/255HVAC INSTALLATION1478,030.0078,030.00
2 - Main/256HVAC INSTALLATION1468,450.0068,450.00
2 - Main/257HVAC INSTALLATION1475,190.0075,190.00
2 - Main/258HVAC INSTALLATION1482,410.0082,410.00
2 - Main/259HVAC INSTALLATION1476,740.0076,740.00
2 - Main/260HVAC INSTALLATION111,295,430.001,295,430.00
2 - Main/261HVAC INSTALLATION1211,237,970.0011,237,970.00
2 - Main/262HVAC INSTALLATION18190,965.00190,965.00
2 - Main/263HVAC INSTALLATION2229,640.0029,640.00
2 - Main/264HVAC INSTALLATION2232,430.0032,430.00
2 - Main/265HVAC INSTALLATION2225,455.0025,455.00
2 - Main/266HVAC INSTALLATION21113,526.00113,526.00
2 - Main/267HVAC INSTALLATION2227,538.0027,538.00
2 - Main/268HVAC INSTALLATION2225,074.0025,074.00
2 - Main/269HVAC INSTALLATION2226,376.0026,376.00
2 - Main/270HVAC INSTALLATION2019,482.0019,482.00
2 - Main/271HVAC INSTALLATION17108,090.00108,090.00
2 - Main/272HVAC INSTALLATION2048,612.0048,612.00
2 - Main/273HVAC INSTALLATION185,595.005,595.00
2 - Main/274HVAC INSTALLATION514,000.0014,000.00
2 - Main/275HVAC INSTALLATION840,000.0040,000.00
2 - Main/276HVAC INSTALLATION1512,799,020.0012,799,020.00
2 - Main/277HVAC INSTALLATION20478,450.00478,450.00
2 - Main/278HVAC INSTALLATION21108,122.00108,122.00
2 - Main/279HVAC INSTALLATION22131,642.00131,642.00
2 - Main/280HVAC INSTALLATION20147,756.00147,756.00
2 - Main/281HVAC INSTALLATION14502,480.00502,480.00
2 - Main/282HVAC INSTALLATION17136,816.00136,816.00
2 - Main/283HVAC INSTALLATION12758,870.00758,870.00
2 - Main/284HVAC INSTALLATION131,259,500.001,259,500.00
2 - Main/285HVAC INSTALLATION131,288,000.001,288,000.00
2 - Main/286HVAC INSTALLATION11291,000.00291,000.00
2 - Main/287HVAC INSTALLATION13207,000.00207,000.00
2 - Main/288HVAC INSTALLATION14490,000.00490,000.00
2 - Main/289HVAC INSTALLATION12315,000.00315,000.00
2 - Main/290HVAC INSTALLATION7140,000.00140,000.00
2 - Main/291LPG INSTALLATION11,093,200.001,093,200.00
2 - Main/292LPG INSTALLATION101,623,181.001,623,181.00
2 - Main/293LPG INSTALLATION147,172,328.007,172,328.00
2 - Main/294LPG INSTALLATION525,000.0025,000.00
2 - Main/295SUNDRIES911,139,546.2011,139,546.20
2 - Main/296SUNDRIES10.000.00
2 - Main/297WORK INCIDENTAL AND BWIC90.000.00
2 - Main/298WORK INCIDENTAL AND BWIC30.000.00
2 - Main/299GENERALLY10.000.00
2 - Main/300POWER INSTALLATION1061,086.0061,086.00
2 - Main/301POWER INSTALLATION16114,880.00114,880.00
2 - Main/302POWER INSTALLATION20139,000.00139,000.00
2 - Main/303POWER INSTALLATION15417,925.00417,925.00
2 - Main/304POWER INSTALLATION18661,745.00661,745.00
2 - Main/305POWER INSTALLATION16182,540.00182,540.00
2 - Main/306POWER INSTALLATION16269,820.00269,820.00
2 - Main/307POWER INSTALLATION13675,020.00675,020.00
2 - Main/308POWER INSTALLATION11404,256.00404,256.00
2 - Main/309POWER INSTALLATION1415,104.0015,104.00
2 - Main/310POWER INSTALLATION1235,122.0035,122.00
2 - Main/311POWER INSTALLATION1999,420.0099,420.00
2 - Main/312POWER INSTALLATION21110,600.00110,600.00
2 - Main/313POWER INSTALLATION2273,360.0073,360.00
2 - Main/314POWER INSTALLATION2292,880.0092,880.00
2 - Main/315POWER INSTALLATION2461,280.0061,280.00
2 - Main/316POWER INSTALLATION21119,760.00119,760.00
2 - Main/317POWER INSTALLATION14399,600.00399,600.00
2 - Main/318POWER INSTALLATION1594,640.0094,640.00
2 - Main/319POWER INSTALLATION17213,760.00213,760.00
2 - Main/320POWER INSTALLATION20290,080.00290,080.00
2 - Main/321POWER INSTALLATION15346,560.00346,560.00
2 - Main/322POWER INSTALLATION15239,760.00239,760.00
2 - Main/323POWER INSTALLATION16156,480.00156,480.00
2 - Main/324POWER INSTALLATION16288,080.00288,080.00
2 - Main/325POWER INSTALLATION19132,880.00132,880.00
2 - Main/326POWER INSTALLATION14368,400.00368,400.00
2 - Main/327POWER INSTALLATION17153,440.00153,440.00
2 - Main/328POWER INSTALLATION18202,720.00202,720.00
2 - Main/329POWER INSTALLATION14359,840.00359,840.00
2 - Main/330POWER INSTALLATION18133,760.00133,760.00
2 - Main/331POWER INSTALLATION14329,840.00329,840.00
2 - Main/332POWER INSTALLATION18250,400.00250,400.00
2 - Main/333POWER INSTALLATION16318,880.00318,880.00
2 - Main/334POWER INSTALLATION15190,810.00190,810.00
2 - Main/335POWER INSTALLATION14147,810.00147,810.00
2 - Main/336POWER INSTALLATION12119,170.00119,170.00
2 - Main/337POWER INSTALLATION11203,060.00203,060.00
2 - Main/338POWER INSTALLATION13194,210.00194,210.00
2 - Main/339POWER INSTALLATION14150,930.00150,930.00
2 - Main/340POWER INSTALLATION14127,530.00127,530.00
2 - Main/341POWER INSTALLATION24197,180.00197,180.00
2 - Main/342POWER INSTALLATION15159,680.00159,680.00
2 - Main/343POWER INSTALLATION17231,420.00231,420.00
2 - Main/344POWER INSTALLATION15214,625.00214,625.00
2 - Main/345POWER INSTALLATION19569,495.00569,495.00
2 - Main/346POWER INSTALLATION14227,200.00227,200.00
2 - Main/347POWER INSTALLATION11542,685.00542,685.00
2 - Main/348POWER INSTALLATION1440,380.0040,380.00
2 - Main/349POWER INSTALLATION1430,540.0030,540.00
2 - Main/350POWER INSTALLATION1435,940.0035,940.00
2 - Main/351POWER INSTALLATION1771,270.0071,270.00
2 - Main/352POWER INSTALLATION2266,880.0066,880.00
2 - Main/353POWER INSTALLATION2099,845.0099,845.00
2 - Main/354POWER INSTALLATION20123,595.00123,595.00
2 - Main/355POWER INSTALLATION20120,460.00120,460.00
2 - Main/356POWER INSTALLATION1685,950.0085,950.00
2 - Main/357POWER INSTALLATION21204,010.00204,010.00
2 - Main/358POWER INSTALLATION13143,840.00143,840.00
2 - Main/359POWER INSTALLATION15141,600.00141,600.00
2 - Main/360POWER INSTALLATION14542,120.00542,120.00
2 - Main/361POWER INSTALLATION13997,950.00997,950.00
2 - Main/362POWER INSTALLATION101,348,525.001,348,525.00
2 - Main/363POWER INSTALLATION106,280,390.006,280,390.00
2 - Main/364POWER INSTALLATION153,044,000.003,044,000.00
2 - Main/365POWER INSTALLATION22105,000.00105,000.00
2 - Main/366POWER INSTALLATION1785,000.0085,000.00
2 - Main/367POWER INSTALLATION1785,000.0085,000.00
2 - Main/368POWER INSTALLATION1680,000.0080,000.00
2 - Main/369POWER INSTALLATION1680,000.0080,000.00
2 - Main/370POWER INSTALLATION1890,000.0090,000.00
2 - Main/371POWER INSTALLATION15510,300.00510,300.00
2 - Main/372POWER INSTALLATION1413,253,400.0013,253,400.00
2 - Main/373POWER INSTALLATION1610,414,127.0010,414,127.00
2 - Main/374POWER INSTALLATION181,945,653.001,945,653.00
2 - Main/375POWER INSTALLATION22273,900.00273,900.00
2 - Main/376POWER INSTALLATION22272,150.00272,150.00
2 - Main/377POWER INSTALLATION22312,350.00312,350.00
2 - Main/378POWER INSTALLATION22274,550.00274,550.00
2 - Main/379POWER INSTALLATION22249,750.00249,750.00
2 - Main/380POWER INSTALLATION22246,300.00246,300.00
2 - Main/381POWER INSTALLATION20248,000.00248,000.00
2 - Main/382POWER INSTALLATION22268,900.00268,900.00
2 - Main/383POWER INSTALLATION26367,200.00367,200.00
2 - Main/384POWER INSTALLATION22272,800.00272,800.00
2 - Main/385POWER INSTALLATION22272,800.00272,800.00
550 blocks · 1 do not tie2,175,914,452.65

Source verification

Independent checks of the imported result against the raw workbook.
item count
Independent re-count matches on all 9 sheets (7621 items).
qty integrity
Quantity sums match the raw cells on every sheet.
amount integrity
Amount sums match the raw cells on every sheet.
row coverage
Every money-bearing row accounted for: items, block totals, 492 summary re-statements (excluded — would double-count), 366 post-summary annex rows (recorded, outside the bill's money story).
mirror
Cell-for-cell fidelity: descriptions, codes, and the number/text/empty state of every qty, rate and amount match the raw cells (30484 cells compared).
summary map
2 summary sheets, 2 entries: 2 matched to imported totals · imported but absent from every summary: 2 - Main, 3 - Ext, 3M, 4.1-M, 4.2-M, 4.3-M, 4.4-M
summary self check
The workbook's own summaries are internally consistent (5 checks across 3 sheets).
section tie
24/27 declared sections tie to the cent · DIFFERING: 2/R: declared 249590682.12, imported 249611555.25 (20873.13) · declared but not in this import: 1/GR “GENERAL REQUIREMENTS FOR THE WHOLE OF TH” declared 313190338.58; 4/PS “PROVISIONAL SUMS” declared 5720000.00 · 240 lines carry no section reference
zone tie
band identified arithmetically as BASEMENTS · GF & PODIUM · TOWER 1 · TOWER 2 · TOWER 3 · TOWER 4 (the identity held on 388/388 sampled priced rows) · 150/150 declared zone cells tie · the bidder keeps their own check on 7349 rows: we agree on 7211, differ on 2 (133 not comparable because the Amount cell prints words — their formula compares a number against text, which Excel makes FALSE whatever the arithmetic; 3 because a zone cell prints words) · 2 rows where their check asserts TRUE over a split that does not add up · 3 of 7340 priced rows do not add across their zones
tender tie
Declared tender 2478843708.09 − this import 2175914452.63 = 302929255.46. Declared scopes absent from this import come to 318910338.58 (1/GR, 4/PS), so this import holds 15981083.12 MORE than the summary declares — imported sheets the summary never names: 2 - Main, 3M, 4.1-M, 4.2-M, 4.3-M, 4.4-M.
amount in words
The tender figure in words could not be read back as a number, so it is not compared: “United Arab Emirates dirham”
summary strays
Off-column numbers beside summary entries, reported and never counted: Summary row 74: stray 26064.689999999944 beside “TOTAL AMOUNT”; Summary row 74: stray 28993484.57707391 beside “TOTAL AMOUNT”; Summary row 84: stray 1113.574620300764 beside “….......................................” …
summary echo
2/8 sheet totals re-stated verbatim by the workbook's own summary sheets (missing: 2 - Main, 3M, 4.1-M, 4.2-M, 4.3-M, 4.4-M)
12 unresolved errors7,621 lines · 550 blocks · 2,175,914,452.65 AED