Bill total
2,715,670,000.00
+0.02 vs qty×rate
Needs review
605
92%
0 errors · 605 to acknowledge
Reconciliation
Does not reconcile
LINEPAGESECTIONZONEBILLSUMMARY
Source verification
8/12
independent proofs against the raw file
Size
7,323
533 collection blocks · 4 sheets
1 block does not add up to the collection total its own page prints
errorBoth figures are shown — neither is corrected to the other.
503 lines print words where a figure belongs
to answerAccept the wording as a class, or put it to the bidder.
SECTION R - ELECTRICAL INSTALLATIONS 270SECTION F - WOOD WORK 59SECTION Q - MECHANICAL ENGINEERING INSTALLATIONS 34SECTION N - SPECIAL CONSTRUCTION 34+7 more sections
- References hereunder to the Schedule of Project Requirements (SOPR) are intended solely to direct the Contractor to the specific requirements of the Schedule of Project Requirements in respect of a particular item and do not in any way limit the scope of such item to the requirements of the Schedule of Project Requirements.
- 2 Advance Payment Guarantee
- 4 Contractor's All Risk Policy
100 lines carry no rate, so nothing reaches the totals
to answerSay why the bidder left them unpriced, or ask them to price them.
— 98SECTION N - SPECIAL CONSTRUCTION 2
- The rates and prices in these Bills of Quantities are fixed for the duration of the Contract and shall not be subject to any adjustment in respect of rise or fall in the cost of labour, materials, plant, equipment, transport or any other matters affecting the cost of execution of the Contract.
- 1 As per Emaar standard CoC
- 3 Performance Bond
1 line restarts its lettering without a new heading
to answerUsually a heading the page prints that was not picked up.
SECTION C - CONCRETE WORKS 1
- Coupling beams
1 line has no heading above it while its neighbours do
to answerA governing heading may have been missed when the page was read.
SECTION B - SITE WORKS 1
- Allow for planting edging
| Item | Description | Qty | Unit | Rate | Amount | State |
|---|---|---|---|---|---|---|
GENERAL REQUIREMENTS FOR THE WHOLE OF THE WORKS · GR1/1 0/2 clear0.00 Σ lines | ||||||
Generally The rates and prices in these Bills of Quantities are fixed for the duration of the Contract and shall not be subject to any adjustment in respect of rise or fall in the cost of labour, materials, plant, equipment, transport or any other matters affecting the cost of execution of the Contract.REVIEWThe source prints neither a quantity nor a rate and the Amount cell is empty — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | — | Needs review | |
Generally References hereunder to the Schedule of Project Requirements (SOPR) are intended solely to direct the Contractor to the specific requirements of the Schedule of Project Requirements in respect of a particular item and do not in any way limit the scope of such item to the requirements of the Schedule of Project Requirements.REVIEWAmount column prints "Included" — counted as 0.00 in the totals, exactly as the source's own page total does. Confirm this is intended (e.g. a RATE ONLY schedule). | — | Item | — | —Included | Needs review | |
GENERAL REQUIREMENTS FOR THE WHOLE OF THE WORKS · GR1/2 0/9 clear0.00 Σ lines✓ 0.00 printed | ||||||
A1.1- Schedule of Clauses 1 As per Emaar standard CoCREVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
A1.1- Schedule of Clauses 2 Advance Payment GuaranteeREVIEWAmount column prints "Included" — counted as 0.00 in the totals, exactly as the source's own page total does. Confirm this is intended (e.g. a RATE ONLY schedule). | — | Item | — | —Included | Needs review | |
A1.1- Schedule of Clauses 3 Performance BondREVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
A1.1- Schedule of Clauses 4 Contractor's All Risk PolicyREVIEWAmount column prints "By Employer" — counted as 0.00 in the totals, exactly as the source's own page total does. Confirm this is intended (e.g. a RATE ONLY schedule). | — | Item | — | —By Employer | Needs review | |
A1.1- Schedule of Clauses 5 Workmen's Compensation InsuranceREVIEWAmount column prints "Included" — counted as 0.00 in the totals, exactly as the source's own page total does. Confirm this is intended (e.g. a RATE ONLY schedule). | — | Item | — | —Included | Needs review | |
A1.1- Schedule of Clauses 6 Professional Indemnity insuranceREVIEWAmount column prints "Included" — counted as 0.00 in the totals, exactly as the source's own page total does. Confirm this is intended (e.g. a RATE ONLY schedule). | — | Item | — | —Included | Needs review | |
A1.1- Schedule of Clauses 7 Third Party liability insuranceREVIEWAmount column prints "By Employer" — counted as 0.00 in the totals, exactly as the source's own page total does. Confirm this is intended (e.g. a RATE ONLY schedule). | — | Item | — | —By Employer | Needs review | |
A1.1- Schedule of Clauses 8 Plant and Contractor's Equipment InsuranceREVIEWAmount column prints "Included" — counted as 0.00 in the totals, exactly as the source's own page total does. Confirm this is intended (e.g. a RATE ONLY schedule). | — | Item | — | —Included | Needs review | |
A1.1- Schedule of Clauses 9 Motor Vehicle Third Party and Passenger Liability InsuranceREVIEWAmount column prints "Included" — counted as 0.00 in the totals, exactly as the source's own page total does. Confirm this is intended (e.g. a RATE ONLY schedule). | — | Item | — | —Included | Needs review | |
GENERAL REQUIREMENTS FOR THE WHOLE OF THE WORKS · GR1/3 0/1 clear0.00 Σ lines✓ 0.00 printed | ||||||
A1.1- Schedule of Clauses The Contractor shall price hereunder any special requirements related to the specification clausesREVIEWAmount column prints "Included" — counted as 0.00 in the totals, exactly as the source's own page total does. Confirm this is intended (e.g. a RATE ONLY schedule). | — | Item | — | —Included | Needs review | |
GENERAL REQUIREMENTS FOR THE WHOLE OF THE WORKS · GR1/4 0/5 clear0.00 Σ lines✓ 0.00 printed | ||||||
A3 - Restrictions 1 Access for and Possession or use of the SiteREVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
A3 - Restrictions 2 Limitations of working spaceREVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
A3 - Restrictions 3 Limitations of working hoursREVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
A3 - Restrictions 4 The Maintenance of existing services on, under or over the SiteREVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
A3 - Restrictions 5 The Execution of the Works in the required specific order, sections or phasesREVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
GENERAL REQUIREMENTS FOR THE WHOLE OF THE WORKS · GR1/5 0/7 clear0.00 Σ lines✓ 0.00 printed | ||||||
1 Office for the Contract administrators i. EstablishmentREVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
1 Office for the Contract administrators ii. MaintenanceREVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
1 Office for the Contract administrators iii. RemovalREVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
1 Office for the Contract administrators 2 SupervisionREVIEWAmount column prints "Included" — counted as 0.00 in the totals, exactly as the source's own page total does. Confirm this is intended (e.g. a RATE ONLY schedule). | — | Item | — | —Included | Needs review | |
1 Office for the Contract administrators 3 SecurityREVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
1 Office for the Contract administrators 4 Safety, health and welfare of workpeopleREVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
1 Office for the Contract administrators 5 Transport of workpeopleREVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
GENERAL REQUIREMENTS FOR THE WHOLE OF THE WORKS · GR1/6 0/16 clear0.00 Σ lines✓ 0.00 printed | ||||||
1 Small plant and tools i. Establishment (Fixed Charges)REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
1 Small plant and tools ii. Maintenance (Time Related Charges)REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
1 Small plant and tools iii. Removal (Fixed Charges)REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
2 Scaffoldings i. Establishment (Fixed Charges)REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
2 Scaffoldings ii. Maintenance (Time Related Charges)REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
2 Scaffoldings iii. Removal (Fixed Charges)REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
3 Cranes and lifting plant i. Establishment (Fixed Charges)REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
3 Cranes and lifting plant ii. Maintenance (Time Related Charges)REVIEWAmount column prints "Included" — counted as 0.00 in the totals, exactly as the source's own page total does. Confirm this is intended (e.g. a RATE ONLY schedule). | — | Item | — | —Included | Needs review | |
3 Cranes and lifting plant iii. Removal (Fixed Charges)REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
4 Plant required for specific trades i. Establishment (Fixed Charges)REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
4 Plant required for specific trades ii. Maintenance (Time Related Charges)REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
4 Plant required for specific trades iii. Removal (Fixed Charges)REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
5 Site Transport i. Establishment (Fixed Charges)REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
5 Site Transport ii. Maintenance (Time Related Charges)REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
5 Site Transport iii. Removal (Fixed Charges)REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
5 Site Transport 6 Other plant not listed above but necessary for the completion of the WorksREVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
GENERAL REQUIREMENTS FOR THE WHOLE OF THE WORKS · GR1/7 0/11 clear0.00 Σ lines✓ 0.00 printed | ||||||
1 - Temporary fully functional site facilities i. Establishment (Fixed Charges)REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
1 - Temporary fully functional site facilities ii. Maintenance (Time Related Charges)REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
1 - Temporary fully functional site facilities iii. Removal (Fixed Charges)REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
2 - Telephones, including costs of calls i. Establishment (Fixed Charges)REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
2 - Telephones, including costs of calls ii. Maintenance (Time Related Charges)REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
2 - Telephones, including costs of calls iii. Removal (Fixed Charges)REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
2 - Telephones, including costs of calls 3 - Attendance of staff (for example, drivers, laboratory assistants)REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
4 - Equipment (for example surveying equipment, laboratory equipment) i. Establishment (Fixed Charges)REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
4 - Equipment (for example surveying equipment, laboratory equipment) ii. Maintenance (Time Related Charges)REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
4 - Equipment (for example surveying equipment, laboratory equipment) iii. Removal (Fixed Charges)REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
4 - Equipment (for example surveying equipment, laboratory equipment) 5 - Special requirements for programmes or progress chartsREVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
GENERAL REQUIREMENTS FOR THE WHOLE OF THE WORKS · GR1/8 0/4 clear0.00 Σ lines✓ 0.00 printed | ||||||
6 Any other facilities (for example, progress photographs). i. Establishment (Fixed Charges)REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
6 Any other facilities (for example, progress photographs). ii. Maintenance (Time Related Charges)REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
6 Any other facilities (for example, progress photographs). iii. Removal (Fixed Charges)REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
Signboard Existing signboard to be taken over from Enabling Works contractor and Main Works contractor to update the names, maintain as required, remove after completion of the WorksREVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
GENERAL REQUIREMENTS FOR THE WHOLE OF THE WORKS · GR1/9 0/11 clear0.00 Σ lines | ||||||
1 - Contractor's Facilities, including offices, toilets, laboratories, compounds, stores, mess rooms ii. Maintenance (Time Related Charges)REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
1 - Contractor's Facilities, including offices, toilets, laboratories, compounds, stores, mess rooms iii. Removal (Fixed Charges)REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
2 - Temporary fencing, hoardings i. Existing temporary site perimeter hoarding to be taken over from Enabling Works contractor and Main Works contractor to move / remove / adjust, maintain as requiredREVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
2 - Temporary fencing, hoardings ii. Maintenance (Time Related Charges)REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
2 - Temporary fencing, hoardings ii. Final Removal (Fixed Charges)REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
3 Screens and guardrails i. Establishment (Fixed Charges)REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
3 Screens and guardrails ii. Maintenance (Time Related Charges)REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
3 Screens and guardrails iii. Removal (Fixed Charges)REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
4 Temporary roads, hard standings and crossings i. Establishment (Fixed Charges)REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
4 Temporary roads, hard standings and crossings ii. Maintenance (Time Related Charges)REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
4 Temporary roads, hard standings and crossings iii. Removal (Fixed Charges)REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
GENERAL REQUIREMENTS FOR THE WHOLE OF THE WORKS · GR1/10 0/9 clear0.00 Σ lines✓ 0.00 printed | ||||||
5 Water for the Works i. Establishment (Fixed Charges)REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
5 Water for the Works ii. Maintenance (Time Related Charges)REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
5 Water for the Works iii. Removal (Fixed Charges)REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
6 Lighting and power for the Works i. Establishment (Fixed Charges)REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
6 Lighting and power for the Works ii. Maintenance (Time Related Charges)REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
6 Lighting and power for the Works iii. Removal (Fixed Charges)REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
7 Temporary telephones, electronic mail and facsimile i. Establishment (Fixed Charges)REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
7 Temporary telephones, electronic mail and facsimile ii. Maintenance (Time Related Charges)REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
7 Temporary telephones, electronic mail and facsimile iii. Removal (Fixed Charges)REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
GENERAL REQUIREMENTS FOR THE WHOLE OF THE WORKS · GR1/11 0/3 clear0.00 Σ lines✓ 0.00 printed | ||||||
A8.1 An item shall be given for temporary works including design, which shall include: 1 Traffic diversionREVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
A8.1 An item shall be given for temporary works including design, which shall include: 2 Access roadsREVIEWAmount column prints "Included" — counted as 0.00 in the totals, exactly as the source's own page total does. Confirm this is intended (e.g. a RATE ONLY schedule). | — | Item | — | —Included | Needs review | |
A8.1 An item shall be given for temporary works including design, which shall include: 3 PumpingREVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
GENERAL REQUIREMENTS FOR THE WHOLE OF THE WORKS · GR1/12 0/14 clear0.00 Σ lines✓ 0.00 printed | ||||||
A9.1 An item shall be given for temporary works, which shall include: 1 - Testing of materialsREVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
A9.1 An item shall be given for temporary works, which shall include: 2 - Testing of the WorksREVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
A9.1 An item shall be given for temporary works, which shall include: 3 - Protecting the Works from inclement weatherREVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
A9.1 An item shall be given for temporary works, which shall include: 4 - Removing rubbish, protective casings and coverings and cleaning the Works at completionREVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
A9.1 An item shall be given for temporary works, which shall include: 5 - Traffic regulationsREVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
A9.1 An item shall be given for temporary works, which shall include: 6 - Maintenance of public and private roadsREVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
A9.1 An item shall be given for temporary works, which shall include: 7 - Drying the WorksREVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
A9.1 An item shall be given for temporary works, which shall include: 8 - Control of noise and pollutionREVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
A9.1 An item shall be given for temporary works, which shall include: 9 - All Statutory obligationsREVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
A9.2 Particulars shall be given where the nature or extent of the sundry items is not at the discretion of the Contractor. 1 - Coordination with the Works by OthersREVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
A9.2 Particulars shall be given where the nature or extent of the sundry items is not at the discretion of the Contractor. 2 - Surveys, Setting-out and LevelsREVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
A9.2 Particulars shall be given where the nature or extent of the sundry items is not at the discretion of the Contractor. 3 - Dust Control, Pest Control and Lightning ProtectionREVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
A9.2 Particulars shall be given where the nature or extent of the sundry items is not at the discretion of the Contractor. 4 - Off site storageREVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
A9.2 Particulars shall be given where the nature or extent of the sundry items is not at the discretion of the Contractor. 5 - Packing, marking, storage, handling and unpackingREVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
GENERAL REQUIREMENTS FOR THE WHOLE OF THE WORKS · GR1/13 0/17 clear0.00 Σ lines✓ 0.00 printed | ||||||
A9.2 Particulars shall be given where the nature or extent of the sundry items is not at the discretion of the Contractor. 6 - Specialist Third Party Testing, Commissioning and CertificationREVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
A9.2 Particulars shall be given where the nature or extent of the sundry items is not at the discretion of the Contractor. 7 - Shop DrawingsREVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
A9.2 Particulars shall be given where the nature or extent of the sundry items is not at the discretion of the Contractor. 8 - Submittal program, drawings and revisionsREVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
A9.2 Particulars shall be given where the nature or extent of the sundry items is not at the discretion of the Contractor. 9 - Method StatementsREVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
A9.2 Particulars shall be given where the nature or extent of the sundry items is not at the discretion of the Contractor. 10 - Operation and Maintenance ManualsREVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
A9.2 Particulars shall be given where the nature or extent of the sundry items is not at the discretion of the Contractor. 11 - Building Information Modelling (BIM) SystemREVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
A9.2 Particulars shall be given where the nature or extent of the sundry items is not at the discretion of the Contractor. 12 - Project Management System - UnifierREVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
A9.2 Particulars shall be given where the nature or extent of the sundry items is not at the discretion of the Contractor. 12 - Internet connection requirements on siteREVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
A9.2 Particulars shall be given where the nature or extent of the sundry items is not at the discretion of the Contractor. 13 - Precautions against FireREVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
A9.2 Particulars shall be given where the nature or extent of the sundry items is not at the discretion of the Contractor. 15 - Project Health, Safety, Environment and Security GuidelinesREVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
A9.2 Particulars shall be given where the nature or extent of the sundry items is not at the discretion of the Contractor. 16 - General cleaning and waste disposal during constructionREVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
A9.2 Particulars shall be given where the nature or extent of the sundry items is not at the discretion of the Contractor. 17 - Final Cleaning for Project HandoverREVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
A9.2 Particulars shall be given where the nature or extent of the sundry items is not at the discretion of the Contractor. 18 - Provision of Handover DocumentationREVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
A9.2 Particulars shall be given where the nature or extent of the sundry items is not at the discretion of the Contractor. 19 - Contract Spares/Attic stockREVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
A9.2 Particulars shall be given where the nature or extent of the sundry items is not at the discretion of the Contractor. 20 - As-built drawingsREVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
A9.2 Particulars shall be given where the nature or extent of the sundry items is not at the discretion of the Contractor. 21 - Design of the Works to the extent provided for in the ContractREVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
A9.2 Particulars shall be given where the nature or extent of the sundry items is not at the discretion of the Contractor. 22 - WarrantiesREVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
GENERAL REQUIREMENTS FOR THE WHOLE OF THE WORKS · GR1/14 0/1 clear0.00 Σ lines✓ 0.00 printed | ||||||
A9.2 Particulars shall be given where the nature or extent of the sundry items is not at the discretion of the Contractor. 23 - All mock-ups, prototypes and samples required by the Specification, the Drawings and the Schedule of Project RequirementsREVIEWAmount column prints "Included" — counted as 0.00 in the totals, exactly as the source's own page total does. Confirm this is intended (e.g. a RATE ONLY schedule). | — | Item | — | —Included | Needs review | |
GENERAL REQUIREMENTS FOR THE WHOLE OF THE WORKS · GR1/15 0/1 clear0.00 Σ lines✓ 0.00 printed | ||||||
Additional Items Any items that may not be covered elsewhere in the Bills of Quantities which the Tenderer deemed to be necessary in order to carry out the works in full compliance with the SOPR must be itemised and price belowREVIEWThe source prints neither a quantity nor a rate and the Amount cell is empty — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | — | Needs review | |
2/C · 2/C/3 · POURED CONCRETE · 2 - Main/6 0/1 clear399,171.08 Σ lines | ||||||
Reinforced concrete; concrete grade C56/70 Coupling beamsREVIEWReference sequence restarts at "A" on 2 - Main/6 without a heading change — a governing heading may have been missed above it. | 812 | m3 | 491.59 | 399,171.08 | Needs review | |
2/D · 2/D/2 · SUNDRIES · 2 - Main/16 0/2 clear0.00 Σ lines | ||||||
Joints in masonry; including fire resistant compressible joint filler, sealant, angle head restraints, telescopic, sleeved and/or debonded ties and the like Dowelled control jointsREVIEWAmount column prints "Included in item A-L" — counted as 0.00 in the totals, exactly as the source's own page total does. Confirm this is intended (e.g. a RATE ONLY schedule). | 1 | Item | 0.00 | 0.00Included in item A-L | Needs review | |
Joints in masonry; including fire resistant compressible joint filler, sealant, angle head restraints, telescopic, sleeved and/or debonded ties and the like Isolation jointsREVIEWAmount column prints "Included in item A-L" — counted as 0.00 in the totals, exactly as the source's own page total does. Confirm this is intended (e.g. a RATE ONLY schedule). | 1 | Item | 0.00 | 0.00Included in item A-L | Needs review | |
2/F · 2/F/12 · COMPOSITE ITEMS · 2 - Main/40 0/9 clear0.00 Σ lines | ||||||
Kitchen cabinets; including countertop, forming of holes, frames, carcass, supports, front/back/side panels, doors, shelves, drawers, concealed light (measured separately), skirting, hardware, finishes, accessories and all ancillary works as necessary Type 1; base unit; size 3395 x 640 x 900mm highREVIEWAmount column prints "Included in Item-A&B" — counted as 0.00 in the totals, exactly as the source's own page total does. Confirm this is intended (e.g. a RATE ONLY schedule). | 2 | Nr. | 0.00 | 0.00Included in Item-A&B | Needs review | |
Kitchen cabinets; including countertop, forming of holes, frames, carcass, supports, front/back/side panels, doors, shelves, drawers, concealed light (measured separately), skirting, hardware, finishes, accessories and all ancillary works as necessary Type 1; wall unit; size 2540 x 350 x 1100mm highREVIEWAmount column prints "Included in Item-A&B" — counted as 0.00 in the totals, exactly as the source's own page total does. Confirm this is intended (e.g. a RATE ONLY schedule). | 143 | Nr. | 0.00 | 0.00Included in Item-A&B | Needs review | |
Kitchen cabinets; including countertop, forming of holes, frames, carcass, supports, front/back/side panels, doors, shelves, drawers, concealed light (measured separately), skirting, hardware, finishes, accessories and all ancillary works as necessary Extra over for glass unit; size 1040 x 350 x 1100mm highREVIEWAmount column prints "Included in Item-A&B" — counted as 0.00 in the totals, exactly as the source's own page total does. Confirm this is intended (e.g. a RATE ONLY schedule). | 143 | Nr. | 0.00 | 0.00Included in Item-A&B | Needs review | |
Kitchen cabinets; including countertop, forming of holes, frames, carcass, supports, front/back/side panels, doors, shelves, drawers, concealed light (measured separately), skirting, hardware, finishes, accessories and all ancillary works as necessary Type 1; full unit; size 630 x 615 x 2600mm highREVIEWAmount column prints "Included in Item-A&B" — counted as 0.00 in the totals, exactly as the source's own page total does. Confirm this is intended (e.g. a RATE ONLY schedule). | 2 | Nr. | 0.00 | 0.00Included in Item-A&B | Needs review | |
Kitchen cabinets; including countertop, forming of holes, frames, carcass, supports, front/back/side panels, doors, shelves, drawers, concealed light (measured separately), skirting, hardware, finishes, accessories and all ancillary works as necessary Type 1; full unit; size 1080 x 615 x 2600mm highREVIEWAmount column prints "Included in Item-A&B" — counted as 0.00 in the totals, exactly as the source's own page total does. Confirm this is intended (e.g. a RATE ONLY schedule). | 141 | Nr. | 0.00 | 0.00Included in Item-A&B | Needs review | |
Kitchen cabinets; including countertop, forming of holes, frames, carcass, supports, front/back/side panels, doors, shelves, drawers, concealed light (measured separately), skirting, hardware, finishes, accessories and all ancillary works as necessary Type 2; wall unit; size (2520+1750) x 350 x 1100mm high; L-shapedREVIEWAmount column prints "Included in Item-L&M" — counted as 0.00 in the totals, exactly as the source's own page total does. Confirm this is intended (e.g. a RATE ONLY schedule). | 328 | Nr. | 0.00 | 0.00Included in Item-L&M | Needs review | |
Kitchen cabinets; including countertop, forming of holes, frames, carcass, supports, front/back/side panels, doors, shelves, drawers, concealed light (measured separately), skirting, hardware, finishes, accessories and all ancillary works as necessary Type 2; wall unit; size (2650+1480) x 350 x 1100mm high; L-shapedREVIEWAmount column prints "Included in Item-L&M" — counted as 0.00 in the totals, exactly as the source's own page total does. Confirm this is intended (e.g. a RATE ONLY schedule). | 192 | Nr. | 0.00 | 0.00Included in Item-L&M | Needs review | |
Kitchen cabinets; including countertop, forming of holes, frames, carcass, supports, front/back/side panels, doors, shelves, drawers, concealed light (measured separately), skirting, hardware, finishes, accessories and all ancillary works as necessary Extra over for glass unit; size 330 x 350 x 1100mm highREVIEWAmount column prints "Included in Item-L&M" — counted as 0.00 in the totals, exactly as the source's own page total does. Confirm this is intended (e.g. a RATE ONLY schedule). | 1,040 | Nr. | 0.00 | 0.00Included in Item-L&M | Needs review | |
Kitchen cabinets; including countertop, forming of holes, frames, carcass, supports, front/back/side panels, doors, shelves, drawers, concealed light (measured separately), skirting, hardware, finishes, accessories and all ancillary works as necessary Type 2; full unit; size 600 x 615 x 2600mm highREVIEWAmount column prints "Included in Item-L&M" — counted as 0.00 in the totals, exactly as the source's own page total does. Confirm this is intended (e.g. a RATE ONLY schedule). | 520 | Nr. | 0.00 | 0.00Included in Item-L&M | Needs review | |
2/F · 2/F/13 · COMPOSITE ITEMS · 2 - Main/41 0/12 clear0.00 Σ lines | ||||||
Kitchen cabinets; including countertop, forming of holes, frames, carcass, supports, front/back/side panels, doors, shelves, drawers, concealed light (measured separately), skirting, hardware, finishes, accessories and all ancillary works as necessary Type 3; wall unit; size 560 1375 x 350 x 1100mm highREVIEWAmount column prints "Included in Item-C" — counted as 0.00 in the totals, exactly as the source's own page total does. Confirm this is intended (e.g. a RATE ONLY schedule). | 364 | Nr. | 0.00 | 0.00Included in Item-C | Needs review | |
Kitchen cabinets; including countertop, forming of holes, frames, carcass, supports, front/back/side panels, doors, shelves, drawers, concealed light (measured separately), skirting, hardware, finishes, accessories and all ancillary works as necessary Type 3; wall unit; size 1690 x 350 x 1100mm highREVIEWAmount column prints "Included in Item-C" — counted as 0.00 in the totals, exactly as the source's own page total does. Confirm this is intended (e.g. a RATE ONLY schedule). | 364 | Nr. | 0.00 | 0.00Included in Item-C | Needs review | |
Kitchen cabinets; including countertop, forming of holes, frames, carcass, supports, front/back/side panels, doors, shelves, drawers, concealed light (measured separately), skirting, hardware, finishes, accessories and all ancillary works as necessary Extra over for glass unit; size 880 x 350 x 1100mm highREVIEWAmount column prints "Included in Item-C" — counted as 0.00 in the totals, exactly as the source's own page total does. Confirm this is intended (e.g. a RATE ONLY schedule). | 364 | Nr. | 0.00 | 0.00Included in Item-C | Needs review | |
Kitchen cabinets; including countertop, forming of holes, frames, carcass, supports, front/back/side panels, doors, shelves, drawers, concealed light (measured separately), skirting, hardware, finishes, accessories and all ancillary works as necessary Type 3; full unit; size 600 x 615 x 2600mm highREVIEWAmount column prints "Included in Item-C" — counted as 0.00 in the totals, exactly as the source's own page total does. Confirm this is intended (e.g. a RATE ONLY schedule). | 364 | Nr. | 0.00 | 0.00Included in Item-C | Needs review | |
Kitchen cabinets; including countertop, forming of holes, frames, carcass, supports, front/back/side panels, doors, shelves, drawers, concealed light (measured separately), skirting, hardware, finishes, accessories and all ancillary works as necessary Type 4; wall unit; size (3190+1140) x 350 x 1100mm high; L-shapedREVIEWAmount column prints "Included in Item-J&K" — counted as 0.00 in the totals, exactly as the source's own page total does. Confirm this is intended (e.g. a RATE ONLY schedule). | 49 | Nr. | 0.00 | 0.00Included in Item-J&K | Needs review | |
Kitchen cabinets; including countertop, forming of holes, frames, carcass, supports, front/back/side panels, doors, shelves, drawers, concealed light (measured separately), skirting, hardware, finishes, accessories and all ancillary works as necessary Extra over for glass unit; size 590 x 350 x 1070mm highREVIEWAmount column prints "Included in Item-J&K" — counted as 0.00 in the totals, exactly as the source's own page total does. Confirm this is intended (e.g. a RATE ONLY schedule). | 49 | Nr. | 0.00 | 0.00Included in Item-J&K | Needs review | |
Kitchen cabinets; including countertop, forming of holes, frames, carcass, supports, front/back/side panels, doors, shelves, drawers, concealed light (measured separately), skirting, hardware, finishes, accessories and all ancillary works as necessary Type 4; full unit; size 600 x 615 x 2600mm highREVIEWAmount column prints "Included in Item-J&K" — counted as 0.00 in the totals, exactly as the source's own page total does. Confirm this is intended (e.g. a RATE ONLY schedule). | 49 | Nr. | 0.00 | 0.00Included in Item-J&K | Needs review | |
Kitchen cabinets; including countertop, forming of holes, frames, carcass, supports, front/back/side panels, doors, shelves, drawers, concealed light (measured separately), skirting, hardware, finishes, accessories and all ancillary works as necessary Type 5; wall unit; size 3660 x 350 x 1100mm highREVIEWAmount column prints "Included in Item-P" — counted as 0.00 in the totals, exactly as the source's own page total does. Confirm this is intended (e.g. a RATE ONLY schedule). | 736 | Nr. | 0.00 | 0.00Included in Item-P | Needs review | |
| loading more… 150 of 605 lines rendered | ||||||
| Item | Description | Qty | Unit | Rate | Amount | State |
|---|---|---|---|---|---|---|
GENERAL REQUIREMENTS FOR THE WHOLE OF THE WORKS 0/111 clear0.00 Σ lines | ||||||
Generally The rates and prices in these Bills of Quantities are fixed for the duration of the Contract and shall not be subject to any adjustment in respect of rise or fall in the cost of labour, materials, plant, equipment, transport or any other matters affecting the cost of execution of the Contract.REVIEWThe source prints neither a quantity nor a rate and the Amount cell is empty — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | — | Needs review | |
Generally References hereunder to the Schedule of Project Requirements (SOPR) are intended solely to direct the Contractor to the specific requirements of the Schedule of Project Requirements in respect of a particular item and do not in any way limit the scope of such item to the requirements of the Schedule of Project Requirements.REVIEWAmount column prints "Included" — counted as 0.00 in the totals, exactly as the source's own page total does. Confirm this is intended (e.g. a RATE ONLY schedule). | — | Item | — | —Included | Needs review | |
A1.1- Schedule of Clauses 1 As per Emaar standard CoCREVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
A1.1- Schedule of Clauses 2 Advance Payment GuaranteeREVIEWAmount column prints "Included" — counted as 0.00 in the totals, exactly as the source's own page total does. Confirm this is intended (e.g. a RATE ONLY schedule). | — | Item | — | —Included | Needs review | |
A1.1- Schedule of Clauses 3 Performance BondREVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
A1.1- Schedule of Clauses 4 Contractor's All Risk PolicyREVIEWAmount column prints "By Employer" — counted as 0.00 in the totals, exactly as the source's own page total does. Confirm this is intended (e.g. a RATE ONLY schedule). | — | Item | — | —By Employer | Needs review | |
A1.1- Schedule of Clauses 5 Workmen's Compensation InsuranceREVIEWAmount column prints "Included" — counted as 0.00 in the totals, exactly as the source's own page total does. Confirm this is intended (e.g. a RATE ONLY schedule). | — | Item | — | —Included | Needs review | |
A1.1- Schedule of Clauses 6 Professional Indemnity insuranceREVIEWAmount column prints "Included" — counted as 0.00 in the totals, exactly as the source's own page total does. Confirm this is intended (e.g. a RATE ONLY schedule). | — | Item | — | —Included | Needs review | |
A1.1- Schedule of Clauses 7 Third Party liability insuranceREVIEWAmount column prints "By Employer" — counted as 0.00 in the totals, exactly as the source's own page total does. Confirm this is intended (e.g. a RATE ONLY schedule). | — | Item | — | —By Employer | Needs review | |
A1.1- Schedule of Clauses 8 Plant and Contractor's Equipment InsuranceREVIEWAmount column prints "Included" — counted as 0.00 in the totals, exactly as the source's own page total does. Confirm this is intended (e.g. a RATE ONLY schedule). | — | Item | — | —Included | Needs review | |
A1.1- Schedule of Clauses 9 Motor Vehicle Third Party and Passenger Liability InsuranceREVIEWAmount column prints "Included" — counted as 0.00 in the totals, exactly as the source's own page total does. Confirm this is intended (e.g. a RATE ONLY schedule). | — | Item | — | —Included | Needs review | |
A1.1- Schedule of Clauses The Contractor shall price hereunder any special requirements related to the specification clausesREVIEWAmount column prints "Included" — counted as 0.00 in the totals, exactly as the source's own page total does. Confirm this is intended (e.g. a RATE ONLY schedule). | — | Item | — | —Included | Needs review | |
A3 - Restrictions 1 Access for and Possession or use of the SiteREVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
A3 - Restrictions 2 Limitations of working spaceREVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
A3 - Restrictions 3 Limitations of working hoursREVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
A3 - Restrictions 4 The Maintenance of existing services on, under or over the SiteREVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
A3 - Restrictions 5 The Execution of the Works in the required specific order, sections or phasesREVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
1 Office for the Contract administrators i. EstablishmentREVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
1 Office for the Contract administrators ii. MaintenanceREVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
1 Office for the Contract administrators iii. RemovalREVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
1 Office for the Contract administrators 2 SupervisionREVIEWAmount column prints "Included" — counted as 0.00 in the totals, exactly as the source's own page total does. Confirm this is intended (e.g. a RATE ONLY schedule). | — | Item | — | —Included | Needs review | |
1 Office for the Contract administrators 3 SecurityREVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
1 Office for the Contract administrators 4 Safety, health and welfare of workpeopleREVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
1 Office for the Contract administrators 5 Transport of workpeopleREVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
1 Small plant and tools i. Establishment (Fixed Charges)REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
1 Small plant and tools ii. Maintenance (Time Related Charges)REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
1 Small plant and tools iii. Removal (Fixed Charges)REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
2 Scaffoldings i. Establishment (Fixed Charges)REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
2 Scaffoldings ii. Maintenance (Time Related Charges)REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
2 Scaffoldings iii. Removal (Fixed Charges)REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
3 Cranes and lifting plant i. Establishment (Fixed Charges)REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
3 Cranes and lifting plant ii. Maintenance (Time Related Charges)REVIEWAmount column prints "Included" — counted as 0.00 in the totals, exactly as the source's own page total does. Confirm this is intended (e.g. a RATE ONLY schedule). | — | Item | — | —Included | Needs review | |
3 Cranes and lifting plant iii. Removal (Fixed Charges)REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
4 Plant required for specific trades i. Establishment (Fixed Charges)REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
4 Plant required for specific trades ii. Maintenance (Time Related Charges)REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
4 Plant required for specific trades iii. Removal (Fixed Charges)REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
5 Site Transport i. Establishment (Fixed Charges)REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
5 Site Transport ii. Maintenance (Time Related Charges)REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
5 Site Transport iii. Removal (Fixed Charges)REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
5 Site Transport 6 Other plant not listed above but necessary for the completion of the WorksREVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
1 - Temporary fully functional site facilities i. Establishment (Fixed Charges)REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
1 - Temporary fully functional site facilities ii. Maintenance (Time Related Charges)REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
1 - Temporary fully functional site facilities iii. Removal (Fixed Charges)REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
2 - Telephones, including costs of calls i. Establishment (Fixed Charges)REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
2 - Telephones, including costs of calls ii. Maintenance (Time Related Charges)REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
2 - Telephones, including costs of calls iii. Removal (Fixed Charges)REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
2 - Telephones, including costs of calls 3 - Attendance of staff (for example, drivers, laboratory assistants)REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
4 - Equipment (for example surveying equipment, laboratory equipment) i. Establishment (Fixed Charges)REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
4 - Equipment (for example surveying equipment, laboratory equipment) ii. Maintenance (Time Related Charges)REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
4 - Equipment (for example surveying equipment, laboratory equipment) iii. Removal (Fixed Charges)REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
4 - Equipment (for example surveying equipment, laboratory equipment) 5 - Special requirements for programmes or progress chartsREVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
6 Any other facilities (for example, progress photographs). i. Establishment (Fixed Charges)REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
6 Any other facilities (for example, progress photographs). ii. Maintenance (Time Related Charges)REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
6 Any other facilities (for example, progress photographs). iii. Removal (Fixed Charges)REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
Signboard Existing signboard to be taken over from Enabling Works contractor and Main Works contractor to update the names, maintain as required, remove after completion of the WorksREVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
1 - Contractor's Facilities, including offices, toilets, laboratories, compounds, stores, mess rooms ii. Maintenance (Time Related Charges)REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
1 - Contractor's Facilities, including offices, toilets, laboratories, compounds, stores, mess rooms iii. Removal (Fixed Charges)REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
2 - Temporary fencing, hoardings i. Existing temporary site perimeter hoarding to be taken over from Enabling Works contractor and Main Works contractor to move / remove / adjust, maintain as requiredREVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
2 - Temporary fencing, hoardings ii. Maintenance (Time Related Charges)REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
2 - Temporary fencing, hoardings ii. Final Removal (Fixed Charges)REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
3 Screens and guardrails i. Establishment (Fixed Charges)REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
3 Screens and guardrails ii. Maintenance (Time Related Charges)REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
3 Screens and guardrails iii. Removal (Fixed Charges)REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
4 Temporary roads, hard standings and crossings i. Establishment (Fixed Charges)REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
4 Temporary roads, hard standings and crossings ii. Maintenance (Time Related Charges)REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
4 Temporary roads, hard standings and crossings iii. Removal (Fixed Charges)REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
5 Water for the Works i. Establishment (Fixed Charges)REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
5 Water for the Works ii. Maintenance (Time Related Charges)REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
5 Water for the Works iii. Removal (Fixed Charges)REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
6 Lighting and power for the Works i. Establishment (Fixed Charges)REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
6 Lighting and power for the Works ii. Maintenance (Time Related Charges)REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
6 Lighting and power for the Works iii. Removal (Fixed Charges)REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
7 Temporary telephones, electronic mail and facsimile i. Establishment (Fixed Charges)REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
7 Temporary telephones, electronic mail and facsimile ii. Maintenance (Time Related Charges)REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
7 Temporary telephones, electronic mail and facsimile iii. Removal (Fixed Charges)REVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
A8.1 An item shall be given for temporary works including design, which shall include: 1 Traffic diversionREVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
A8.1 An item shall be given for temporary works including design, which shall include: 2 Access roadsREVIEWAmount column prints "Included" — counted as 0.00 in the totals, exactly as the source's own page total does. Confirm this is intended (e.g. a RATE ONLY schedule). | — | Item | — | —Included | Needs review | |
A8.1 An item shall be given for temporary works including design, which shall include: 3 PumpingREVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
A9.1 An item shall be given for temporary works, which shall include: 1 - Testing of materialsREVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
A9.1 An item shall be given for temporary works, which shall include: 2 - Testing of the WorksREVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
A9.1 An item shall be given for temporary works, which shall include: 3 - Protecting the Works from inclement weatherREVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
A9.1 An item shall be given for temporary works, which shall include: 4 - Removing rubbish, protective casings and coverings and cleaning the Works at completionREVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
A9.1 An item shall be given for temporary works, which shall include: 5 - Traffic regulationsREVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
A9.1 An item shall be given for temporary works, which shall include: 6 - Maintenance of public and private roadsREVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
A9.1 An item shall be given for temporary works, which shall include: 7 - Drying the WorksREVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
A9.1 An item shall be given for temporary works, which shall include: 8 - Control of noise and pollutionREVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
A9.1 An item shall be given for temporary works, which shall include: 9 - All Statutory obligationsREVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
A9.2 Particulars shall be given where the nature or extent of the sundry items is not at the discretion of the Contractor. 1 - Coordination with the Works by OthersREVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
A9.2 Particulars shall be given where the nature or extent of the sundry items is not at the discretion of the Contractor. 2 - Surveys, Setting-out and LevelsREVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
A9.2 Particulars shall be given where the nature or extent of the sundry items is not at the discretion of the Contractor. 3 - Dust Control, Pest Control and Lightning ProtectionREVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
A9.2 Particulars shall be given where the nature or extent of the sundry items is not at the discretion of the Contractor. 4 - Off site storageREVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
A9.2 Particulars shall be given where the nature or extent of the sundry items is not at the discretion of the Contractor. 5 - Packing, marking, storage, handling and unpackingREVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
A9.2 Particulars shall be given where the nature or extent of the sundry items is not at the discretion of the Contractor. 6 - Specialist Third Party Testing, Commissioning and CertificationREVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
A9.2 Particulars shall be given where the nature or extent of the sundry items is not at the discretion of the Contractor. 7 - Shop DrawingsREVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
A9.2 Particulars shall be given where the nature or extent of the sundry items is not at the discretion of the Contractor. 8 - Submittal program, drawings and revisionsREVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
A9.2 Particulars shall be given where the nature or extent of the sundry items is not at the discretion of the Contractor. 9 - Method StatementsREVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
A9.2 Particulars shall be given where the nature or extent of the sundry items is not at the discretion of the Contractor. 10 - Operation and Maintenance ManualsREVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
A9.2 Particulars shall be given where the nature or extent of the sundry items is not at the discretion of the Contractor. 11 - Building Information Modelling (BIM) SystemREVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
A9.2 Particulars shall be given where the nature or extent of the sundry items is not at the discretion of the Contractor. 12 - Project Management System - UnifierREVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
A9.2 Particulars shall be given where the nature or extent of the sundry items is not at the discretion of the Contractor. 12 - Internet connection requirements on siteREVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
A9.2 Particulars shall be given where the nature or extent of the sundry items is not at the discretion of the Contractor. 13 - Precautions against FireREVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
A9.2 Particulars shall be given where the nature or extent of the sundry items is not at the discretion of the Contractor. 15 - Project Health, Safety, Environment and Security GuidelinesREVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
A9.2 Particulars shall be given where the nature or extent of the sundry items is not at the discretion of the Contractor. 16 - General cleaning and waste disposal during constructionREVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
A9.2 Particulars shall be given where the nature or extent of the sundry items is not at the discretion of the Contractor. 17 - Final Cleaning for Project HandoverREVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
A9.2 Particulars shall be given where the nature or extent of the sundry items is not at the discretion of the Contractor. 18 - Provision of Handover DocumentationREVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
A9.2 Particulars shall be given where the nature or extent of the sundry items is not at the discretion of the Contractor. 19 - Contract Spares/Attic stockREVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
A9.2 Particulars shall be given where the nature or extent of the sundry items is not at the discretion of the Contractor. 20 - As-built drawingsREVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
A9.2 Particulars shall be given where the nature or extent of the sundry items is not at the discretion of the Contractor. 21 - Design of the Works to the extent provided for in the ContractREVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
A9.2 Particulars shall be given where the nature or extent of the sundry items is not at the discretion of the Contractor. 22 - WarrantiesREVIEWThe source prints neither a quantity nor a rate and the Amount cell holds 0.00 — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | 0.00 | Needs review | |
A9.2 Particulars shall be given where the nature or extent of the sundry items is not at the discretion of the Contractor. 23 - All mock-ups, prototypes and samples required by the Specification, the Drawings and the Schedule of Project RequirementsREVIEWAmount column prints "Included" — counted as 0.00 in the totals, exactly as the source's own page total does. Confirm this is intended (e.g. a RATE ONLY schedule). | — | Item | — | —Included | Needs review | |
Additional Items Any items that may not be covered elsewhere in the Bills of Quantities which the Tenderer deemed to be necessary in order to carry out the works in full compliance with the SOPR must be itemised and price belowREVIEWThe source prints neither a quantity nor a rate and the Amount cell is empty — this line carries no money into the totals. An empty rate is not a rate of zero: confirm the bidder meant to leave it unpriced (covered elsewhere), or put it to them as a clarification. | — | Item | — | — | Needs review | |
POURED CONCRETE 0/1 clear399,171.08 Σ lines | ||||||
Reinforced concrete; concrete grade C56/70 Coupling beamsREVIEWReference sequence restarts at "A" on 2 - Main/6 without a heading change — a governing heading may have been missed above it. | 812 | m3 | 491.59 | 399,171.08 | Needs review | |
SUNDRIES 0/48 clear61,349.65 Σ lines | ||||||
Joints in masonry; including fire resistant compressible joint filler, sealant, angle head restraints, telescopic, sleeved and/or debonded ties and the like Dowelled control jointsREVIEWAmount column prints "Included in item A-L" — counted as 0.00 in the totals, exactly as the source's own page total does. Confirm this is intended (e.g. a RATE ONLY schedule). | 1 | Item | 0.00 | 0.00Included in item A-L | Needs review | |
Joints in masonry; including fire resistant compressible joint filler, sealant, angle head restraints, telescopic, sleeved and/or debonded ties and the like Isolation jointsREVIEWAmount column prints "Included in item A-L" — counted as 0.00 in the totals, exactly as the source's own page total does. Confirm this is intended (e.g. a RATE ONLY schedule). | 1 | Item | 0.00 | 0.00Included in item A-L | Needs review | |
| Allow for providing shop drawings, as built drawings and material submittal approvals REVIEWAmount column prints "Included in Lift Price" — counted as 0.00 in the totals, exactly as the source's own page total does. Confirm this is intended (e.g. a RATE ONLY schedule). | 0 | Item | 0.00 | 0.00Included in Lift Price | Needs review | |
| Allow for providing catalogues, operation and maintenance manuals REVIEWAmount column prints "Included in Lift Price" — counted as 0.00 in the totals, exactly as the source's own page total does. Confirm this is intended (e.g. a RATE ONLY schedule). | 0 | Item | 0.00 | 0.00Included in Lift Price | Needs review | |
| Allow for labeling, tagging of equipment with their related control panel and components as specified REVIEWAmount column prints "Included in Lift Price" — counted as 0.00 in the totals, exactly as the source's own page total does. Confirm this is intended (e.g. a RATE ONLY schedule). | 0 | Item | 0.00 | 0.00Included in Lift Price | Needs review | |
| Allow for testing and commissioning the complete installation REVIEWAmount column prints "Included in Lift Price" — counted as 0.00 in the totals, exactly as the source's own page total does. Confirm this is intended (e.g. a RATE ONLY schedule). | 0 | Item | 0.00 | 0.00Included in Lift Price | Needs review | |
| Allow for all connections to existing services mains REVIEWAmount column prints "Included" — counted as 0.00 in the totals, exactly as the source's own page total does. Confirm this is intended (e.g. a RATE ONLY schedule). | 0 | Item | 0.00 | 0.00Included | Needs review | |
| Allow for earthing and bonding as specified; in particular all ductwork systems shall be provided with earth continuity protection at all joints REVIEWAmount column prints "Included" — counted as 0.00 in the totals, exactly as the source's own page total does. Confirm this is intended (e.g. a RATE ONLY schedule). | 0 | Item | 0.00 | 0.00Included | Needs review | |
| Allow for all supports, fixings, anchors, insulating blocks and anti-vibration devices where not included above or elsewhere REVIEWAmount column prints "Included" — counted as 0.00 in the totals, exactly as the source's own page total does. Confirm this is intended (e.g. a RATE ONLY schedule). | 0 | Item | 0.00 | 0.00Included | Needs review | |
| Allow for all identification including painting, marking and labeling, including labeling all valves REVIEWAmount column prints "Included" — counted as 0.00 in the totals, exactly as the source's own page total does. Confirm this is intended (e.g. a RATE ONLY schedule). | 0 | Item | 0.00 | 0.00Included | Needs review | |
| Allow for flushing, cleaning, sterilization and chlorination of the completed installations as necessary REVIEWAmount column prints "Included" — counted as 0.00 in the totals, exactly as the source's own page total does. Confirm this is intended (e.g. a RATE ONLY schedule). | 0 | Item | 0.00 | 0.00Included | Needs review | |
| Allow for inspection, testing and commissioning including all off-site and factory testing; inspections to demonstrate compliance with relevant specifications and standards; operating the completed installations; submitting all relevant test record sheets at the completion of the installations REVIEWAmount column prints "Included" — counted as 0.00 in the totals, exactly as the source's own page total does. Confirm this is intended (e.g. a RATE ONLY schedule). | 0 | Item | 0.00 | 0.00Included | Needs review | |
| Allow for providing in suitable quantities all special tools, operating handles and keys or other equipment necessary for installation, maintenance or operation of the completed installations REVIEWAmount column prints "Included" — counted as 0.00 in the totals, exactly as the source's own page total does. Confirm this is intended (e.g. a RATE ONLY schedule). | 0 | Item | 0.00 | 0.00Included | Needs review | |
| Allow for providing comprehensive equipment documentation including operating instructions and maintenance manuals, record documents, warranties, guarantees, drawings and the like REVIEWAmount column prints "Included" — counted as 0.00 in the totals, exactly as the source's own page total does. Confirm this is intended (e.g. a RATE ONLY schedule). | 0 | Item | 0.00 | 0.00Included | Needs review | |
| Allow for vibration and noise control where not included above or elsewhere REVIEWAmount column prints "Included" — counted as 0.00 in the totals, exactly as the source's own page total does. Confirm this is intended (e.g. a RATE ONLY schedule). | 0 | Item | 0.00 | 0.00Included | Needs review | |
| Allow for all supports, fixings, anchors and insulating blocks where not included above or elsewhere REVIEWAmount column prints "Included" — counted as 0.00 in the totals, exactly as the source's own page total does. Confirm this is intended (e.g. a RATE ONLY schedule). | 0 | Item | 0.00 | 0.00Included | Needs review | |
| Allow for all identification including painting, marking and labeling REVIEWAmount column prints "Included" — counted as 0.00 in the totals, exactly as the source's own page total does. Confirm this is intended (e.g. a RATE ONLY schedule). | 0 | Item | 0.00 | 0.00Included | Needs review | |
| Allow for inspection, testing and commissioning including all off-site and factory testing; inspections to demonstrate compliance with relevant specifications and standards; operating the completed installations; submitting all relevant test record sheets at the completion of the installations REVIEWAmount column prints "Included" — counted as 0.00 in the totals, exactly as the source's own page total does. Confirm this is intended (e.g. a RATE ONLY schedule). | 0 | Item | 0.00 | 0.00Included | Needs review | |
| Allow for providing in suitable quantities all special tools, operating handles and keys or other equipment necessary for installation, maintenance or operation of the completed installation REVIEWAmount column prints "Included" — counted as 0.00 in the totals, exactly as the source's own page total does. Confirm this is intended (e.g. a RATE ONLY schedule). | 0 | Item | 0.00 | 0.00Included | Needs review | |
| Allow for providing comprehensive equipment documentation including operating instructions and maintenance manuals, record documents, warranties, guarantees, drawings and the like REVIEWAmount column prints "Included" — counted as 0.00 in the totals, exactly as the source's own page total does. Confirm this is intended (e.g. a RATE ONLY schedule). | 0 | Item | 0.00 | 0.00Included | Needs review | |
| Allow for planting edging REVIEW"Allow for planting edging" has no heading context while other items on 3 - Ext/4 do — a governing heading may have been missed. | 1 | Item | 61,349.65 | 61,349.65 | Needs review | |
| Allow for all supports, fixings, anchors and insulating blocks where not included above or elsewhere REVIEWAmount column prints "Included" — counted as 0.00 in the totals, exactly as the source's own page total does. Confirm this is intended (e.g. a RATE ONLY schedule). | 0 | Item | 0.00 | 0.00Included | Needs review | |
| Allow for all identification including painting, marking and labelling REVIEWAmount column prints "Included" — counted as 0.00 in the totals, exactly as the source's own page total does. Confirm this is intended (e.g. a RATE ONLY schedule). | 0 | Item | 0.00 | 0.00Included | Needs review | |
| Allow for inspection, testing and commissioning including all off-site and factory testing; inspections to demonstrate compliance with relevant specifications and standards; operating the completed installations; submitting all relevant test record sheets at the completion of the installations REVIEWAmount column prints "Included" — counted as 0.00 in the totals, exactly as the source's own page total does. Confirm this is intended (e.g. a RATE ONLY schedule). | 0 | Item | 0.00 | 0.00Included | Needs review | |
| Allow for providing in suitable quantities all special tools, operating handles and keys or other equipment necessary for installation, maintenance or operation of the completed installation REVIEWAmount column prints "Included" — counted as 0.00 in the totals, exactly as the source's own page total does. Confirm this is intended (e.g. a RATE ONLY schedule). | 0 | Item | 0.00 | 0.00Included | Needs review | |
| Allow for providing comprehensive equipment documentation including operating instructions and maintenance manuals, record documents, warranties, guarantees, drawings and the like REVIEWAmount column prints "Included" — counted as 0.00 in the totals, exactly as the source's own page total does. Confirm this is intended (e.g. a RATE ONLY schedule). | 0 | Item | 0.00 | 0.00Included | Needs review | |
Work Incidental to Mechanical Engineering Installations Allow for planning and coordinating with relevant statutory authorities and with all other tradesREVIEWAmount column prints "Included" — counted as 0.00 in the totals, exactly as the source's own page total does. Confirm this is intended (e.g. a RATE ONLY schedule). | 0 | Item | 0.00 | 0.00Included | Needs review | |
Work Incidental to Mechanical Engineering Installations Allow for liaison with obtaining approvals and attendance on approved Authorities, other statutory bodies and service providers as requiredREVIEWAmount column prints "Included" — counted as 0.00 in the totals, exactly as the source's own page total does. Confirm this is intended (e.g. a RATE ONLY schedule). | 0 | Item | 0.00 | 0.00Included | Needs review | |
Work Incidental to Mechanical Engineering Installations Allow for all incidental work including factory finishing, fixing to all backgrounds by appropriate means and all making goodREVIEWAmount column prints "Included" — counted as 0.00 in the totals, exactly as the source's own page total does. Confirm this is intended (e.g. a RATE ONLY schedule). | 0 | Item | 0.00 | 0.00Included | Needs review | |
Work Incidental to Mechanical Engineering Installations Allow for supplying and fixing all brackets, clamps and other fixing devices including building in or cutting and pinning and all making goodREVIEWAmount column prints "Included" — counted as 0.00 in the totals, exactly as the source's own page total does. Confirm this is intended (e.g. a RATE ONLY schedule). | 0 | Item | 0.00 | 0.00Included | Needs review | |
Work Incidental to Mechanical Engineering Installations Allow for training the Employer's Staff to operate and maintain the Mechanical Engineering InstallationsREVIEWAmount column prints "Included" — counted as 0.00 in the totals, exactly as the source's own page total does. Confirm this is intended (e.g. a RATE ONLY schedule). | 0 | Item | 0.00 | 0.00Included | Needs review | |
Work Incidental to Mechanical Engineering Installations Allow for all incidental work to the Mechanical Engineering Installations where not included above or elsewhereREVIEWAmount column prints "Included" — counted as 0.00 in the totals, exactly as the source's own page total does. Confirm this is intended (e.g. a RATE ONLY schedule). | 0 | Item | 0.00 | 0.00Included | Needs review | |
Builders work in connection (BWIC) with Mechanical Engineering Installations Allow for all BWIC with Mechanical Engineering Installations where not included above or elsewhereREVIEWAmount column prints "Included" — counted as 0.00 in the totals, exactly as the source's own page total does. Confirm this is intended (e.g. a RATE ONLY schedule). | 0 | Item | 0.00 | 0.00Included | Needs review | |
| Allow for earthing and bonding as specified; in particular all metal containments shall be REVIEWAmount column prints "Included" — counted as 0.00 in the totals, exactly as the source's own page total does. Confirm this is intended (e.g. a RATE ONLY schedule). | 0 | Item | 0.00 | 0.00Included | Needs review | |
| Allow for all supports, fixings, anchors and insulating blocks where not included above or elsewhere REVIEWAmount column prints "Included" — counted as 0.00 in the totals, exactly as the source's own page total does. Confirm this is intended (e.g. a RATE ONLY schedule). | 0 | Item | 0.00 | 0.00Included | Needs review | |
| loading more… 150 of 605 lines rendered | ||||||
| Item | Description | Qty | Unit | Rate | Amount | State |
|---|---|---|---|---|---|---|
Section 2/C · SECTION C - CONCRETE WORKS · Page 2/C/1 - 2/C/12 0/1 clear399,171.08 Σ lines | ||||||
Reinforced concrete; concrete grade C56/70 Coupling beamsREVIEWReference sequence restarts at "A" on 2 - Main/6 without a heading change — a governing heading may have been missed above it. | 812 | m3 | 491.59 | 399,171.08 | Needs review | |
Section 2/D · SECTION D - MASONRY · Page 2/D/1 - 2/D/4 0/2 clear0.00 Σ lines | ||||||
Joints in masonry; including fire resistant compressible joint filler, sealant, angle head restraints, telescopic, sleeved and/or debonded ties and the like Dowelled control jointsREVIEWAmount column prints "Included in item A-L" — counted as 0.00 in the totals, exactly as the source's own page total does. Confirm this is intended (e.g. a RATE ONLY schedule). | 1 | Item | 0.00 | 0.00Included in item A-L | Needs review | |
Joints in masonry; including fire resistant compressible joint filler, sealant, angle head restraints, telescopic, sleeved and/or debonded ties and the like Isolation jointsREVIEWAmount column prints "Included in item A-L" — counted as 0.00 in the totals, exactly as the source's own page total does. Confirm this is intended (e.g. a RATE ONLY schedule). | 1 | Item | 0.00 | 0.00Included in item A-L | Needs review | |
Section 2/F · SECTION F - WOOD WORK · Page 2/F/1 - 2/F/25 0/59 clear0.00 Σ lines | ||||||
Kitchen cabinets; including countertop, forming of holes, frames, carcass, supports, front/back/side panels, doors, shelves, drawers, concealed light (measured separately), skirting, hardware, finishes, accessories and all ancillary works as necessary Type 1; base unit; size 3395 x 640 x 900mm highREVIEWAmount column prints "Included in Item-A&B" — counted as 0.00 in the totals, exactly as the source's own page total does. Confirm this is intended (e.g. a RATE ONLY schedule). | 2 | Nr. | 0.00 | 0.00Included in Item-A&B | Needs review | |
Kitchen cabinets; including countertop, forming of holes, frames, carcass, supports, front/back/side panels, doors, shelves, drawers, concealed light (measured separately), skirting, hardware, finishes, accessories and all ancillary works as necessary Type 1; wall unit; size 2540 x 350 x 1100mm highREVIEWAmount column prints "Included in Item-A&B" — counted as 0.00 in the totals, exactly as the source's own page total does. Confirm this is intended (e.g. a RATE ONLY schedule). | 143 | Nr. | 0.00 | 0.00Included in Item-A&B | Needs review | |
Kitchen cabinets; including countertop, forming of holes, frames, carcass, supports, front/back/side panels, doors, shelves, drawers, concealed light (measured separately), skirting, hardware, finishes, accessories and all ancillary works as necessary Extra over for glass unit; size 1040 x 350 x 1100mm highREVIEWAmount column prints "Included in Item-A&B" — counted as 0.00 in the totals, exactly as the source's own page total does. Confirm this is intended (e.g. a RATE ONLY schedule). | 143 | Nr. | 0.00 | 0.00Included in Item-A&B | Needs review | |
Kitchen cabinets; including countertop, forming of holes, frames, carcass, supports, front/back/side panels, doors, shelves, drawers, concealed light (measured separately), skirting, hardware, finishes, accessories and all ancillary works as necessary Type 1; full unit; size 630 x 615 x 2600mm highREVIEWAmount column prints "Included in Item-A&B" — counted as 0.00 in the totals, exactly as the source's own page total does. Confirm this is intended (e.g. a RATE ONLY schedule). | 2 | Nr. | 0.00 | 0.00Included in Item-A&B | Needs review | |
Kitchen cabinets; including countertop, forming of holes, frames, carcass, supports, front/back/side panels, doors, shelves, drawers, concealed light (measured separately), skirting, hardware, finishes, accessories and all ancillary works as necessary Type 1; full unit; size 1080 x 615 x 2600mm highREVIEWAmount column prints "Included in Item-A&B" — counted as 0.00 in the totals, exactly as the source's own page total does. Confirm this is intended (e.g. a RATE ONLY schedule). | 141 | Nr. | 0.00 | 0.00Included in Item-A&B | Needs review | |
Kitchen cabinets; including countertop, forming of holes, frames, carcass, supports, front/back/side panels, doors, shelves, drawers, concealed light (measured separately), skirting, hardware, finishes, accessories and all ancillary works as necessary Type 2; wall unit; size (2520+1750) x 350 x 1100mm high; L-shapedREVIEWAmount column prints "Included in Item-L&M" — counted as 0.00 in the totals, exactly as the source's own page total does. Confirm this is intended (e.g. a RATE ONLY schedule). | 328 | Nr. | 0.00 | 0.00Included in Item-L&M | Needs review | |
Kitchen cabinets; including countertop, forming of holes, frames, carcass, supports, front/back/side panels, doors, shelves, drawers, concealed light (measured separately), skirting, hardware, finishes, accessories and all ancillary works as necessary Type 2; wall unit; size (2650+1480) x 350 x 1100mm high; L-shapedREVIEWAmount column prints "Included in Item-L&M" — counted as 0.00 in the totals, exactly as the source's own page total does. Confirm this is intended (e.g. a RATE ONLY schedule). | 192 | Nr. | 0.00 | 0.00Included in Item-L&M | Needs review | |
Kitchen cabinets; including countertop, forming of holes, frames, carcass, supports, front/back/side panels, doors, shelves, drawers, concealed light (measured separately), skirting, hardware, finishes, accessories and all ancillary works as necessary Extra over for glass unit; size 330 x 350 x 1100mm highREVIEWAmount column prints "Included in Item-L&M" — counted as 0.00 in the totals, exactly as the source's own page total does. Confirm this is intended (e.g. a RATE ONLY schedule). | 1,040 | Nr. | 0.00 | 0.00Included in Item-L&M | Needs review | |
Kitchen cabinets; including countertop, forming of holes, frames, carcass, supports, front/back/side panels, doors, shelves, drawers, concealed light (measured separately), skirting, hardware, finishes, accessories and all ancillary works as necessary Type 2; full unit; size 600 x 615 x 2600mm highREVIEWAmount column prints "Included in Item-L&M" — counted as 0.00 in the totals, exactly as the source's own page total does. Confirm this is intended (e.g. a RATE ONLY schedule). | 520 | Nr. | 0.00 | 0.00Included in Item-L&M | Needs review | |
Kitchen cabinets; including countertop, forming of holes, frames, carcass, supports, front/back/side panels, doors, shelves, drawers, concealed light (measured separately), skirting, hardware, finishes, accessories and all ancillary works as necessary Type 3; wall unit; size 560 1375 x 350 x 1100mm highREVIEWAmount column prints "Included in Item-C" — counted as 0.00 in the totals, exactly as the source's own page total does. Confirm this is intended (e.g. a RATE ONLY schedule). | 364 | Nr. | 0.00 | 0.00Included in Item-C | Needs review | |
Kitchen cabinets; including countertop, forming of holes, frames, carcass, supports, front/back/side panels, doors, shelves, drawers, concealed light (measured separately), skirting, hardware, finishes, accessories and all ancillary works as necessary Type 3; wall unit; size 1690 x 350 x 1100mm highREVIEWAmount column prints "Included in Item-C" — counted as 0.00 in the totals, exactly as the source's own page total does. Confirm this is intended (e.g. a RATE ONLY schedule). | 364 | Nr. | 0.00 | 0.00Included in Item-C | Needs review | |
Kitchen cabinets; including countertop, forming of holes, frames, carcass, supports, front/back/side panels, doors, shelves, drawers, concealed light (measured separately), skirting, hardware, finishes, accessories and all ancillary works as necessary Extra over for glass unit; size 880 x 350 x 1100mm highREVIEWAmount column prints "Included in Item-C" — counted as 0.00 in the totals, exactly as the source's own page total does. Confirm this is intended (e.g. a RATE ONLY schedule). | 364 | Nr. | 0.00 | 0.00Included in Item-C | Needs review | |
Kitchen cabinets; including countertop, forming of holes, frames, carcass, supports, front/back/side panels, doors, shelves, drawers, concealed light (measured separately), skirting, hardware, finishes, accessories and all ancillary works as necessary Type 3; full unit; size 600 x 615 x 2600mm highREVIEWAmount column prints "Included in Item-C" — counted as 0.00 in the totals, exactly as the source's own page total does. Confirm this is intended (e.g. a RATE ONLY schedule). | 364 | Nr. | 0.00 | 0.00Included in Item-C | Needs review | |
Kitchen cabinets; including countertop, forming of holes, frames, carcass, supports, front/back/side panels, doors, shelves, drawers, concealed light (measured separately), skirting, hardware, finishes, accessories and all ancillary works as necessary Type 4; wall unit; size (3190+1140) x 350 x 1100mm high; L-shapedREVIEWAmount column prints "Included in Item-J&K" — counted as 0.00 in the totals, exactly as the source's own page total does. Confirm this is intended (e.g. a RATE ONLY schedule). | 49 | Nr. | 0.00 | 0.00Included in Item-J&K | Needs review | |
Kitchen cabinets; including countertop, forming of holes, frames, carcass, supports, front/back/side panels, doors, shelves, drawers, concealed light (measured separately), skirting, hardware, finishes, accessories and all ancillary works as necessary Extra over for glass unit; size 590 x 350 x 1070mm highREVIEWAmount column prints "Included in Item-J&K" — counted as 0.00 in the totals, exactly as the source's own page total does. Confirm this is intended (e.g. a RATE ONLY schedule). | 49 | Nr. | 0.00 | 0.00Included in Item-J&K | Needs review | |
Kitchen cabinets; including countertop, forming of holes, frames, carcass, supports, front/back/side panels, doors, shelves, drawers, concealed light (measured separately), skirting, hardware, finishes, accessories and all ancillary works as necessary Type 4; full unit; size 600 x 615 x 2600mm highREVIEWAmount column prints "Included in Item-J&K" — counted as 0.00 in the totals, exactly as the source's own page total does. Confirm this is intended (e.g. a RATE ONLY schedule). | 49 | Nr. | 0.00 | 0.00Included in Item-J&K | Needs review | |
Kitchen cabinets; including countertop, forming of holes, frames, carcass, supports, front/back/side panels, doors, shelves, drawers, concealed light (measured separately), skirting, hardware, finishes, accessories and all ancillary works as necessary Type 5; wall unit; size 3660 x 350 x 1100mm highREVIEWAmount column prints "Included in Item-P" — counted as 0.00 in the totals, exactly as the source's own page total does. Confirm this is intended (e.g. a RATE ONLY schedule). | 736 | Nr. | 0.00 | 0.00Included in Item-P | Needs review | |
Kitchen cabinets; including countertop, forming of holes, frames, carcass, supports, front/back/side panels, doors, shelves, drawers, concealed light (measured separately), skirting, hardware, finishes, accessories and all ancillary works as necessary Extra over for glass unit; size 460 x 350 x 1070mm highREVIEWAmount column prints "Included in Item-P" — counted as 0.00 in the totals, exactly as the source's own page total does. Confirm this is intended (e.g. a RATE ONLY schedule). | 738 | Nr. | 0.00 | 0.00Included in Item-P | Needs review | |
Kitchen cabinets; including countertop, forming of holes, frames, carcass, supports, front/back/side panels, doors, shelves, drawers, concealed light (measured separately), skirting, hardware, finishes, accessories and all ancillary works as necessary Type 5; full unit; size 600 x 615 x 2600mm highREVIEWAmount column prints "Included in Item-P" — counted as 0.00 in the totals, exactly as the source's own page total does. Confirm this is intended (e.g. a RATE ONLY schedule). | 2 | Nr. | 0.00 | 0.00Included in Item-P | Needs review | |
Kitchen cabinets; including countertop, forming of holes, frames, carcass, supports, front/back/side panels, doors, shelves, drawers, concealed light (measured separately), skirting, hardware, finishes, accessories and all ancillary works as necessary Type 5; full unit; size 1050 x 615 x 2600mm highREVIEWAmount column prints "Included in Item-P" — counted as 0.00 in the totals, exactly as the source's own page total does. Confirm this is intended (e.g. a RATE ONLY schedule). | 367 | Nr. | 0.00 | 0.00Included in Item-P | Needs review | |
Kitchen cabinets; including countertop, forming of holes, frames, carcass, supports, front/back/side panels, doors, shelves, drawers, concealed light (measured separately), skirting, hardware, finishes, accessories and all ancillary works as necessary Type 6; base unit; size 1895 x 630 x 900mm highREVIEWAmount column prints "Included in Item-V" — counted as 0.00 in the totals, exactly as the source's own page total does. Confirm this is intended (e.g. a RATE ONLY schedule). | 2 | Nr. | 0.00 | 0.00Included in Item-V | Needs review | |
Kitchen cabinets; including countertop, forming of holes, frames, carcass, supports, front/back/side panels, doors, shelves, drawers, concealed light (measured separately), skirting, hardware, finishes, accessories and all ancillary works as necessary Type 6; wall unit; size 1635 x 350 x 1100mm highREVIEWAmount column prints "Included in Item-V" — counted as 0.00 in the totals, exactly as the source's own page total does. Confirm this is intended (e.g. a RATE ONLY schedule). | 2 | Nr. | 0.00 | 0.00Included in Item-V | Needs review | |
Kitchen cabinets; including countertop, forming of holes, frames, carcass, supports, front/back/side panels, doors, shelves, drawers, concealed light (measured separately), skirting, hardware, finishes, accessories and all ancillary works as necessary Type 6; full unit; size 600 x 615 x 2600mm highREVIEWAmount column prints "Included in Item-V" — counted as 0.00 in the totals, exactly as the source's own page total does. Confirm this is intended (e.g. a RATE ONLY schedule). | 2 | Nr. | 0.00 | 0.00Included in Item-V | Needs review | |
Kitchen cabinets; including countertop, forming of holes, frames, carcass, supports, front/back/side panels, doors, shelves, drawers, concealed light (measured separately), skirting, hardware, finishes, accessories and all ancillary works as necessary Type 7; wall unit; size 2610 x 350 x 1100mm highREVIEWAmount column prints "Included in Item-E&F" — counted as 0.00 in the totals, exactly as the source's own page total does. Confirm this is intended (e.g. a RATE ONLY schedule). | 5 | Nr. | 0.00 | 0.00Included in Item-E&F | Needs review | |
Kitchen cabinets; including countertop, forming of holes, frames, carcass, supports, front/back/side panels, doors, shelves, drawers, concealed light (measured separately), skirting, hardware, finishes, accessories and all ancillary works as necessary Type 7; wall unit; size 2640 x 350 x 1100mm highREVIEWAmount column prints "Included in Item-E&F" — counted as 0.00 in the totals, exactly as the source's own page total does. Confirm this is intended (e.g. a RATE ONLY schedule). | 194 | Nr. | 0.00 | 0.00Included in Item-E&F | Needs review | |
Kitchen cabinets; including countertop, forming of holes, frames, carcass, supports, front/back/side panels, doors, shelves, drawers, concealed light (measured separately), skirting, hardware, finishes, accessories and all ancillary works as necessary Extra over for glass unit; size 485 x 350 x 1070mm highREVIEWAmount column prints "Included in Item-E&F" — counted as 0.00 in the totals, exactly as the source's own page total does. Confirm this is intended (e.g. a RATE ONLY schedule). | 398 | Nr. | 0.00 | 0.00Included in Item-E&F | Needs review | |
Kitchen cabinets; including countertop, forming of holes, frames, carcass, supports, front/back/side panels, doors, shelves, drawers, concealed light (measured separately), skirting, hardware, finishes, accessories and all ancillary works as necessary Type 7; full unit; size 600 x 615 x 2600mm highREVIEWAmount column prints "Included in Item-E&F" — counted as 0.00 in the totals, exactly as the source's own page total does. Confirm this is intended (e.g. a RATE ONLY schedule). | 194 | Nr. | 0.00 | 0.00Included in Item-E&F | Needs review | |
Kitchen cabinets; including countertop, forming of holes, frames, carcass, supports, front/back/side panels, doors, shelves, drawers, concealed light (measured separately), skirting, hardware, finishes, accessories and all ancillary works as necessary Type 7; full unit; size 1050 x 615 x 2600mm highREVIEWAmount column prints "Included in Item-E&F" — counted as 0.00 in the totals, exactly as the source's own page total does. Confirm this is intended (e.g. a RATE ONLY schedule). | 5 | Nr. | 0.00 | 0.00Included in Item-E&F | Needs review | |
Kitchen cabinets; including countertop, forming of holes, frames, carcass, supports, front/back/side panels, doors, shelves, drawers, concealed light (measured separately), skirting, hardware, finishes, accessories and all ancillary works as necessary Type 8; base unit; size 2830 x 630 x 900mm highREVIEWAmount column prints "Included in Item-P" — counted as 0.00 in the totals, exactly as the source's own page total does. Confirm this is intended (e.g. a RATE ONLY schedule). | 46 | Nr. | 0.00 | 0.00Included in Item-P | Needs review | |
Kitchen cabinets; including countertop, forming of holes, frames, carcass, supports, front/back/side panels, doors, shelves, drawers, concealed light (measured separately), skirting, hardware, finishes, accessories and all ancillary works as necessary Type 8; wall unit; size 1480 x 350 x 1100mm highREVIEWAmount column prints "Included in Item-P" — counted as 0.00 in the totals, exactly as the source's own page total does. Confirm this is intended (e.g. a RATE ONLY schedule). | 92 | Nr. | 0.00 | 0.00Included in Item-P | Needs review | |
Kitchen cabinets; including countertop, forming of holes, frames, carcass, supports, front/back/side panels, doors, shelves, drawers, concealed light (measured separately), skirting, hardware, finishes, accessories and all ancillary works as necessary Type 8; full unit; size 630 x 615 x 2600mm highREVIEWAmount column prints "Included in Item-P" — counted as 0.00 in the totals, exactly as the source's own page total does. Confirm this is intended (e.g. a RATE ONLY schedule). | 46 | Nr. | 0.00 | 0.00Included in Item-P | Needs review | |
Kitchen cabinets; including countertop, forming of holes, frames, carcass, supports, front/back/side panels, doors, shelves, drawers, concealed light (measured separately), skirting, hardware, finishes, accessories and all ancillary works as necessary Type 9; wall unit; size (2440+1835) x 350 x 1100mm high; L-shapedREVIEWAmount column prints "Included in Item-B" — counted as 0.00 in the totals, exactly as the source's own page total does. Confirm this is intended (e.g. a RATE ONLY schedule). | 5 | Nr. | 0.00 | 0.00Included in Item-B | Needs review | |
Kitchen cabinets; including countertop, forming of holes, frames, carcass, supports, front/back/side panels, doors, shelves, drawers, concealed light (measured separately), skirting, hardware, finishes, accessories and all ancillary works as necessary Extra over for glass unit; size 640 x 350 x 1070mm highREVIEWAmount column prints "Included in Item-B" — counted as 0.00 in the totals, exactly as the source's own page total does. Confirm this is intended (e.g. a RATE ONLY schedule). | 5 | Nr. | 0.00 | 0.00Included in Item-B | Needs review | |
Kitchen cabinets; including countertop, forming of holes, frames, carcass, supports, front/back/side panels, doors, shelves, drawers, concealed light (measured separately), skirting, hardware, finishes, accessories and all ancillary works as necessary Type 9; full unit; size 1080 x 615 x 2600mm highREVIEWAmount column prints "Included in Item-B" — counted as 0.00 in the totals, exactly as the source's own page total does. Confirm this is intended (e.g. a RATE ONLY schedule). | 5 | Nr. | 0.00 | 0.00Included in Item-B | Needs review | |
Kitchen cabinets; to show kitchen; including countertop, forming of holes, frames, carcass, supports, front/back/side panels, doors, shelves, drawers, concealed light (measured separately), skirting, hardware, finishes, accessories and all ancillary works as necessary Type 10; base unit; size 2255 x 630 x 900mm highREVIEWAmount column prints "Included in Item-G,H&J" — counted as 0.00 in the totals, exactly as the source's own page total does. Confirm this is intended (e.g. a RATE ONLY schedule). | 26 | Nr. | 0.00 | 0.00Included in Item-G,H&J | Needs review | |
Kitchen cabinets; to show kitchen; including countertop, forming of holes, frames, carcass, supports, front/back/side panels, doors, shelves, drawers, concealed light (measured separately), skirting, hardware, finishes, accessories and all ancillary works as necessary Type 10; base unit; size 2400 x 630 x 900mm highREVIEWAmount column prints "Included in Item-G,H&J" — counted as 0.00 in the totals, exactly as the source's own page total does. Confirm this is intended (e.g. a RATE ONLY schedule). | 4 | Nr. | 0.00 | 0.00Included in Item-G,H&J | Needs review | |
Kitchen cabinets; to show kitchen; including countertop, forming of holes, frames, carcass, supports, front/back/side panels, doors, shelves, drawers, concealed light (measured separately), skirting, hardware, finishes, accessories and all ancillary works as necessary Type 10; full unit; size 660 x 615 x 2700mm highREVIEWAmount column prints "Included in Item-G,H&J" — counted as 0.00 in the totals, exactly as the source's own page total does. Confirm this is intended (e.g. a RATE ONLY schedule). | 20 | Nr. | 0.00 | 0.00Included in Item-G,H&J | Needs review | |
Kitchen cabinets; to show kitchen; including countertop, forming of holes, frames, carcass, supports, front/back/side panels, doors, shelves, drawers, concealed light (measured separately), skirting, hardware, finishes, accessories and all ancillary works as necessary Type 10; wall unit; size 2255 x 350 x 1210mm highREVIEWAmount column prints "Included in Item-G,H&J" — counted as 0.00 in the totals, exactly as the source's own page total does. Confirm this is intended (e.g. a RATE ONLY schedule). | 26 | Nr. | 0.00 | 0.00Included in Item-G,H&J | Needs review | |
Kitchen cabinets; to show kitchen; including countertop, forming of holes, frames, carcass, supports, front/back/side panels, doors, shelves, drawers, concealed light (measured separately), skirting, hardware, finishes, accessories and all ancillary works as necessary Type 10; wall unit; size 2440 x 350 x 1210mm highREVIEWAmount column prints "Included in Item-G,H&J" — counted as 0.00 in the totals, exactly as the source's own page total does. Confirm this is intended (e.g. a RATE ONLY schedule). | 4 | Nr. | 0.00 | 0.00Included in Item-G,H&J | Needs review | |
Kitchen cabinets; to show kitchen; including countertop, forming of holes, frames, carcass, supports, front/back/side panels, doors, shelves, drawers, concealed light (measured separately), skirting, hardware, finishes, accessories and all ancillary works as necessary Extra over for glass unit; size 570 x 350 x 1170mm highREVIEWAmount column prints "Included in Item-G,H&J" — counted as 0.00 in the totals, exactly as the source's own page total does. Confirm this is intended (e.g. a RATE ONLY schedule). | 26 | Nr. | 0.00 | 0.00Included in Item-G,H&J | Needs review | |
Kitchen cabinets; to show kitchen; including countertop, forming of holes, frames, carcass, supports, front/back/side panels, doors, shelves, drawers, concealed light (measured separately), skirting, hardware, finishes, accessories and all ancillary works as necessary Extra over for glass unit; size 640 x 350 x 1170mm highREVIEWAmount column prints "Included in Item-G,H&J" — counted as 0.00 in the totals, exactly as the source's own page total does. Confirm this is intended (e.g. a RATE ONLY schedule). | 30 | Nr. | 0.00 | 0.00Included in Item-G,H&J | Needs review | |
Kitchen cabinets; to show kitchen; including countertop, forming of holes, frames, carcass, supports, front/back/side panels, doors, shelves, drawers, concealed light (measured separately), skirting, hardware, finishes, accessories and all ancillary works as necessary Extra over for glass unit; size 890 x 350 x 1170mm highREVIEWAmount column prints "Included in Item-G,H&J" — counted as 0.00 in the totals, exactly as the source's own page total does. Confirm this is intended (e.g. a RATE ONLY schedule). | 4 | Nr. | 0.00 | 0.00Included in Item-G,H&J | Needs review | |
Kitchen cabinets; to show kitchen; including countertop, forming of holes, frames, carcass, supports, front/back/side panels, doors, shelves, drawers, concealed light (measured separately), skirting, hardware, finishes, accessories and all ancillary works as necessary Type 10; full unit; size 640 x 615 x 2600mm highREVIEWAmount column prints "Included in Item-G,H&J" — counted as 0.00 in the totals, exactly as the source's own page total does. Confirm this is intended (e.g. a RATE ONLY schedule). | 10 | Nr. | 0.00 | 0.00Included in Item-G,H&J | Needs review | |
Kitchen cabinets; to dirty kitchen; including countertop, forming of holes, frames, carcass, supports, front/back/side panels, doors, shelves, drawers, concealed light (measured separately), skirting, hardware, finishes, accessories and all ancillary works as necessary Type 13; wall unit; size 2360 x 615 350 x 825mm highREVIEWAmount column prints "Included in Item-F" — counted as 0.00 in the totals, exactly as the source's own page total does. Confirm this is intended (e.g. a RATE ONLY schedule). | 4 | Nr. | 0.00 | 0.00Included in Item-F | Needs review | |
Kitchen cabinets; to dirty kitchen; including countertop, forming of holes, frames, carcass, supports, front/back/side panels, doors, shelves, drawers, concealed light (measured separately), skirting, hardware, finishes, accessories and all ancillary works as necessary Type 13; wall unit; size 3285 x 615 350 x 825mm highREVIEWAmount column prints "Included in Item-F" — counted as 0.00 in the totals, exactly as the source's own page total does. Confirm this is intended (e.g. a RATE ONLY schedule). | 4 | Nr. | 0.00 | 0.00Included in Item-F | Needs review | |
Kitchen cabinets; to dirty kitchen; including countertop, forming of holes, frames, carcass, supports, front/back/side panels, doors, shelves, drawers, concealed light (measured separately), skirting, hardware, finishes, accessories and all ancillary works as necessary Type 13; wall unit; size 2360 x 615 350 x 825mm highREVIEWAmount column prints "Included in Item-F" — counted as 0.00 in the totals, exactly as the source's own page total does. Confirm this is intended (e.g. a RATE ONLY schedule). | 4 | Nr. | 0.00 | 0.00Included in Item-F | Needs review | |
Kitchen cabinets; to dirty kitchen; including countertop, forming of holes, frames, carcass, supports, front/back/side panels, doors, shelves, drawers, concealed light (measured separately), skirting, hardware, finishes, accessories and all ancillary works as necessary Type 13; wall unit; size 3285 x 615 350 x 825mm highREVIEWAmount column prints "Included in Item-F" — counted as 0.00 in the totals, exactly as the source's own page total does. Confirm this is intended (e.g. a RATE ONLY schedule). | 4 | Nr. | 0.00 | 0.00Included in Item-F | Needs review | |
Kitchen cabinets; to dirty kitchen; including countertop, forming of holes, frames, carcass, supports, front/back/side panels, doors, shelves, drawers, concealed light (measured separately), skirting, hardware, finishes, accessories and all ancillary works as necessary Extra over for glass unit; size 460 x 350 x 1180mm highREVIEWAmount column prints "Included in Item-F" — counted as 0.00 in the totals, exactly as the source's own page total does. Confirm this is intended (e.g. a RATE ONLY schedule). | 4 | Nr. | 0.00 | 0.00Included in Item-F | Needs review | |
Kitchen cabinets; to dirty kitchen; including countertop, forming of holes, frames, carcass, supports, front/back/side panels, doors, shelves, drawers, concealed light (measured separately), skirting, hardware, finishes, accessories and all ancillary works as necessary Extra over for glass unit; size 475 x 350 x 1180mm highREVIEWAmount column prints "Included in Item-F" — counted as 0.00 in the totals, exactly as the source's own page total does. Confirm this is intended (e.g. a RATE ONLY schedule). | 4 | Nr. | 0.00 | 0.00Included in Item-F | Needs review | |
Kitchen cabinets; to dirty kitchen; including countertop, forming of holes, frames, carcass, supports, front/back/side panels, doors, shelves, drawers, concealed light (measured separately), skirting, hardware, finishes, accessories and all ancillary works as necessary Extra over for glass unit; size 780 x 350 x 1180mm highREVIEWAmount column prints "Included in Item-F" — counted as 0.00 in the totals, exactly as the source's own page total does. Confirm this is intended (e.g. a RATE ONLY schedule). | 4 | Nr. | 0.00 | 0.00Included in Item-F | Needs review | |
Kitchen cabinets; to dirty kitchen; including countertop, forming of holes, frames, carcass, supports, front/back/side panels, doors, shelves, drawers, concealed light (measured separately), skirting, hardware, finishes, accessories and all ancillary works as necessary Extra over for glass unit; size 900 x 350 x 1180mm highREVIEWAmount column prints "Included in Item-F" — counted as 0.00 in the totals, exactly as the source's own page total does. Confirm this is intended (e.g. a RATE ONLY schedule). | 4 | Nr. | 0.00 | 0.00Included in Item-F | Needs review | |
Kitchen cabinets; to back kitchen; including countertop, forming of holes, frames, carcass, supports, front/back/side panels, doors, shelves, drawers, concealed light (measured separately), skirting, hardware, finishes, accessories and all ancillary works as necessary Type 14; base unit; size 575 x 630 x 900mm highREVIEWAmount column prints "Included in Item-A&B" — counted as 0.00 in the totals, exactly as the source's own page total does. Confirm this is intended (e.g. a RATE ONLY schedule). | 26 | Nr. | 0.00 | 0.00Included in Item-A&B | Needs review | |
Kitchen cabinets; to back kitchen; including countertop, forming of holes, frames, carcass, supports, front/back/side panels, doors, shelves, drawers, concealed light (measured separately), skirting, hardware, finishes, accessories and all ancillary works as necessary Type 14; wall unit; size 1325 x 615 x 825mm highREVIEWAmount column prints "Included in Item-A&B" — counted as 0.00 in the totals, exactly as the source's own page total does. Confirm this is intended (e.g. a RATE ONLY schedule). | 26 | Nr. | 0.00 | 0.00Included in Item-A&B | Needs review | |
Kitchen cabinets; to back kitchen; including countertop, forming of holes, frames, carcass, supports, front/back/side panels, doors, shelves, drawers, concealed light (measured separately), skirting, hardware, finishes, accessories and all ancillary works as necessary Type 14; wall unit; size 2435 x 350 x 1210mm highREVIEWAmount column prints "Included in Item-A&B" — counted as 0.00 in the totals, exactly as the source's own page total does. Confirm this is intended (e.g. a RATE ONLY schedule). | 26 | Nr. | 0.00 | 0.00Included in Item-A&B | Needs review | |
Kitchen cabinets; to back kitchen; including countertop, forming of holes, frames, carcass, supports, front/back/side panels, doors, shelves, drawers, concealed light (measured separately), skirting, hardware, finishes, accessories and all ancillary works as necessary Type 14; wall unit; size 3485 x 350 x 1210mm highREVIEWAmount column prints "Included in Item-A&B" — counted as 0.00 in the totals, exactly as the source's own page total does. Confirm this is intended (e.g. a RATE ONLY schedule). | 26 | Nr. | 0.00 | 0.00Included in Item-A&B | Needs review | |
Kitchen cabinets; to back kitchen; including countertop, forming of holes, frames, carcass, supports, front/back/side panels, doors, shelves, drawers, concealed light (measured separately), skirting, hardware, finishes, accessories and all ancillary works as necessary Extra over for glass unit; size 865 x 350 x 1180mm highREVIEWAmount column prints "Included in Item-A&B" — counted as 0.00 in the totals, exactly as the source's own page total does. Confirm this is intended (e.g. a RATE ONLY schedule). | 26 | Nr. | 0.00 | 0.00Included in Item-A&B | Needs review | |
Kitchen cabinets; to back kitchen; including countertop, forming of holes, frames, carcass, supports, front/back/side panels, doors, shelves, drawers, concealed light (measured separately), skirting, hardware, finishes, accessories and all ancillary works as necessary Extra over for glass unit; size 900 x 350 x 1180mm highREVIEWAmount column prints "Included in Item-A&B" — counted as 0.00 in the totals, exactly as the source's own page total does. Confirm this is intended (e.g. a RATE ONLY schedule). | 26 | Nr. | 0.00 | 0.00Included in Item-A&B | Needs review | |
Kitchen cabinets; to back kitchen; including countertop, forming of holes, frames, carcass, supports, front/back/side panels, doors, shelves, drawers, concealed light (measured separately), skirting, hardware, finishes, accessories and all ancillary works as necessary Extra over for glass unit; size 1000 x 350 x 1180mm highREVIEWAmount column prints "Included in Item-A&B" — counted as 0.00 in the totals, exactly as the source's own page total does. Confirm this is intended (e.g. a RATE ONLY schedule). | 26 | Nr. | 0.00 | 0.00Included in Item-A&B | Needs review | |
Kitchen cabinets; to back kitchen; including countertop, forming of holes, frames, carcass, supports, front/back/side panels, doors, shelves, drawers, concealed light (measured separately), skirting, hardware, finishes, accessories and all ancillary works as necessary Extra over for glass unit; size 1085 x 350 x 1180mm highREVIEWAmount column prints "Included in Item-A&B" — counted as 0.00 in the totals, exactly as the source's own page total does. Confirm this is intended (e.g. a RATE ONLY schedule). | 26 | Nr. | 0.00 | 0.00Included in Item-A&B | Needs review | |
Section 2/K · SECTION K - ACCESSORIES · Page 2/K/1 - 2/K/14 0/4 clear0.00 Σ lines | ||||||
Glass partition; 10mm thick fully tempered and hear soak tested clear glass; including fixings, finishes, accessories and all ancillary works as necessary Extra over for single glazed pivot door; size 1150 x 2200mm highREVIEWAmount column prints "Included in item L" — counted as 0.00 in the totals, exactly as the source's own page total does. Confirm this is intended (e.g. a RATE ONLY schedule). | 1 | Nr. | 0.00 | 0.00Included in item L | Needs review | |
Shower and toilet glass partition; fixed glass with doors; frosted glass; 10mm thick; including ironmongery, fixings, accessories and all ancillary works as necessary Extra over doors; overall size; 700mm x 2100mm highREVIEWAmount column prints "Included in item A,B&C" — counted as 0.00 in the totals, exactly as the source's own page total does. Confirm this is intended (e.g. a RATE ONLY schedule). | 12 | Nr. | 0.00 | 0.00Included in item A,B&C | Needs review | |
Clear Glass Extra over doors; overall size; 700mm x 2000mm highREVIEWAmount column prints "Included in Item E to U" — counted as 0.00 in the totals, exactly as the source's own page total does. Confirm this is intended (e.g. a RATE ONLY schedule). | 1,778 | Nr. | 0.00 | 0.00Included in Item E to U | Needs review | |
Fluted Tinted Glass Extra over doors; overall size; 700mm x 2000mm highREVIEWAmount column prints "Included in Item A to J" — counted as 0.00 in the totals, exactly as the source's own page total does. Confirm this is intended (e.g. a RATE ONLY schedule). | 983 | Nr. | 0.00 | 0.00Included in Item A to J | Needs review | |
Section 2/P · SECTION P - CONVEYING SYSTEMS · Page 2/P/1 - 2/P/8 0/21 clear0.00 Σ lines | ||||||
Marble; laid on levelling screed; including adhesive mortar, grout, joint and edge treatment sealer, accessories and all ancillary works as necessary Type ST-102; 20mm thickREVIEWAmount column prints "Included in Lift Price" — counted as 0.00 in the totals, exactly as the source's own page total does. Confirm this is intended (e.g. a RATE ONLY schedule). | 84 | m2 | 0.00 | 0.00Included in Lift Price | Needs review | |
Metal skirting; including adhesive, accessories and all ancillary works as necessary Type MT-109; 100mm highREVIEWAmount column prints "Included in Lift Price" — counted as 0.00 in the totals, exactly as the source's own page total does. Confirm this is intended (e.g. a RATE ONLY schedule). | 144 | m | 0.00 | 0.00Included in Lift Price | Needs review | |
Metal insert; including finishes, fixings, accessories and all ancillary works as necessary Type MT-115; to floor finsREVIEWAmount column prints "Included in Lift Price" — counted as 0.00 in the totals, exactly as the source's own page total does. Confirm this is intended (e.g. a RATE ONLY schedule). | 160 | m | 0.00 | 0.00Included in Lift Price | Needs review | |
Metal insert; including finishes, fixings, accessories and all ancillary works as necessary Type MT-113; to wall finsREVIEWAmount column prints "Included in Lift Price" — counted as 0.00 in the totals, exactly as the source's own page total does. Confirm this is intended (e.g. a RATE ONLY schedule). | 640 | m | 0.00 | 0.00Included in Lift Price | Needs review | |
Grid ceiling; in metal finish; including ceiling suspension system, shadows gaps, trims, corner protection profile, accessories and all ancillary works as necessary Type WD-102; with MT-109REVIEWAmount column prints "Included in Lift Price" — counted as 0.00 in the totals, exactly as the source's own page total does. Confirm this is intended (e.g. a RATE ONLY schedule). | 76 | m2 | 0.00 | 0.00Included in Lift Price | Needs review | |
Grid ceiling; in metal finish; including ceiling suspension system, shadows gaps, trims, corner protection profile, accessories and all ancillary works as necessary Extra over for access panel; size 600 x 600mmREVIEWAmount column prints "Included in Lift Price" — counted as 0.00 in the totals, exactly as the source's own page total does. Confirm this is intended (e.g. a RATE ONLY schedule). | 24 | Nr. | 0.00 | 0.00Included in Lift Price | Needs review | |
Mirror; tinted mirror with frame; including, backing, supports, finishes, accessories and all ancillary works as necessary Type GL-108; 6mm thickREVIEWAmount column prints "Included in Lift Price" — counted as 0.00 in the totals, exactly as the source's own page total does. Confirm this is intended (e.g. a RATE ONLY schedule). | 168 | m2 | 0.00 | 0.00Included in Lift Price | Needs review | |
Wall cladding; in high pressure laminate finish; including, backing, supports, finishes, accessories and all ancillary works as necessary Type LP-105; 20mm thickREVIEWAmount column prints "Included in Lift Price" — counted as 0.00 in the totals, exactly as the source's own page total does. Confirm this is intended (e.g. a RATE ONLY schedule). | 144 | m2 | 0.00 | 0.00Included in Lift Price | Needs review | |
Metal finish; including adhesive, finishes, brackets, fixings, accessories and all ancillary works as necessary Type MT-109REVIEWAmount column prints "Included in Lift Price" — counted as 0.00 in the totals, exactly as the source's own page total does. Confirm this is intended (e.g. a RATE ONLY schedule). | 92 | m2 | 0.00 | 0.00Included in Lift Price | Needs review | |
Metal finish; including adhesive, finishes, brackets, fixings, accessories and all ancillary works as necessary Type MT-112REVIEWAmount column prints "Included in Lift Price" — counted as 0.00 in the totals, exactly as the source's own page total does. Confirm this is intended (e.g. a RATE ONLY schedule). | 64 | m2 | 0.00 | 0.00Included in Lift Price | Needs review | |
Hand grab bar; in metal finish; fixed on bracket; including finishes, brackets, fixings, accessories and all ancillary works as necessary 1070mm lengthREVIEWAmount column prints "Included in Lift Price" — counted as 0.00 in the totals, exactly as the source's own page total does. Confirm this is intended (e.g. a RATE ONLY schedule). | 48 | Nr. | 0.00 | 0.00Included in Lift Price | Needs review | |
Hand grab bar; in metal finish; fixed on bracket; including finishes, brackets, fixings, accessories and all ancillary works as necessary 1200mm lengthREVIEWAmount column prints "Included in Lift Price" — counted as 0.00 in the totals, exactly as the source's own page total does. Confirm this is intended (e.g. a RATE ONLY schedule). | 24 | Nr. | 0.00 | 0.00Included in Lift Price | Needs review | |
| Allow for providing shop drawings, as built drawings and material submittal approvals REVIEWAmount column prints "Included in Lift Price" — counted as 0.00 in the totals, exactly as the source's own page total does. Confirm this is intended (e.g. a RATE ONLY schedule). | 0 | Item | 0.00 | 0.00Included in Lift Price | Needs review | |
| Allow for providing catalogues, operation and maintenance manuals REVIEWAmount column prints "Included in Lift Price" — counted as 0.00 in the totals, exactly as the source's own page total does. Confirm this is intended (e.g. a RATE ONLY schedule). | 0 | Item | 0.00 | 0.00Included in Lift Price | Needs review | |
| Allow for labeling, tagging of equipment with their related control panel and components as specified REVIEWAmount column prints "Included in Lift Price" — counted as 0.00 in the totals, exactly as the source's own page total does. Confirm this is intended (e.g. a RATE ONLY schedule). | 0 | Item | 0.00 | 0.00Included in Lift Price | Needs review | |
| Allow for testing and commissioning the complete installation REVIEWAmount column prints "Included in Lift Price" — counted as 0.00 in the totals, exactly as the source's own page total does. Confirm this is intended (e.g. a RATE ONLY schedule). | 0 | Item | 0.00 | 0.00Included in Lift Price | Needs review | |
Generally Allow for cutting or forming all holes, mortices, chases and the like and making good finishes for conveying systemsREVIEWAmount column prints "Included in Lift Price" — counted as 0.00 in the totals, exactly as the source's own page total does. Confirm this is intended (e.g. a RATE ONLY schedule). | 0 | Item | 0.00 | 0.00Included in Lift Price | Needs review | |
Generally Allow for fixing all sleeves, frames and built-in firestop system and making good finishes for conveying systemsREVIEWAmount column prints "Included in Lift Price" — counted as 0.00 in the totals, exactly as the source's own page total does. Confirm this is intended (e.g. a RATE ONLY schedule). | 0 | Item | 0.00 | 0.00Included in Lift Price | Needs review | |
Generally Allow for firestopping for all holes and making good finishes for conveying systemsREVIEWAmount column prints "Included in Lift Price" — counted as 0.00 in the totals, exactly as the source's own page total does. Confirm this is intended (e.g. a RATE ONLY schedule). | 0 | Item | 0.00 | 0.00Included in Lift Price | Needs review | |
Generally Allow for building in or cutting and pinning brackets or the like and making good finishes for conveying systemsREVIEWAmount column prints "Included in Lift Price" — counted as 0.00 in the totals, exactly as the source's own page total does. Confirm this is intended (e.g. a RATE ONLY schedule). | 0 | Item | 0.00 | 0.00Included in Lift Price | Needs review | |
Generally Allow connection to elevator monitoring system (EMS) at BMS roomREVIEWAmount column prints "Included in Lift Price" — counted as 0.00 in the totals, exactly as the source's own page total does. Confirm this is intended (e.g. a RATE ONLY schedule). | 0 | Item | 0.00 | 0.00Included in Lift Price | Needs review | |
Section 2/Q · SECTION Q - MECHANICAL ENGINEERING INSTALLATIONS · Page 2/Q/1 - 2/Q/190 0/34 clear0.00 Σ lines | ||||||
Common Areas Type SAN-204; sensor flush plateREVIEWAmount column prints "Included" — counted as 0.00 in the totals, exactly as the source's own page total does. Confirm this is intended (e.g. a RATE ONLY schedule). | 30 | Nr. | 0.00 | 0.00Included | Needs review | |
Sundries Allow for all supports, fixings, anchors and insulating blocks where not included above or elsewhereREVIEWAmount column prints "Included" — counted as 0.00 in the totals, exactly as the source's own page total does. Confirm this is intended (e.g. a RATE ONLY schedule). | 0 | Item | 0.00 | 0.00Included | Needs review | |
Sundries Allow for all identification including painting, marking and labellingREVIEWAmount column prints "Included" — counted as 0.00 in the totals, exactly as the source's own page total does. Confirm this is intended (e.g. a RATE ONLY schedule). | 0 | Item | 0.00 | 0.00Included | Needs review | |
Sundries Allow for inspection, testing and commissioning including all off-site and factory testing; inspections to demonstrate compliance with relevant specifications and standards; operating the completed installations; submitting all relevant test record sheets at the completion of the installationsREVIEWAmount column prints "Included" — counted as 0.00 in the totals, exactly as the source's own page total does. Confirm this is intended (e.g. a RATE ONLY schedule). | 0 | Item | 0.00 | 0.00Included | Needs review | |
Sundries Allow for providing in suitable quantities all special tools, operating handles and keys or other equipment necessary for installation, maintenance or operation of the completed installationREVIEWAmount column prints "Included" — counted as 0.00 in the totals, exactly as the source's own page total does. Confirm this is intended (e.g. a RATE ONLY schedule). | 0 | Item | 0.00 | 0.00Included | Needs review | |
Sundries Allow for providing spares for the Mechanical Engineering InstallationREVIEWAmount column prints "Deleted as per Add - 07" — counted as 0.00 in the totals, exactly as the source's own page total does. Confirm this is intended (e.g. a RATE ONLY schedule). | 0 | Item | 0.00 | 0.00Deleted as per Add - 07 | Needs review | |
Sundries Allow for providing comprehensive equipment documentation including operating instructions and maintenance manuals, record documents, warranties, guarantees, drawings and the likeREVIEWAmount column prints "Included" — counted as 0.00 in the totals, exactly as the source's own page total does. Confirm this is intended (e.g. a RATE ONLY schedule). | 0 | Item | 0.00 | 0.00Included | Needs review | |
Work Incidental to Mechanical Engineering Installations Allow for planning and coordinating with relevant statutory authorities and with all other tradesREVIEWAmount column prints "Included" — counted as 0.00 in the totals, exactly as the source's own page total does. Confirm this is intended (e.g. a RATE ONLY schedule). | 0 | Item | 0.00 | 0.00Included | Needs review | |
Work Incidental to Mechanical Engineering Installations Allow for liaison with obtaining approvals and attendance on approved Authorities, other statutory bodies and service providers as requiredREVIEWAmount column prints "Included" — counted as 0.00 in the totals, exactly as the source's own page total does. Confirm this is intended (e.g. a RATE ONLY schedule). | 0 | Item | 0.00 | 0.00Included | Needs review | |
Work Incidental to Mechanical Engineering Installations Allow for all incidental work including factory finishing, fixing to all backgrounds by appropriate means and all making goodREVIEWAmount column prints "Included" — counted as 0.00 in the totals, exactly as the source's own page total does. Confirm this is intended (e.g. a RATE ONLY schedule). | 0 | Item | 0.00 | 0.00Included | Needs review | |
Work Incidental to Mechanical Engineering Installations Allow for supplying and fixing all brackets, clamps and other fixing devices including building in or cutting and pinning and all making goodREVIEWAmount column prints "Included" — counted as 0.00 in the totals, exactly as the source's own page total does. Confirm this is intended (e.g. a RATE ONLY schedule). | 0 | Item | 0.00 | 0.00Included | Needs review | |
Work Incidental to Mechanical Engineering Installations Allow for training the Employer's Staff to operate and maintain the Mechanical Engineering InstallationsREVIEWAmount column prints "Included" — counted as 0.00 in the totals, exactly as the source's own page total does. Confirm this is intended (e.g. a RATE ONLY schedule). | 0 | Item | 0.00 | 0.00Included | Needs review | |
Work Incidental to Mechanical Engineering Installations Allow for all incidental work to the Mechanical Engineering Installations where not included above or elsewhereREVIEWAmount column prints "Included" — counted as 0.00 in the totals, exactly as the source's own page total does. Confirm this is intended (e.g. a RATE ONLY schedule). | 0 | Item | 0.00 | 0.00Included | Needs review | |
Builders work in connection (BWIC) with Mechanical Engineering Installations Allow for all BWIC with Mechanical Engineering Installations where not included above or elsewhereREVIEWAmount column prints "Included" — counted as 0.00 in the totals, exactly as the source's own page total does. Confirm this is intended (e.g. a RATE ONLY schedule). | 0 | Item | 0.00 | 0.00Included | Needs review | |
| Allow for all connections to existing services mains REVIEWAmount column prints "Included" — counted as 0.00 in the totals, exactly as the source's own page total does. Confirm this is intended (e.g. a RATE ONLY schedule). | 0 | Item | 0.00 | 0.00Included | Needs review | |
| Allow for earthing and bonding as specified; in particular all ductwork systems shall be provided with earth continuity protection at all joints REVIEWAmount column prints "Included" — counted as 0.00 in the totals, exactly as the source's own page total does. Confirm this is intended (e.g. a RATE ONLY schedule). | 0 | Item | 0.00 | 0.00Included | Needs review | |
| Allow for all supports, fixings, anchors, insulating blocks and anti-vibration devices where not included above or elsewhere REVIEWAmount column prints "Included" — counted as 0.00 in the totals, exactly as the source's own page total does. Confirm this is intended (e.g. a RATE ONLY schedule). | 0 | Item | 0.00 | 0.00Included | Needs review | |
| Allow for all identification including painting, marking and labeling, including labeling all valves REVIEWAmount column prints "Included" — counted as 0.00 in the totals, exactly as the source's own page total does. Confirm this is intended (e.g. a RATE ONLY schedule). | 0 | Item | 0.00 | 0.00Included | Needs review | |
| Allow for flushing, cleaning, sterilization and chlorination of the completed installations as necessary REVIEWAmount column prints "Included" — counted as 0.00 in the totals, exactly as the source's own page total does. Confirm this is intended (e.g. a RATE ONLY schedule). | 0 | Item | 0.00 | 0.00Included | Needs review | |
| Allow for inspection, testing and commissioning including all off-site and factory testing; inspections to demonstrate compliance with relevant specifications and standards; operating the completed installations; submitting all relevant test record sheets at the completion of the installations REVIEWAmount column prints "Included" — counted as 0.00 in the totals, exactly as the source's own page total does. Confirm this is intended (e.g. a RATE ONLY schedule). | 0 | Item | 0.00 | 0.00Included | Needs review | |
| Allow for providing in suitable quantities all special tools, operating handles and keys or other equipment necessary for installation, maintenance or operation of the completed installations REVIEWAmount column prints "Included" — counted as 0.00 in the totals, exactly as the source's own page total does. Confirm this is intended (e.g. a RATE ONLY schedule). | 0 | Item | 0.00 | 0.00Included | Needs review | |
| Allow for providing comprehensive equipment documentation including operating instructions and maintenance manuals, record documents, warranties, guarantees, drawings and the like REVIEWAmount column prints "Included" — counted as 0.00 in the totals, exactly as the source's own page total does. Confirm this is intended (e.g. a RATE ONLY schedule). | 0 | Item | 0.00 | 0.00Included | Needs review | |
| Allow for vibration and noise control where not included above or elsewhere REVIEWAmount column prints "Included" — counted as 0.00 in the totals, exactly as the source's own page total does. Confirm this is intended (e.g. a RATE ONLY schedule). | 0 | Item | 0.00 | 0.00Included | Needs review | |
Work Incidental to Mechanical Engineering Installations Allow for planning and coordinating with relevant statutory authorities and with all other tradesREVIEWAmount column prints "Included" — counted as 0.00 in the totals, exactly as the source's own page total does. Confirm this is intended (e.g. a RATE ONLY schedule). | 0 | Item | 0.00 | 0.00Included | Needs review | |
Work Incidental to Mechanical Engineering Installations Allow for liaison with obtaining approvals and attendance on DEWA, other statutory bodies and service providers as requiredREVIEWAmount column prints "Included" — counted as 0.00 in the totals, exactly as the source's own page total does. Confirm this is intended (e.g. a RATE ONLY schedule). | 0 | Item | 0.00 | 0.00Included | Needs review | |
Work Incidental to Mechanical Engineering Installations Allow for marking the positions of and cutting or forming holes, mortices, chases or the like and all making goodREVIEWAmount column prints "Included" — counted as 0.00 in the totals, exactly as the source's own page total does. Confirm this is intended (e.g. a RATE ONLY schedule). | 0 | Item | 0.00 | 0.00Included | Needs review | |
Work Incidental to Mechanical Engineering Installations Allow for supplying and fixing all sleeves, frames and built-in fire stoppers for building into concrete structures and masonry wallsREVIEWAmount column prints "Included" — counted as 0.00 in the totals, exactly as the source's own page total does. Confirm this is intended (e.g. a RATE ONLY schedule). | 0 | Item | 0.00 | 0.00Included | Needs review | |
Work Incidental to Mechanical Engineering Installations Allow for supplying and fixing all brackets, clamps and other fixing devices including building in or cutting and pinning and all making goodREVIEWAmount column prints "Included" — counted as 0.00 in the totals, exactly as the source's own page total does. Confirm this is intended (e.g. a RATE ONLY schedule). | 0 | Item | 0.00 | 0.00Included | Needs review | |
Work Incidental to Mechanical Engineering Installations Allow for fire stopping all pipes, ducts and the like at penetrations through fire walls and other structures and making goodREVIEWAmount column prints "Included" — counted as 0.00 in the totals, exactly as the source's own page total does. Confirm this is intended (e.g. a RATE ONLY schedule). | 0 | Item | 0.00 | 0.00Included | Needs review | |
Work Incidental to Mechanical Engineering Installations Allow for all incidental work including factory finishing, fixing to all backgrounds by appropriate means and all making goodREVIEWAmount column prints "Included" — counted as 0.00 in the totals, exactly as the source's own page total does. Confirm this is intended (e.g. a RATE ONLY schedule). | 0 | Item | 0.00 | 0.00Included | Needs review | |
Work Incidental to Mechanical Engineering Installations Allow for all protective painting including removing protective coatings or wrappings and cleaning exposed surfaces for Mechanical installations.REVIEWAmount column prints "Included" — counted as 0.00 in the totals, exactly as the source's own page total does. Confirm this is intended (e.g. a RATE ONLY schedule). | 0 | Item | 0.00 | 0.00Included | Needs review | |
Work Incidental to Mechanical Engineering Installations Allow for all decorative painting including removing protective coatings or wrappings and cleaning and polishing exposed surfaces for Mechanical installations.REVIEWAmount column prints "Included" — counted as 0.00 in the totals, exactly as the source's own page total does. Confirm this is intended (e.g. a RATE ONLY schedule). | 0 | Item | 0.00 | 0.00Included | Needs review | |
Work Incidental to Mechanical Engineering Installations Allow for training the Employer's Staff to operate and maintain the Mechanical Engineering InstallationsREVIEWAmount column prints "Included" — counted as 0.00 in the totals, exactly as the source's own page total does. Confirm this is intended (e.g. a RATE ONLY schedule). | 0 | Item | 0.00 | 0.00Included | Needs review | |
Work Incidental to Mechanical Engineering Installations Allow for all incidental work to the Mechanical Engineering Installations where not included above or elsewhereREVIEWAmount column prints "Included" — counted as 0.00 in the totals, exactly as the source's own page total does. Confirm this is intended (e.g. a RATE ONLY schedule). | 0 | Item | 0.00 | 0.00Included | Needs review | |
Section 2/R · SECTION R - ELECTRICAL INSTALLATIONS · Page 2/R/1 - 2/R/177 0/270 clear0.00 Σ lines | ||||||
4C x 16mm² XLPE/SWA/LSOH + 1C x 16mm² ECC From SMDB-T1-GF-LV01 to 40A TP isolator for signage (ISO-T1-GF-SIGNAGE)REVIEWAmount column prints "Included" — counted as 0.00 in the totals, exactly as the source's own page total does. Confirm this is intended (e.g. a RATE ONLY schedule). | 0 | Item | 0.00 | 0.00Included | Needs review | |
4C x 16mm² XLPE/SWA/LSOH + 1C x 16mm² ECC From SMDB-T1-GF-LV01 to 40A TP isolator for signage (ISO-T3-GF-SIGNAGE)REVIEWAmount column prints "Included" — counted as 0.00 in the totals, exactly as the source's own page total does. Confirm this is intended (e.g. a RATE ONLY schedule). | 0 | Item | 0.00 | 0.00Included | Needs review | |
4C x 16mm² XLPE/SWA/LSOH + 1C x 16mm² ECC From SMDB-T4-02-LL01 to DB-T4-02-GYMREVIEWAmount column prints "Included" — counted as 0.00 in the totals, exactly as the source's own page total does. Confirm this is intended (e.g. a RATE ONLY schedule). | 0 | Item | 0.00 | 0.00Included | Needs review | |
Cables; including fixings, supports, terminations, accessories and all ancillary works as necessary From power supply to 40A TP isolator at water feature pump roomREVIEWAmount column prints "Excluded" — counted as 0.00 in the totals, exactly as the source's own page total does. Confirm this is intended (e.g. a RATE ONLY schedule). | 0 | Item | 0.00 | 0.00Excluded | Needs review | |
Cables; including fixings, supports, terminations, accessories and all ancillary works as necessary From power supply to MCC-T1-B1-LL01REVIEWAmount column prints "Excluded" — counted as 0.00 in the totals, exactly as the source's own page total does. Confirm this is intended (e.g. a RATE ONLY schedule). | 0 | Item | 0.00 | 0.00Excluded | Needs review | |
Cables; including fixings, supports, terminations, accessories and all ancillary works as necessary From power supply to MCC-T3-B1-LL01REVIEWAmount column prints "Excluded" — counted as 0.00 in the totals, exactly as the source's own page total does. Confirm this is intended (e.g. a RATE ONLY schedule). | 0 | Item | 0.00 | 0.00Excluded | Needs review | |
Cables; including fixings, supports, terminations, accessories and all ancillary works as necessary From power supply to MCC-T4-B1-LL01REVIEWAmount column prints "Excluded" — counted as 0.00 in the totals, exactly as the source's own page total does. Confirm this is intended (e.g. a RATE ONLY schedule). | 0 | Item | 0.00 | 0.00Excluded | Needs review | |
Cables; including fixings, supports, terminations, accessories and all ancillary works as necessary From power supply to MCC-T2-B2-LL01REVIEWAmount column prints "Excluded" — counted as 0.00 in the totals, exactly as the source's own page total does. Confirm this is intended (e.g. a RATE ONLY schedule). | 0 | Item | 0.00 | 0.00Excluded | Needs review | |
Cables; including fixings, supports, terminations, accessories and all ancillary works as necessary From power supply to MCC-T4-B2-LL01REVIEWAmount column prints "Excluded" — counted as 0.00 in the totals, exactly as the source's own page total does. Confirm this is intended (e.g. a RATE ONLY schedule). | 0 | Item | 0.00 | 0.00Excluded | Needs review | |
Cables; including fixings, supports, terminations, accessories and all ancillary works as necessary From power supply to SMDB-T3-B1-LL01REVIEWAmount column prints "Excluded" — counted as 0.00 in the totals, exactly as the source's own page total does. Confirm this is intended (e.g. a RATE ONLY schedule). | 0 | Item | 0.00 | 0.00Excluded | Needs review | |
Cables; including fixings, supports, terminations, accessories and all ancillary works as necessary From power supply to SMDB-T3-B2-LL01REVIEWAmount column prints "Excluded" — counted as 0.00 in the totals, exactly as the source's own page total does. Confirm this is intended (e.g. a RATE ONLY schedule). | 0 | Item | 0.00 | 0.00Excluded | Needs review | |
Cables; including fixings, supports, terminations, accessories and all ancillary works as necessary From power supply to DB-T2-GF-SS-01REVIEWAmount column prints "Excluded" — counted as 0.00 in the totals, exactly as the source's own page total does. Confirm this is intended (e.g. a RATE ONLY schedule). | 0 | Item | 0.00 | 0.00Excluded | Needs review | |
Cables; including fixings, supports, terminations, accessories and all ancillary works as necessary From power supply to DB-T3-GF-LL02REVIEWAmount column prints "Excluded" — counted as 0.00 in the totals, exactly as the source's own page total does. Confirm this is intended (e.g. a RATE ONLY schedule). | 0 | Item | 0.00 | 0.00Excluded | Needs review | |
Cables; including fixings, supports, terminations, accessories and all ancillary works as necessary From power supply to DB-T2-03-KDCBREVIEWAmount column prints "Excluded" — counted as 0.00 in the totals, exactly as the source's own page total does. Confirm this is intended (e.g. a RATE ONLY schedule). | 0 | Item | 0.00 | 0.00Excluded | Needs review | |
Cables; including fixings, supports, terminations, accessories and all ancillary works as necessary From power supply to EDB-T2-GF-ETSREVIEWAmount column prints "Excluded" — counted as 0.00 in the totals, exactly as the source's own page total does. Confirm this is intended (e.g. a RATE ONLY schedule). | 0 | Item | 0.00 | 0.00Excluded | Needs review | |
Cables; including fixings, supports, terminations, accessories and all ancillary works as necessary From power supply to EDB-T2-GF-LL02REVIEWAmount column prints "Excluded" — counted as 0.00 in the totals, exactly as the source's own page total does. Confirm this is intended (e.g. a RATE ONLY schedule). | 0 | Item | 0.00 | 0.00Excluded | Needs review | |
Cables; including fixings, supports, terminations, accessories and all ancillary works as necessary From power supply to EMCC-T2-GF-FAN-02REVIEWAmount column prints "Excluded" — counted as 0.00 in the totals, exactly as the source's own page total does. Confirm this is intended (e.g. a RATE ONLY schedule). | 0 | Item | 0.00 | 0.00Excluded | Needs review | |
Cables; including fixings, supports, terminations, accessories and all ancillary works as necessary From power supply to 40A TP isolatorREVIEWAmount column prints "Excluded" — counted as 0.00 in the totals, exactly as the source's own page total does. Confirm this is intended (e.g. a RATE ONLY schedule). | 0 | Item | 0.00 | 0.00Excluded | Needs review | |
Cables; including fixings, supports, terminations, accessories and all ancillary works as necessary From power supply to 63A TP isolatorREVIEWAmount column prints "Excluded" — counted as 0.00 in the totals, exactly as the source's own page total does. Confirm this is intended (e.g. a RATE ONLY schedule). | 0 | Item | 0.00 | 0.00Excluded | Needs review | |
Cables; including fixings, supports, terminations, accessories and all ancillary works as necessary From power supply to SP isolatorREVIEWAmount column prints "Excluded" — counted as 0.00 in the totals, exactly as the source's own page total does. Confirm this is intended (e.g. a RATE ONLY schedule). | 0 | Item | 0.00 | 0.00Excluded | Needs review | |
Cables; including fixings, supports, terminations, accessories and all ancillary works as necessary From power supply to TPN isolatorREVIEWAmount column prints "Excluded" — counted as 0.00 in the totals, exactly as the source's own page total does. Confirm this is intended (e.g. a RATE ONLY schedule). | 0 | Item | 0.00 | 0.00Excluded | Needs review | |
Cables; including fixings, supports, terminations, accessories and all ancillary works as necessary From power supply to SMDB-T3-GF-LL01REVIEWAmount column prints "Excluded" — counted as 0.00 in the totals, exactly as the source's own page total does. Confirm this is intended (e.g. a RATE ONLY schedule). | 0 | Item | 0.00 | 0.00Excluded | Needs review | |
| loading more… 150 of 605 lines rendered | ||||||
What the bidder did with the line
Read from the source. Every line sits in exactly one of these.| State | Lines | Measured | Money | |
|---|---|---|---|---|
| PricedA rate in the source and money in the amount. | 6,532 | 7,145,276.23 | 2,710,720,000.00 | |
| UnpricedNo rate given, nothing carried into the totals. | 100 | — | — | |
| Prints words, not a figure“By Others”, “Included” — counted as nil, as the bidder's own page total does. | 507 | 16,478 | — | |
| Priced as a wholeMoney on the line with no rate behind it — a lump or provisional sum. | 4 | — | 4,950,000.00 |
Where your review stands
Your review of those same lines — a line can be in more than one.| State | Lines | Measured | Money | |
|---|---|---|---|---|
| Still openCarries a question nobody has answered yet. | 605 | 17,291 | 460,520.73 | |
| ConfirmedYou checked it; the finding stands and left the queue. | 0 | — | — | |
| RuledA recorded determination answers it — reversible at any time. | 0 | — | — | |
| Does not reconcileAn error on the line itself, not on its block. | 0 | — | — |
Collection blocks
Σ of each block’s line amounts against the total the source itself prints.| Block | Section | Lines | Σ lines | Source prints | Ties |
|---|---|---|---|---|---|
| GR1/1 | GENERAL REQUIREMENTS FOR THE WHOLE OF THE WORKS | 3 | 0.00 | 0.00 | ✓ |
| GR1/2 | GENERAL REQUIREMENTS FOR THE WHOLE OF THE WORKS | 9 | 0.00 | 0.00 | ✓ |
| GR1/3 | GENERAL REQUIREMENTS FOR THE WHOLE OF THE WORKS | 1 | 0.00 | 0.00 | ✓ |
| GR1/4 | GENERAL REQUIREMENTS FOR THE WHOLE OF THE WORKS | 5 | 0.00 | 0.00 | ✓ |
| GR1/5 | GENERAL REQUIREMENTS FOR THE WHOLE OF THE WORKS | 7 | 0.00 | 0.00 | ✓ |
| GR1/6 | GENERAL REQUIREMENTS FOR THE WHOLE OF THE WORKS | 16 | 0.00 | 0.00 | ✓ |
| GR1/7 | GENERAL REQUIREMENTS FOR THE WHOLE OF THE WORKS | 11 | 0.00 | 0.00 | ✓ |
| GR1/8 | GENERAL REQUIREMENTS FOR THE WHOLE OF THE WORKS | 4 | 0.00 | 0.00 | ✓ |
| GR1/9 | GENERAL REQUIREMENTS FOR THE WHOLE OF THE WORKS | 12 | 324,986,009.87 | 324,986,009.87 | ✓ |
| GR1/10 | GENERAL REQUIREMENTS FOR THE WHOLE OF THE WORKS | 9 | 0.00 | 0.00 | ✓ |
| GR1/11 | GENERAL REQUIREMENTS FOR THE WHOLE OF THE WORKS | 3 | 0.00 | 0.00 | ✓ |
| GR1/12 | GENERAL REQUIREMENTS FOR THE WHOLE OF THE WORKS | 14 | 0.00 | 0.00 | ✓ |
| GR1/13 | GENERAL REQUIREMENTS FOR THE WHOLE OF THE WORKS | 17 | 0.00 | 0.00 | ✓ |
| GR1/14 | GENERAL REQUIREMENTS FOR THE WHOLE OF THE WORKS | 1 | 0.00 | 0.00 | ✓ |
| GR1/15 | GENERAL REQUIREMENTS FOR THE WHOLE OF THE WORKS | 1 | 0.00 | 0.00 | ✓ |
| 2 - Main/1 | SITE PREPARATION | 6 | 4,694,535.10 | 4,694,535.10 | ✓ |
| 2 - Main/2 | BORED PILING | 6 | 2,760,886.93 | 2,760,886.93 | ✓ |
| 2 - Main/3 | GENERALLY | 1 | 0.00 | 0.00 | ✓ |
| 2 - Main/4 | POURED CONCRETE | 19 | 14,630,648.01 | 14,630,648.01 | ✓ |
| 2 - Main/5 | POURED CONCRETE | 20 | 28,966,030.07 | 28,966,030.07 | ✓ |
| 2 - Main/6 | POURED CONCRETE | 23 | 42,482,847.88 | 42,482,847.88 | ✓ |
| 2 - Main/7 | POURED CONCRETE | 6 | 384,028.76 | 384,028.76 | ✓ |
| 2 - Main/8 | REINFORCEMENT | 22 | 212,851,833.88 | 212,851,833.88 | ✓ |
| 2 - Main/9 | REINFORCEMENT | 6 | 1,194,050.76 | 1,194,050.76 | ✓ |
| 2 - Main/10 | SHUTTERING | 20 | 89,097,434.56 | 89,097,434.56 | ✓ |
| 2 - Main/11 | SHUTTERING | 4 | 1,930,331.41 | 1,930,331.41 | ✓ |
| 2 - Main/12 | PRESTRESSED CONCRETE | 4 | 121,983,430.62 | 121,983,430.62 | ✓ |
| 2 - Main/13 | SUNDRIES | 5 | 6,446,426.82 | 6,446,426.82 | ✓ |
| 2 - Main/14 | GENERALLY | 1 | 0.00 | 0.00 | ✓ |
| 2 - Main/15 | WALL AND PIERS | 11 | 37,543,197.84 | 37,543,197.84 | ✓ |
| 2 - Main/16 | SUNDRIES | 4 | 0.00 | 0.00 | ✓ |
| 2 - Main/17 | GENERALLY | 1 | 0.00 | 0.00 | ✓ |
| 2 - Main/18 | STRUCTURAL METALWORK | 18 | 3,370,022.66 | 3,370,022.66 | ✓ |
| 2 - Main/19 | STRUCTURAL METALWORK | 5 | 1,532,761.57 | 1,532,761.57 | ✓ |
| 2 - Main/20 | NON-STRUCTURAL METALWORK | 5 | 71,495,384.71 | 71,495,384.71 | ✓ |
| 2 - Main/21 | NON-STRUCTURAL METALWORK | 14 | 10,887,649.88 | 10,887,649.88 | ✓ |
| 2 - Main/22 | NON-STRUCTURAL METALWORK | 16 | 77,999,377.28 | 77,999,377.28 | ✓ |
| 2 - Main/23 | NON-STRUCTURAL METALWORK | 20 | 64,513,628.21 | 64,513,628.21 | ✓ |
| 2 - Main/24 | NON-STRUCTURAL METALWORK | 15 | 75,013,752.37 | 75,013,752.37 | ✓ |
| 2 - Main/25 | NON-STRUCTURAL METALWORK | 12 | 4,164,955.34 | 4,164,955.34 | ✓ |
| 2 - Main/26 | NON-STRUCTURAL METALWORK | 9 | 948,552.05 | 948,552.05 | ✓ |
| 2 - Main/27 | NON-STRUCTURAL METALWORK | 12 | 2,522,676.60 | 2,522,676.60 | ✓ |
| 2 - Main/28 | GENERALLY | 2 | 7,333,454.48 | 7,333,454.48 | ✓ |
| 2 - Main/29 | COMPOSITE ITEMS | 12 | 5,196,859.85 | 5,196,859.85 | ✓ |
| 2 - Main/30 | COMPOSITE ITEMS | 14 | 2,785,344.77 | 2,785,344.77 | ✓ |
| 2 - Main/31 | COMPOSITE ITEMS | 13 | 1,401,510.44 | 1,401,510.44 | ✓ |
| 2 - Main/32 | COMPOSITE ITEMS | 20 | 4,012,755.10 | 4,012,755.10 | ✓ |
| 2 - Main/33 | COMPOSITE ITEMS | 16 | 3,471,753.71 | 3,471,753.71 | ✓ |
| 2 - Main/34 | COMPOSITE ITEMS | 18 | 2,655,633.84 | 2,655,633.84 | ✓ |
| 2 - Main/35 | COMPOSITE ITEMS | 18 | 1,374,998.08 | 1,374,998.08 | ✓ |
| 2 - Main/36 | COMPOSITE ITEMS | 19 | 965,532.16 | 965,532.16 | ✓ |
| 2 - Main/37 | COMPOSITE ITEMS | 17 | 24,678,538.84 | 24,678,538.84 | ✓ |
| 2 - Main/38 | COMPOSITE ITEMS | 16 | 21,315,257.17 | 21,315,257.17 | ✓ |
| 2 - Main/39 | COMPOSITE ITEMS | 9 | 1,721,713.98 | 1,721,713.98 | ✓ |
| 2 - Main/40 | COMPOSITE ITEMS | 16 | 41,182,223.07 | 41,182,223.07 | ✓ |
| 2 - Main/41 | COMPOSITE ITEMS | 21 | 48,367,012.72 | 48,367,012.72 | ✓ |
| 2 - Main/42 | COMPOSITE ITEMS | 18 | 15,308,044.05 | 15,308,044.05 | ✓ |
| 2 - Main/43 | COMPOSITE ITEMS | 18 | 2,168,330.92 | 2,168,330.92 | ✓ |
| 2 - Main/44 | COMPOSITE ITEMS | 16 | 567,561.44 | 567,561.44 | ✓ |
| 2 - Main/45 | COMPOSITE ITEMS | 13 | 2,533,199.74 | 2,533,199.74 | ✓ |
| 2 - Main/46 | COMPOSITE ITEMS | 15 | 54,574.94 | 54,574.94 | ✓ |
| 2 - Main/47 | COMPOSITE ITEMS | 12 | 169,928.36 | 169,928.36 | ✓ |
| 2 - Main/48 | COMPOSITE ITEMS | 14 | 565,053.77 | 565,053.77 | ✓ |
| 2 - Main/49 | COMPOSITE ITEMS | 9 | 1,542,323.64 | 1,542,323.64 | ✓ |
| 2 - Main/50 | COMPOSITE ITEMS | 14 | 862,548.77 | 862,548.77 | ✓ |
| 2 - Main/51 | COMPOSITE ITEMS | 13 | 454,605.63 | 454,605.63 | ✓ |
| 2 - Main/52 | GENERALLY | 1 | 0.00 | 0.00 | ✓ |
| 2 - Main/53 | COVERS AND LININGS | 9 | 20,756,773.07 | 20,756,773.07 | ✓ |
| 2 - Main/54 | DAMP-PROOF COURSES | 4 | 1,331,955.01 | 1,331,955.01 | ✓ |
| 2 - Main/55 | INSULATION | 4 | 7,325,817.56 | 7,325,817.56 | ✓ |
| 2 - Main/56 | GENERALLY | 1 | 0.00 | 0.00 | ✓ |
| 2 - Main/57 | DOORS | 13 | 36,287,754.88 | 36,287,754.88 | ✓ |
| 2 - Main/58 | DOORS | 16 | 8,020,178.05 | 8,020,178.05 | ✓ |
| 2 - Main/59 | DOORS | 16 | 17,819,916.47 | 17,819,916.47 | ✓ |
| 2 - Main/60 | DOORS | 20 | 3,067,847.04 | 3,067,847.04 | ✓ |
| 2 - Main/61 | SCREENS | 16 | 1,721,885.53 | 1,721,885.53 | ✓ |
| 2 - Main/62 | EXTERNAL DOORS | 12 | 221,254.93 | 221,254.93 | ✓ |
| 2 - Main/63 | EXTERNAL DOORS | 12 | 1,401,325.44 | 1,401,325.44 | ✓ |
| 2 - Main/64 | SCREENS | 18 | 105,403,018.11 | 105,403,018.11 | ✓ |
| 2 - Main/65 | SCREENS | 18 | 4,210,676.70 | 4,210,676.70 | ✓ |
| 2 - Main/66 | SCREENS | 16 | 18,171,691.04 | 18,171,691.04 | ✓ |
| 2 - Main/67 | SCREENS | 13 | 1,654,722.98 | 1,654,722.98 | ✓ |
| 2 - Main/68 | SCREENS | 14 | 43,636,222.63 | 43,636,222.63 | ✓ |
| 2 - Main/69 | LOUVERS | 14 | 7,364,189.65 | 7,364,189.65 | ✓ |
| 2 - Main/70 | IRONMONGERY | 21 | 691,637.90 | 691,637.90 | ✓ |
| 2 - Main/71 | IRONMONGERY | 14 | 158,817.26 | 158,817.26 | ✓ |
| 2 - Main/72 | GENERALLY | 1 | 0.00 | 0.00 | ✓ |
| 2 - Main/73 | BACKGROUNDS | 17 | 53,017,306.14 | 53,017,306.14 | ✓ |
| 2 - Main/74 | BACKGROUNDS | 6 | 3,433,401.48 | 3,433,401.48 | ✓ |
| 2 - Main/75 | FLOOR FINISHES | 14 | 113,728,384.32 | 113,728,384.32 | ✓ |
| 2 - Main/76 | FLOOR FINISHES | 14 | 2,029,098.84 | 2,029,098.84 | ✓ |
| 2 - Main/77 | FLOOR FINISHES | 9 | 705,281.33 | 705,281.33 | ✓ |
| 2 - Main/78 | FLOOR FINISHES | 8 | 7,656,271.96 | 7,656,271.96 | ✓ |
| 2 - Main/79 | WALL FINISHES | 14 | 28,123,980.73 | 28,123,980.73 | ✓ |
| 2 - Main/80 | WALL FINISHES | 11 | 9,312,354.60 | 9,312,354.60 | ✓ |
| 2 - Main/81 | CEILING FINISHES | 6 | 1,616,507.24 | 1,616,507.24 | ✓ |
| 2 - Main/82 | SUNDRIES | 7 | 2,295,427.33 | 2,295,427.33 | ✓ |
| 2 - Main/83 | SUSPENDED CEILING | 16 | 12,723,276.69 | 12,723,276.69 | ✓ |
| 2 - Main/84 | SUSPENDED CEILING | 16 | 6,157,676.12 | 6,157,676.12 | ✓ |
| 2 - Main/85 | SUSPENDED CEILING | 18 | 5,835,876.01 | 5,835,876.01 | ✓ |
| 2 - Main/86 | DECORATIONS | 12 | 26,708,376.21 | 26,708,376.21 | ✓ |
| 2 - Main/87 | DECORATIONS | 12 | 17,996,861.25 | 17,996,861.25 | ✓ |
| 2 - Main/88 | SIGNWRITING | 14 | 3,149,593.24 | 3,149,593.24 | ✓ |
| 2 - Main/89 | GENERALLY | 4 | 3,507,301.35 | 3,507,301.35 | ✓ |
| 2 - Main/90 | TOILET ACCESSORIES | 20 | 150,969.21 | 150,969.21 | ✓ |
| 2 - Main/91 | TOILET ACCESSORIES | 21 | 3,572,412.20 | 3,572,412.20 | ✓ |
| 2 - Main/92 | KITCHEN ACCESSORIES | 7 | 1,083,007.14 | 1,083,007.14 | ✓ |
| 2 - Main/93 | SIGNAGE AND WAYFINDING | 20 | 1,745,459.19 | 1,745,459.19 | ✓ |
| 2 - Main/94 | SIGNAGE AND WAYFINDING | 22 | 1,669,070.36 | 1,669,070.36 | ✓ |
| 2 - Main/95 | PARKING ACCESSORIES | 13 | 553,728.17 | 553,728.17 | ✓ |
| 2 - Main/96 | PARKING ACCESSORIES | 3 | 279,068.34 | 279,068.34 | ✓ |
| 2 - Main/97 | PARTITIONS | 15 | 26,925,215.51 | 26,925,215.51 | ✓ |
| 2 - Main/98 | PARTITIONS | 12 | 6,004,024.97 | 6,004,024.97 | ✓ |
| 2 - Main/99 | TOILET PARTITION | 20 | 6,069,383.14 | 6,069,383.14 | ✓ |
| 2 - Main/100 | TOILET PARTITION | 12 | 3,434,462.47 | 3,434,462.47 | ✓ |
| 2 - Main/101 | WASTE CHUTES | 10 | 4,413,199.21 | 4,413,199.21 | ✓ |
| 2 - Main/102 | GENERALLY | 1 | 0.00 | 0.00 | ✓ |
| 2 - Main/103 | WHITE GOODS | 18 | 18,525,978.00 | 18,525,978.00 | ✓ |
| 2 - Main/104 | GYM EQUIPMENT | 25 | 0.00 | 0.00 | ✓ |
| 2 - Main/105 | BUILDING MANAGEMENT UNIT (BMU) | 3 | 10,726,004.99 | 10,726,004.99 | ✓ |
| 2 - Main/106 | BUILDING MANAGEMENT UNIT (BMU) | 8 | 1,794,248.70 | 1,794,248.70 | ✓ |
| 2 - Main/107 | BUILDING MANAGEMENT UNIT (BMU) | 8 | 1,470,428.35 | 1,470,428.35 | ✓ |
| 2 - Main/108 | GENERALLY | 1 | 0.00 | 0.00 | ✓ |
| 2 - Main/109 | LOOSE FF&E | 22 | 0.00 | 0.00 | ✓ |
| 2 - Main/110 | LOOSE FF&E | 21 | 0.00 | 0.00 | ✓ |
| 2 - Main/111 | LOOSE FF&E | 24 | 0.00 | 0.00 | ✓ |
| 2 - Main/112 | LOOSE FF&E | 20 | 0.00 | 0.00 | ✓ |
| 2 - Main/113 | LOOSE FF&E | 15 | 650,477.25 | 650,477.25 | ✓ |
| 2 - Main/114 | GENERALLY | 1 | 0.00 | 0.00 | ✓ |
| 2 - Main/115 | LIFTS | 8 | 0.00 | 0.00 | ✓ |
| 2 - Main/116 | LIFTS | 8 | 23,652,280.48 | 23,652,280.48 | ✓ |
| 2 - Main/117 | LIFTS | 6 | 29,305,752.38 | 29,305,752.38 | ✓ |
| 2 - Main/118 | LIFTS | 2 | 3,230,555.38 | 3,230,555.38 | ✓ |
| 2 - Main/119 | SUNDRIES | 4 | 0.00 | 0.00 | ✓ |
| 2 - Main/120 | BWIC | 6 | 1,123,771.76 | 1,123,771.76 | ✓ |
| 2 - Main/121 | GENERALLY | 1 | 0.00 | 0.00 | ✓ |
| 2 - Main/122 | SANITARY FIXTURES & FITTINGS | 16 | 2,331,889.00 | 2,331,889.00 | ✓ |
| 2 - Main/123 | SANITARY FIXTURES & FITTINGS | 16 | 10,087,556.00 | 10,087,556.00 | ✓ |
| 2 - Main/124 | SANITARY FIXTURES & FITTINGS | 15 | 3,072,907.12 | 3,072,907.12 | ✓ |
| 2 - Main/125 | SANITARY FIXTURES & FITTINGS | 12 | 2,909,787.00 | 2,909,787.00 | ✓ |
| 2 - Main/126 | SANITARY FIXTURES & FITTINGS | 8 | 0.00 | 0.00 | ✓ |
| 2 - Main/127 | DRAINAGE INSTALLATION | 18 | 3,255,545.00 | 3,255,545.00 | ✓ |
| 2 - Main/128 | DRAINAGE INSTALLATION | 16 | 1,859,642.28 | 1,859,642.28 | ✓ |
| 2 - Main/129 | DRAINAGE INSTALLATION | 9 | 970,960.00 | 970,960.00 | ✓ |
| 2 - Main/130 | DRAINAGE INSTALLATION | 17 | 1,200,868.00 | 1,200,868.00 | ✓ |
| 2 - Main/131 | DRAINAGE INSTALLATION | 15 | 7,395,391.00 | 7,395,391.00 | ✓ |
| 2 - Main/132 | DRAINAGE INSTALLATION | 17 | 3,126,322.00 | 3,126,322.00 | ✓ |
| 2 - Main/133 | DRAINAGE INSTALLATION | 15 | 1,791,616.00 | 1,791,616.00 | ✓ |
| 2 - Main/134 | DRAINAGE INSTALLATION | 10 | 214,245.81 | 214,245.81 | ✓ |
| 2 - Main/135 | DRAINAGE INSTALLATION | 10 | 210,803.00 | 210,803.00 | ✓ |
| 2 - Main/136 | DRAINAGE INSTALLATION | 11 | 366,346.77 | 366,346.77 | ✓ |
| 2 - Main/137 | DRAINAGE INSTALLATION | 2 | 159,253.00 | 159,253.00 | ✓ |
| 2 - Main/138 | WATER INSTALLATION | 19 | 6,284,720.00 | 6,284,720.00 | ✓ |
| 2 - Main/139 | WATER INSTALLATION | 15 | 2,364,103.00 | 2,364,103.00 | ✓ |
| 2 - Main/140 | WATER INSTALLATION | 12 | 3,509,187.60 | 3,509,187.60 | ✓ |
| 2 - Main/141 | WATER INSTALLATION | 18 | 877,503.00 | 877,503.00 | ✓ |
| 2 - Main/142 | WATER INSTALLATION | 16 | 210,365.00 | 210,365.00 | ✓ |
| 2 - Main/143 | WATER INSTALLATION | 15 | 3,238,943.00 | 3,238,943.00 | ✓ |
| 2 - Main/144 | WATER INSTALLATION | 8 | 2,111,683.00 | 2,111,683.00 | ✓ |
| 2 - Main/145 | WATER INSTALLATION | 7 | 702,945.00 | 702,945.00 | ✓ |
| 2 - Main/146 | WATER INSTALLATION | 8 | 467,030.00 | 467,030.00 | ✓ |
| 2 - Main/147 | WATER INSTALLATION | 5 | 161,357.00 | 161,357.00 | ✓ |
| 2 - Main/148 | FIRE PROTECTION SYSTEM | 5 | 9,185,815.00 | 9,185,815.00 | ✓ |
| 2 - Main/149 | FIRE PROTECTION SYSTEM | 17 | 17,754,337.00 | 17,754,337.00 | ✓ |
| 2 - Main/150 | FIRE PROTECTION SYSTEM | 21 | 5,196,104.00 | 5,196,104.00 | ✓ |
| 2 - Main/151 | FIRE PROTECTION SYSTEM | 11 | 2,711,841.00 | 2,711,841.00 | ✓ |
| 2 - Main/152 | FIRE PROTECTION SYSTEM | 7 | 5,407,910.00 | 5,407,910.00 | ✓ |
| 2 - Main/153 | FIRE PROTECTION SYSTEM | 10 | 1,729,692.00 | 1,729,692.00 | ✓ |
| 2 - Main/154 | FIRE PROTECTION SYSTEM | 9 | 58,060.00 | 58,060.00 | ✓ |
| 2 - Main/155 | FIRE PROTECTION SYSTEM | 10 | 1,647,932.00 | 1,647,932.00 | ✓ |
| 2 - Main/156 | FIRE PROTECTION SYSTEM | 5 | 580,168.00 | 580,168.00 | ✓ |
| 2 - Main/157 | HVAC INSTALLATION | 16 | 13,942,116.00 | 13,942,116.00 | ✓ |
| 2 - Main/158 | HVAC INSTALLATION | 16 | 3,820,783.00 | 3,820,783.00 | ✓ |
| 2 - Main/159 | HVAC INSTALLATION | 18 | 10,518,883.00 | 10,518,883.00 | ✓ |
| 2 - Main/160 | HVAC INSTALLATION | 13 | 6,454,809.00 | 6,454,809.00 | ✓ |
| 2 - Main/161 | HVAC INSTALLATION | 7 | 9,756,634.00 | 9,756,634.00 | ✓ |
| 2 - Main/162 | HVAC INSTALLATION | 7 | 2,947,775.00 | 2,947,775.00 | ✓ |
| 2 - Main/163 | HVAC INSTALLATION | 13 | 730,856.00 | 730,856.00 | ✓ |
| 2 - Main/164 | HVAC INSTALLATION | 9 | 14,592,063.80 | 14,592,063.80 | ✓ |
| 2 - Main/165 | HVAC INSTALLATION | 22 | 122,621.00 | 122,621.00 | ✓ |
| 2 - Main/166 | HVAC INSTALLATION | 21 | 120,785.00 | 120,785.00 | ✓ |
| 2 - Main/167 | HVAC INSTALLATION | 21 | 811,787.00 | 811,787.00 | ✓ |
| 2 - Main/168 | HVAC INSTALLATION | 22 | 271,272.00 | 271,272.00 | ✓ |
| 2 - Main/169 | HVAC INSTALLATION | 17 | 166,869.00 | 166,869.00 | ✓ |
| 2 - Main/170 | HVAC INSTALLATION | 21 | 505,706.00 | 505,706.00 | ✓ |
| 2 - Main/171 | HVAC INSTALLATION | 22 | 64,033.00 | 64,033.00 | ✓ |
| 2 - Main/172 | HVAC INSTALLATION | 20 | 168,877.00 | 168,877.00 | ✓ |
| 2 - Main/173 | HVAC INSTALLATION | 22 | 381,127.00 | 381,127.00 | ✓ |
| 2 - Main/174 | HVAC INSTALLATION | 22 | 29,979.00 | 29,979.00 | ✓ |
| 2 - Main/175 | HVAC INSTALLATION | 15 | 629,020.00 | 629,020.00 | ✓ |
| 2 - Main/176 | HVAC INSTALLATION | 21 | 748,272.00 | 748,272.00 | ✓ |
| 2 - Main/177 | HVAC INSTALLATION | 20 | 733,897.00 | 733,897.00 | ✓ |
| 2 - Main/178 | HVAC INSTALLATION | 14 | 474,471.00 | 474,471.00 | ✓ |
| 2 - Main/179 | HVAC INSTALLATION | 14 | 46,016.00 | 46,016.00 | ✓ |
| 2 - Main/180 | HVAC INSTALLATION | 14 | 58,340.00 | 58,340.00 | ✓ |
| 2 - Main/181 | HVAC INSTALLATION | 14 | 36,413.00 | 36,413.00 | ✓ |
| 2 - Main/182 | HVAC INSTALLATION | 14 | 41,640.00 | 41,640.00 | ✓ |
| 2 - Main/183 | HVAC INSTALLATION | 14 | 38,546.00 | 38,546.00 | ✓ |
| 2 - Main/184 | HVAC INSTALLATION | 14 | 355,812.00 | 355,812.00 | ✓ |
| 2 - Main/185 | HVAC INSTALLATION | 14 | 757,416.00 | 757,416.00 | ✓ |
| 2 - Main/186 | HVAC INSTALLATION | 14 | 212,346.00 | 212,346.00 | ✓ |
| 2 - Main/187 | HVAC INSTALLATION | 14 | 35,720.00 | 35,720.00 | ✓ |
| 2 - Main/188 | HVAC INSTALLATION | 14 | 33,372.00 | 33,372.00 | ✓ |
| 2 - Main/189 | HVAC INSTALLATION | 14 | 32,945.00 | 32,945.00 | ✓ |
| 2 - Main/190 | HVAC INSTALLATION | 14 | 431,779.00 | 431,779.00 | ✓ |
| 2 - Main/191 | HVAC INSTALLATION | 14 | 525,719.00 | 525,719.00 | ✓ |
| 2 - Main/192 | HVAC INSTALLATION | 14 | 35,827.00 | 35,827.00 | ✓ |
| 2 - Main/193 | HVAC INSTALLATION | 14 | 132,590.00 | 132,590.00 | ✓ |
| 2 - Main/194 | HVAC INSTALLATION | 14 | 113,659.00 | 113,659.00 | ✓ |
| 2 - Main/195 | HVAC INSTALLATION | 14 | 45,804.00 | 45,804.00 | ✓ |
| 2 - Main/196 | HVAC INSTALLATION | 14 | 82,731.00 | 82,731.00 | ✓ |
| 2 - Main/197 | HVAC INSTALLATION | 14 | 32,038.00 | 32,038.00 | ✓ |
| 2 - Main/198 | HVAC INSTALLATION | 14 | 39,720.00 | 39,720.00 | ✓ |
| 2 - Main/199 | HVAC INSTALLATION | 14 | 48,791.00 | 48,791.00 | ✓ |
| 2 - Main/200 | HVAC INSTALLATION | 14 | 49,220.00 | 49,220.00 | ✓ |
| 2 - Main/201 | HVAC INSTALLATION | 14 | 708,395.00 | 708,395.00 | ✓ |
| 2 - Main/202 | HVAC INSTALLATION | 14 | 689,784.00 | 689,784.00 | ✓ |
| 2 - Main/203 | HVAC INSTALLATION | 14 | 33,586.00 | 33,586.00 | ✓ |
| 2 - Main/204 | HVAC INSTALLATION | 14 | 34,495.00 | 34,495.00 | ✓ |
| 2 - Main/205 | HVAC INSTALLATION | 14 | 34,438.00 | 34,438.00 | ✓ |
| 2 - Main/206 | HVAC INSTALLATION | 14 | 40,096.00 | 40,096.00 | ✓ |
| 2 - Main/207 | HVAC INSTALLATION | 14 | 512,624.00 | 512,624.00 | ✓ |
| 2 - Main/208 | HVAC INSTALLATION | 14 | 333,826.00 | 333,826.00 | ✓ |
| 2 - Main/209 | HVAC INSTALLATION | 14 | 32,999.00 | 32,999.00 | ✓ |
| 2 - Main/210 | HVAC INSTALLATION | 14 | 31,132.00 | 31,132.00 | ✓ |
| 2 - Main/211 | HVAC INSTALLATION | 14 | 42,336.00 | 42,336.00 | ✓ |
| 2 - Main/212 | HVAC INSTALLATION | 14 | 43,087.00 | 43,087.00 | ✓ |
| 2 - Main/213 | HVAC INSTALLATION | 14 | 36,787.00 | 36,787.00 | ✓ |
| 2 - Main/214 | HVAC INSTALLATION | 14 | 32,787.00 | 32,787.00 | ✓ |
| 2 - Main/215 | HVAC INSTALLATION | 14 | 39,346.00 | 39,346.00 | ✓ |
| 2 - Main/216 | HVAC INSTALLATION | 14 | 36,093.00 | 36,093.00 | ✓ |
| 2 - Main/217 | HVAC INSTALLATION | 14 | 42,599.00 | 42,599.00 | ✓ |
| 2 - Main/218 | HVAC INSTALLATION | 14 | 41,374.00 | 41,374.00 | ✓ |
| 2 - Main/219 | HVAC INSTALLATION | 14 | 47,883.00 | 47,883.00 | ✓ |
| 2 - Main/220 | HVAC INSTALLATION | 14 | 52,311.00 | 52,311.00 | ✓ |
| 2 - Main/221 | HVAC INSTALLATION | 14 | 250,022.00 | 250,022.00 | ✓ |
| 2 - Main/222 | HVAC INSTALLATION | 14 | 48,364.00 | 48,364.00 | ✓ |
| 2 - Main/223 | HVAC INSTALLATION | 14 | 33,692.00 | 33,692.00 | ✓ |
| 2 - Main/224 | HVAC INSTALLATION | 14 | 37,053.00 | 37,053.00 | ✓ |
| 2 - Main/225 | HVAC INSTALLATION | 14 | 51,882.00 | 51,882.00 | ✓ |
| 2 - Main/226 | HVAC INSTALLATION | 14 | 34,920.00 | 34,920.00 | ✓ |
| 2 - Main/227 | HVAC INSTALLATION | 14 | 693,607.00 | 693,607.00 | ✓ |
| 2 - Main/228 | HVAC INSTALLATION | 14 | 585,813.00 | 585,813.00 | ✓ |
| 2 - Main/229 | HVAC INSTALLATION | 14 | 33,159.00 | 33,159.00 | ✓ |
| 2 - Main/230 | HVAC INSTALLATION | 14 | 31,131.00 | 31,131.00 | ✓ |
| 2 - Main/231 | HVAC INSTALLATION | 14 | 32,303.00 | 32,303.00 | ✓ |
| 2 - Main/232 | HVAC INSTALLATION | 14 | 28,997.00 | 28,997.00 | ✓ |
| 2 - Main/233 | HVAC INSTALLATION | 14 | 482,543.00 | 482,543.00 | ✓ |
| 2 - Main/234 | HVAC INSTALLATION | 14 | 701,116.00 | 701,116.00 | ✓ |
| 2 - Main/235 | HVAC INSTALLATION | 14 | 50,128.00 | 50,128.00 | ✓ |
| 2 - Main/236 | HVAC INSTALLATION | 14 | 30,812.00 | 30,812.00 | ✓ |
| 2 - Main/237 | HVAC INSTALLATION | 14 | 38,814.00 | 38,814.00 | ✓ |
| 2 - Main/238 | HVAC INSTALLATION | 14 | 36,199.00 | 36,199.00 | ✓ |
| 2 - Main/239 | HVAC INSTALLATION | 14 | 56,741.00 | 56,741.00 | ✓ |
| 2 - Main/240 | HVAC INSTALLATION | 14 | 36,360.00 | 36,360.00 | ✓ |
| 2 - Main/241 | HVAC INSTALLATION | 14 | 43,080.00 | 43,080.00 | ✓ |
| 2 - Main/242 | HVAC INSTALLATION | 14 | 39,881.00 | 39,881.00 | ✓ |
| 2 - Main/243 | HVAC INSTALLATION | 14 | 43,989.00 | 43,989.00 | ✓ |
| 2 - Main/244 | HVAC INSTALLATION | 14 | 37,054.00 | 37,054.00 | ✓ |
| 2 - Main/245 | HVAC INSTALLATION | 14 | 358,930.00 | 358,930.00 | ✓ |
| 2 - Main/246 | HVAC INSTALLATION | 14 | 818,928.00 | 818,928.00 | ✓ |
| 2 - Main/247 | HVAC INSTALLATION | 14 | 256,948.00 | 256,948.00 | ✓ |
| 2 - Main/248 | HVAC INSTALLATION | 14 | 203,760.00 | 203,760.00 | ✓ |
| 2 - Main/249 | HVAC INSTALLATION | 14 | 26,171.00 | 26,171.00 | ✓ |
| 2 - Main/250 | HVAC INSTALLATION | 14 | 38,973.00 | 38,973.00 | ✓ |
| 2 - Main/251 | HVAC INSTALLATION | 14 | 225,511.00 | 225,511.00 | ✓ |
| 2 - Main/252 | HVAC INSTALLATION | 14 | 480,208.00 | 480,208.00 | ✓ |
| 2 - Main/253 | HVAC INSTALLATION | 14 | 97,189.00 | 97,189.00 | ✓ |
| 2 - Main/254 | HVAC INSTALLATION | 14 | 29,906.00 | 29,906.00 | ✓ |
| 2 - Main/255 | HVAC INSTALLATION | 14 | 40,414.00 | 40,414.00 | ✓ |
| 2 - Main/256 | HVAC INSTALLATION | 14 | 35,987.00 | 35,987.00 | ✓ |
| 2 - Main/257 | HVAC INSTALLATION | 14 | 37,481.00 | 37,481.00 | ✓ |
| 2 - Main/258 | HVAC INSTALLATION | 14 | 44,788.00 | 44,788.00 | ✓ |
| 2 - Main/259 | HVAC INSTALLATION | 14 | 42,654.00 | 42,654.00 | ✓ |
| 2 - Main/260 | HVAC INSTALLATION | 11 | 1,360,500.00 | 1,360,500.00 | ✓ |
| 2 - Main/261 | HVAC INSTALLATION | 12 | 11,977,935.40 | 11,977,935.40 | ✓ |
| 2 - Main/262 | HVAC INSTALLATION | 18 | 239,819.00 | 239,819.00 | ✓ |
| 2 - Main/263 | HVAC INSTALLATION | 22 | 24,220.00 | 24,220.00 | ✓ |
| 2 - Main/264 | HVAC INSTALLATION | 22 | 25,959.00 | 25,959.00 | ✓ |
| 2 - Main/265 | HVAC INSTALLATION | 22 | 20,528.00 | 20,528.00 | ✓ |
| 2 - Main/266 | HVAC INSTALLATION | 21 | 164,437.00 | 164,437.00 | ✓ |
| 2 - Main/267 | HVAC INSTALLATION | 22 | 24,420.00 | 24,420.00 | ✓ |
| 2 - Main/268 | HVAC INSTALLATION | 22 | 21,872.00 | 21,872.00 | ✓ |
| 2 - Main/269 | HVAC INSTALLATION | 22 | 19,799.00 | 19,799.00 | ✓ |
| 2 - Main/270 | HVAC INSTALLATION | 20 | 18,730.00 | 18,730.00 | ✓ |
| 2 - Main/271 | HVAC INSTALLATION | 17 | 164,717.00 | 164,717.00 | ✓ |
| 2 - Main/272 | HVAC INSTALLATION | 20 | 53,548.00 | 53,548.00 | ✓ |
| 2 - Main/273 | HVAC INSTALLATION | 18 | 15,789.00 | 15,789.00 | ✓ |
| 2 - Main/274 | HVAC INSTALLATION | 5 | 8,439.00 | 8,439.00 | ✓ |
| 2 - Main/275 | HVAC INSTALLATION | 8 | 35,610.00 | 35,610.00 | ✓ |
| 2 - Main/276 | HVAC INSTALLATION | 15 | 14,204,629.00 | 14,204,629.00 | ✓ |
| 2 - Main/277 | HVAC INSTALLATION | 20 | 383,142.00 | 383,142.00 | ✓ |
| 2 - Main/278 | HVAC INSTALLATION | 21 | 335,287.00 | 335,287.00 | ✓ |
| 2 - Main/279 | HVAC INSTALLATION | 22 | 133,747.00 | 133,747.00 | ✓ |
| 2 - Main/280 | HVAC INSTALLATION | 20 | 240,549.00 | 240,549.00 | ✓ |
| 2 - Main/281 | HVAC INSTALLATION | 14 | 823,209.00 | 823,209.00 | ✓ |
| 2 - Main/282 | HVAC INSTALLATION | 17 | 174,059.00 | 174,059.00 | ✓ |
| 2 - Main/283 | HVAC INSTALLATION | 12 | 907,037.00 | 907,037.00 | ✓ |
| 2 - Main/284 | HVAC INSTALLATION | 13 | 910,502.00 | 910,502.00 | ✓ |
| 2 - Main/285 | HVAC INSTALLATION | 13 | 944,146.00 | 944,146.00 | ✓ |
| 2 - Main/286 | HVAC INSTALLATION | 11 | 226,151.00 | 226,151.00 | ✓ |
| 2 - Main/287 | HVAC INSTALLATION | 13 | 118,100.00 | 118,100.00 | ✓ |
| 2 - Main/288 | HVAC INSTALLATION | 14 | 249,675.00 | 249,675.00 | ✓ |
| 2 - Main/289 | HVAC INSTALLATION | 12 | 161,940.00 | 161,940.00 | ✓ |
| 2 - Main/290 | HVAC INSTALLATION | 7 | 69,465.00 | 69,465.00 | ✓ |
| 2 - Main/291 | LPG INSTALLATION | 1 | 1,135,848.00 | 1,135,848.00 | ✓ |
| 2 - Main/292 | LPG INSTALLATION | 10 | 971,914.00 | 971,914.00 | ✓ |
| 2 - Main/293 | LPG INSTALLATION | 14 | 2,903,254.00 | 2,903,254.00 | ✓ |
| 2 - Main/294 | LPG INSTALLATION | 5 | 384,681.00 | 384,681.00 | ✓ |
| 2 - Main/295 | SUNDRIES | 9 | 0.00 | 0.00 | ✓ |
| 2 - Main/296 | SUNDRIES | 1 | 0.00 | 0.00 | ✓ |
| 2 - Main/297 | WORK INCIDENTAL AND BWIC | 9 | 0.00 | 0.00 | ✓ |
| 2 - Main/298 | WORK INCIDENTAL AND BWIC | 3 | 13,389,780.12 | 13,389,780.12 | ✓ |
| 2 - Main/299 | GENERALLY | 3 | 1,184,253.00 | 1,184,253.00 | ✓ |
| 2 - Main/300 | POWER INSTALLATION | 6 | 47,646.00 | 47,646.00 | ✓ |
| 2 - Main/301 | POWER INSTALLATION | 16 | 107,264.00 | 107,264.00 | ✓ |
| 2 - Main/302 | POWER INSTALLATION | 13 | 79,630.00 | 79,630.00 | ✓ |
| 2 - Main/303 | POWER INSTALLATION | 15 | 351,348.00 | 351,348.00 | ✓ |
| 2 - Main/304 | POWER INSTALLATION | 16 | 478,860.00 | 478,860.00 | ✓ |
| 2 - Main/305 | POWER INSTALLATION | 10 | 113,790.00 | 113,790.00 | ✓ |
| 2 - Main/306 | POWER INSTALLATION | 10 | 232,947.00 | 232,947.00 | ✓ |
| 2 - Main/307 | POWER INSTALLATION | 13 | 498,754.00 | 498,754.00 | ✓ |
| 2 - Main/308 | POWER INSTALLATION | 11 | 304,274.00 | 304,274.00 | ✓ |
| 2 - Main/309 | POWER INSTALLATION | 14 | 23,128.00 | 23,128.00 | ✓ |
| 2 - Main/310 | POWER INSTALLATION | 12 | 33,852.00 | 33,852.00 | ✓ |
| 2 - Main/311 | POWER INSTALLATION | 15 | 76,132.00 | 76,132.00 | ✓ |
| 2 - Main/312 | POWER INSTALLATION | 21 | 91,437.00 | 91,437.00 | ✓ |
| 2 - Main/313 | POWER INSTALLATION | 22 | 61,439.00 | 61,439.00 | ✓ |
| 2 - Main/314 | POWER INSTALLATION | 22 | 77,787.00 | 77,787.00 | ✓ |
| 2 - Main/315 | POWER INSTALLATION | 22 | 50,183.00 | 50,183.00 | ✓ |
| 2 - Main/316 | POWER INSTALLATION | 21 | 112,292.00 | 112,292.00 | ✓ |
| 2 - Main/317 | POWER INSTALLATION | 14 | 334,665.00 | 334,665.00 | ✓ |
| 2 - Main/318 | POWER INSTALLATION | 15 | 79,998.00 | 79,998.00 | ✓ |
| 2 - Main/319 | POWER INSTALLATION | 17 | 179,024.00 | 179,024.00 | ✓ |
| 2 - Main/320 | POWER INSTALLATION | 17 | 232,021.00 | 232,021.00 | ✓ |
| 2 - Main/321 | POWER INSTALLATION | 15 | 290,244.00 | 290,244.00 | ✓ |
| 2 - Main/322 | POWER INSTALLATION | 15 | 200,799.00 | 200,799.00 | ✓ |
| 2 - Main/323 | POWER INSTALLATION | 16 | 131,052.00 | 131,052.00 | ✓ |
| 2 - Main/324 | POWER INSTALLATION | 16 | 241,267.00 | 241,267.00 | ✓ |
| 2 - Main/325 | POWER INSTALLATION | 19 | 111,287.00 | 111,287.00 | ✓ |
| 2 - Main/326 | POWER INSTALLATION | 14 | 308,535.00 | 308,535.00 | ✓ |
| 2 - Main/327 | POWER INSTALLATION | 17 | 129,243.00 | 129,243.00 | ✓ |
| 2 - Main/328 | POWER INSTALLATION | 16 | 155,172.00 | 155,172.00 | ✓ |
| 2 - Main/329 | POWER INSTALLATION | 14 | 274,097.00 | 274,097.00 | ✓ |
| 2 - Main/330 | POWER INSTALLATION | 18 | 104,520.00 | 104,520.00 | ✓ |
| 2 - Main/331 | POWER INSTALLATION | 14 | 276,241.00 | 276,241.00 | ✓ |
| 2 - Main/332 | POWER INSTALLATION | 18 | 210,648.00 | 210,648.00 | ✓ |
| 2 - Main/333 | POWER INSTALLATION | 16 | 267,062.00 | 267,062.00 | ✓ |
| 2 - Main/334 | POWER INSTALLATION | 14 | 151,877.00 | 151,877.00 | ✓ |
| 2 - Main/335 | POWER INSTALLATION | 14 | 102,330.00 | 102,330.00 | ✓ |
| 2 - Main/336 | POWER INSTALLATION | 12 | 72,810.00 | 72,810.00 | ✓ |
| 2 - Main/337 | POWER INSTALLATION | 11 | 140,580.00 | 140,580.00 | ✓ |
| 2 - Main/338 | POWER INSTALLATION | 13 | 127,530.00 | 127,530.00 | ✓ |
| 2 - Main/339 | POWER INSTALLATION | 14 | 104,490.00 | 104,490.00 | ✓ |
| 2 - Main/340 | POWER INSTALLATION | 14 | 88,290.00 | 88,290.00 | ✓ |
| 2 - Main/341 | POWER INSTALLATION | 15 | 114,834.00 | 114,834.00 | ✓ |
| 2 - Main/342 | POWER INSTALLATION | 15 | 118,762.00 | 118,762.00 | ✓ |
| 2 - Main/343 | POWER INSTALLATION | 13 | 158,137.00 | 158,137.00 | ✓ |
| 2 - Main/344 | POWER INSTALLATION | 14 | 154,155.00 | 154,155.00 | ✓ |
| 2 - Main/345 | POWER INSTALLATION | 13 | 384,856.00 | 384,856.00 | ✓ |
| 2 - Main/346 | POWER INSTALLATION | 14 | 273,944.00 | 273,944.00 | ✓ |
| 2 - Main/347 | POWER INSTALLATION | 11 | 452,888.00 | 452,888.00 | ✓ |
| 2 - Main/348 | POWER INSTALLATION | 14 | 41,933.00 | 41,933.00 | ✓ |
| 2 - Main/349 | POWER INSTALLATION | 14 | 36,099.00 | 36,099.00 | ✓ |
| 2 - Main/350 | POWER INSTALLATION | 14 | 37,737.00 | 37,737.00 | ✓ |
| 2 - Main/351 | POWER INSTALLATION | 17 | 60,251.00 | 60,251.00 | ✓ |
| 2 - Main/352 | POWER INSTALLATION | 21 | 49,704.00 | 49,704.00 | ✓ |
| 2 - Main/353 | POWER INSTALLATION | 20 | 79,876.00 | 79,876.00 | ✓ |
| 2 - Main/354 | POWER INSTALLATION | 20 | 98,876.00 | 98,876.00 | ✓ |
| 2 - Main/355 | POWER INSTALLATION | 20 | 96,368.00 | 96,368.00 | ✓ |
| 2 - Main/356 | POWER INSTALLATION | 16 | 69,776.00 | 69,776.00 | ✓ |
| 2 - Main/357 | POWER INSTALLATION | 19 | 172,700.00 | 172,700.00 | ✓ |
| 2 - Main/358 | POWER INSTALLATION | 13 | 89,900.00 | 89,900.00 | ✓ |
| 2 - Main/359 | POWER INSTALLATION | 15 | 88,500.00 | 88,500.00 | ✓ |
| 2 - Main/360 | POWER INSTALLATION | 14 | 445,920.00 | 445,920.00 | ✓ |
| 2 - Main/361 | POWER INSTALLATION | 13 | 895,074.00 | 895,074.00 | ✓ |
| 2 - Main/362 | POWER INSTALLATION | 10 | 1,064,396.00 | 1,064,396.00 | ✓ |
| 2 - Main/363 | POWER INSTALLATION | 10 | 4,799,464.00 | 4,799,464.00 | ✓ |
| 2 - Main/364 | POWER INSTALLATION | 15 | 2,132,897.00 | 2,132,897.00 | ✓ |
| 2 - Main/365 | POWER INSTALLATION | 22 | 0.00 | 0.00 | ✓ |
| 2 - Main/366 | POWER INSTALLATION | 17 | 0.00 | 0.00 | ✓ |
| 2 - Main/367 | POWER INSTALLATION | 17 | 0.00 | 0.00 | ✓ |
| 2 - Main/368 | POWER INSTALLATION | 16 | 0.00 | 0.00 | ✓ |
| 2 - Main/369 | POWER INSTALLATION | 16 | 0.00 | 0.00 | ✓ |
| 2 - Main/370 | POWER INSTALLATION | 18 | 0.00 | 0.00 | ✓ |
| 2 - Main/371 | POWER INSTALLATION | 15 | 804,950.00 | 804,950.00 | ✓ |
| 2 - Main/372 | POWER INSTALLATION | 14 | 16,085,880.00 | 16,085,880.00 | ✓ |
| 2 - Main/373 | POWER INSTALLATION | 16 | 11,307,939.00 | 11,307,939.00 | ✓ |
| 2 - Main/374 | POWER INSTALLATION | 18 | 2,142,426.00 | 2,142,426.00 | ✓ |
| 2 - Main/375 | POWER INSTALLATION | 22 | 207,626.00 | 207,626.00 | ✓ |
| 2 - Main/376 | POWER INSTALLATION | 22 | 202,361.00 | 202,361.00 | ✓ |
| 2 - Main/377 | POWER INSTALLATION | 22 | 247,736.00 | 247,736.00 | ✓ |
| 2 - Main/378 | POWER INSTALLATION | 22 | 201,723.00 | 201,723.00 | ✓ |
| 2 - Main/379 | POWER INSTALLATION | 22 | 190,128.00 | 190,128.00 | ✓ |
| 2 - Main/380 | POWER INSTALLATION | 22 | 183,915.00 | 183,915.00 | ✓ |
| 2 - Main/381 | POWER INSTALLATION | 20 | 188,760.00 | 188,760.00 | ✓ |
| 2 - Main/382 | POWER INSTALLATION | 22 | 207,157.00 | 207,157.00 | ✓ |
| 2 - Main/383 | POWER INSTALLATION | 22 | 159,666.00 | 159,666.00 | ✓ |
| 2 - Main/384 | POWER INSTALLATION | 22 | 207,636.00 | 207,636.00 | ✓ |
| 2 - Main/385 | POWER INSTALLATION | 22 | 205,987.00 | 205,987.00 | ✓ |
| 533 blocks · 1 do not tie | 2,715,670,000.00 | ||||
Source verification
Independent checks of the imported result against the raw workbook.✓ item count
Independent re-count matches on all 4 sheets (7323 items).
✓ qty integrity
Quantity sums match the raw cells on every sheet.
✓ amount integrity
Amount sums match the raw cells on every sheet.
✗ row coverage
1 unaccounted row: Bill 4 row 16: 10000 "Builders work for Workforce Productivity"
✓ mirror
Cell-for-cell fidelity: descriptions, codes, and the number/text/empty state of every qty, rate and amount match the raw cells (29292 cells compared).
✓ summary map
2 summary sheets, 2 entries: 2 matched to imported totals · imported but absent from every summary: 2 - Main, 3 - Ext, Bill 4
✓ summary self check
The workbook's own summaries are internally consistent (5 checks across 3 sheets).
✓ section tie
25/27 declared sections tie to the cent · declared but not in this import: 1/GR “GENERAL REQUIREMENTS FOR THE WHOLE OF TH” declared 324986009.87; 4/PS “PROVISIONAL SUMS” declared 4960000.00 · 117 lines carry no section reference
✓ zone tie
band identified arithmetically as BASEMENTS · GF & PODIUM · TOWER 1 · TOWER 2 · TOWER 3 · TOWER 4 (the identity held on 385/385 sampled priced rows) · 150/150 declared zone cells tie · the bidder keeps their own check on 7194 rows: we agree on 6696, differ on 2 (493 not comparable because the Amount cell prints words — their formula compares a number against text, which Excel makes FALSE whatever the arithmetic; 3 because a zone cell prints words)
✗ tender tie
Declared tender 2715680000.00 − this import 2715670000.00 = 10000.00. Declared scopes absent from this import come to 329946009.87 (1/GR, 4/PS), so this import holds 329936009.87 MORE than the summary declares — imported sheets the summary never names: Bill 4.
✗ amount in words
The words say 1715680000.00 but the sheet prints 2715680000.00: “…TWO BILLION SEVEN HUNDRED AND FIFTEEN MILLION SIX HUNDRED AND EIGHTY THOUSAND DIRHAMS ONL”
✗ summary echo
3/4 sheet totals re-stated verbatim by the workbook's own summary sheets (missing: Bill 4)